← Back
BuildNYC
Old law tenement
839 HUNTS POINT AVENUE
BRONX · Hunts Point · BIN 2005952
💬 Discuss this project
1904Year Built
4Stories
C4Building Class
R6Zoning
10,560 sfGross Floor Area
8Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Old law tenement · Owner of record: NYC Housing Authority · 3,900 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRoofing replacement and rooftop structure renovation2 filings · 16 docs
Floor 41 filing · 12 docs
Floor 31 filing · 12 docs
Floor 21 filing · 12 docs
Floor 11 filing · 12 docs
Cellar1 filing · 12 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction17p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority2811/10/2026
Hunts Point Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Old Structures Engineering111/09/2026
IMEG Consulting203/24/2026
Curtis + Ginsberg Architects103/24/2026
Joel Phagoo P.E.303/06/2025
Dseny Engineering Services102/14/2023
Odc Associates111/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services203/21/2026
Dseny Engineering Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Raven Construction ServicesScaffold1203/21/2026
Zoria HousingScaffold908/11/2026
Vikrant Contracting & BuilderScaffold407/08/2026
Q.Y. ElectricElectrical103/21/2026
Dreamland ConstructionGeneral Contractor309/14/2013
Building Lifecycle
11/09/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01363442-S4
11/08/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
X00848424-I1-SH
11/03/2026
Special inspection requirement — Preliminary
11/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/03/2026
Special inspection requirement — Post-installed Anchors
74 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedZoria Housing08/10/2026
DOB NOWSidewalk ShedPermit IssuedZoria Housing05/22/2026
DOB NOWConstruction FencePermit IssuedZoria Housing03/17/2026
DOB NOWSidewalk ShedPermit IssuedZoria Housing02/25/2026
DOB NOWConstruction FencePermit IssuedZoria Housing03/17/2025
DOB NOWSidewalk ShedSigned-offRaven Construction Services03/05/2025
DOB NOWSidewalk ShedSigned-offRaven Construction Services03/05/2025
DOB NOWSidewalk ShedPermit IssuedZoria Housing02/28/2025
DOB NOWSidewalk ShedPermit IssuedVikrant Contracting & Builders04/16/2024
DOB NOWConstruction FencePermit IssuedZoria Housing03/22/2024
DOB NOWSidewalk ShedPermit IssuedVikrant Contracting & Builders03/21/2024
DOB NOWSidewalk ShedSigned-offRaven Construction Services03/06/2024
DOB NOWSidewalk ShedPermit IssuedVikrant Contracting & Builders03/27/2023
DOB NOWConstruction FencePermit IssuedZoria Housing03/27/2023
DOB NOWSidewalk ShedSigned-offRaven Construction Services03/01/2023
BISOTISSUEDDreamland Construction09/14/2013
BISEQISSUEDDreamland Construction06/10/2013
BISEQISSUEDDreamland Construction05/17/2012
1 project · most recent 11/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/09/2026——Gas, Water/Sanitary
1 project · most recent 03/14/2023
FiledStatusContractorScope
03/14/2023Permit IssuedQ.Y. Electric—
1 project · most recent 11/09/2026
Concrete Masonry
FiledStatusContractorScope
11/09/2026——Concrete, Masonry
2 projects · most recent 03/06/2025
Sidewalk Shed Fence
FiledStatusContractorScope
03/06/2025Permit IssuedZoria HousingSidewalk Shed
03/24/2023Permit IssuedZoria HousingFence
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
11/03/2026Preliminary—progress
11/03/2026Structural Stability – Alterations of existing buildings—special
11/03/2026Post-installed Anchors—special
11/03/2026Masonry—special
06/25/2026Tenant Protection Plan Compliance—special
06/25/2026Final—progress
03/19/2026Chimneys and vents—special
03/19/2026Fire-Resistant Penetrations and Joints—special
03/19/2026Post-installed Anchors—special
03/12/2026Energy Code Compliance Inspections—progress
03/12/2026Heating Systems—special
03/12/2026HVAC-R and service water piping design and insulation—energy_progress
03/12/2026HVAC-R and service water heating equipment—energy_progress
03/12/2026HVAC-R and service water heating system controls—energy_progress
03/12/2026Maintenance information—energy_progress
03/12/2026Shutoff dampers—energy_progress
03/11/2026Fire-Resistant Penetrations and Joints—special
03/11/2026Post-installed Anchors—special
03/06/2026Vestibules—energy_progress
03/06/2026Insulation placement and R values—energy_progress
03/06/2026Fenestration air leakage—energy_progress
02/25/2026Tenant Protection Plan Compliance—special
02/25/2026Tenant Protection Plan Compliance—special
02/25/2026Final—progress
02/25/2026Mechanical Systems—special
Latest 25 of 35.
51 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account