← Back
Two family frame
84-02 89 AVENUE
QUEENS · Woodhaven · BIN 4185411
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R3-1Zoning
2,228 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 1,800 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
General
Cellar3p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIKE TECH ASSOCIATES LLC407/13/2023
SOUNDVIEW ENGINEERING P.C.104/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TDA CONSULTING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WATKINS CONSTRUCTION MGTGeneral Contractor303/21/2026
DIOMEDES E ARBOLEDAGeneral Contractor107/08/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965109/02/2022
Building Lifecycle
All (31)Filed (5)Permit Issued (3)Signed Off (3)Violation (4)Inspection (7)Objection (8)Special Inspection (1)
12/08/2023
Signed off — Alteration
LEGALIZED PLUMBING FIXTURES AS PER PLANS. THREE PIECE BATHROOM, ONE HAND SINK, ONE SLOP SINK , ONE WASHER MACHINE AND ONE GAS DRYER AT CELLAR FLOOR. TOILET FIXTURES IN BEDROOM AT FIRST FLOOR.
Q00792628-S1
11/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/05/2023
Signed off — Alteration
LEGALIZED PLUMBING FIXTURES AS PER PLANS. THREE PIECE BATHROOM, ONE HAND SINK, ONE SLOP SINK , ONE WASHER MACHINE AND ONE GAS DRYER AT CELLAR FLOOR. TOILET FIXTURES IN BEDROOM AT FIRST FLOOR.
Q00792628-I1
10/04/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/13/2023
Filed — Alteration
LEGALIZED PLUMBING FIXTURES AS PER PLANS. THREE PIECE BATHROOM, ONE HAND SINK, ONE SLOP SINK , ONE WASHER MACHINE AND ONE GAS DRYER AT CELLAR FLOOR. TOILET FIXTURES IN BEDROOM AT FIRST FLOOR.
Q00792628-P2
06/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/11/2023
Signed off — Alteration
Q00851847-I1
04/21/2023
Permit issued — General Construction
Q00851847-I1-GC
04/04/2023
Filed — Alteration
LEGALIZED PLUMBING FIXTURES AS PER PLANS. THREE PIECE BATHROOM, ONE HAND SINK, ONE SLOP SINK , ONE WASHER MACHINE AND ONE GAS DRYER AT CELLAR FLOOR. TOILET FIXTURES IN BEDROOM AT FIRST FLOOR.
Q00792628-P1
04/03/2023
Filed — Alteration
Q00851847-I1
03/29/2023
Special inspection requirement — Final
PETER RUPPERT
03/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/30/2023
Permit issued — Plumbing
Q00792628-S1-PL
12/28/2022
Filed — Alteration
LEGALIZED PLUMBING FIXTURES AS PER PLANS. THREE PIECE BATHROOM, ONE HAND SINK, ONE SLOP SINK , ONE WASHER MACHINE AND ONE GAS DRYER AT CELLAR FLOOR. TOILET FIXTURES IN BEDROOM AT FIRST FLOOR.
Q00792628-S1
12/22/2022
Permit issued — General Construction
Q00792628-I1-GC
11/23/2022
Objection resolved — Addressed
11/21/2022
Objection resolved — Addressed
11/21/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Scope
09/23/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Zoning
09/07/2022
Objection raised — Zoning
09/07/2022
Objection raised — Scope
09/02/2022
Filed — Alteration
LEGALIZED PLUMBING FIXTURES AS PER PLANS. THREE PIECE BATHROOM, ONE HAND SINK, ONE SLOP SINK , ONE WASHER MACHINE AND ONE GAS DRYER AT CELLAR FLOOR. TOILET FIXTURES IN BEDROOM AT FIRST FLOOR.
Q00792628-I1
05/02/1999
Violation issued (ECB, closed)
Quality of Life
01/09/1997
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
01/09/1997
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
08/07/1996
Violation issued (ECB, closed)
HPD
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDIOMEDES E ARBOLEDA04/21/2023
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP01/30/2023
DOB NOWGeneral ConstructionSigned-offWATKINS CONSTRUCTION MGT12/22/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/04/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/29/2023FinalPETER RUPPERTprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q00851847-I1Request digital key ↗
08/24/2026Q00792628-S1Request digital key ↗
08/24/2026Q00792628-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00792628-S1Open ↗
08/13/2026Q00792628-I1Open ↗
08/13/2026Q00792628-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q00851847-I1Open ↗
08/24/2026Q00792628-S1Open ↗
08/24/2026Q00792628-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026Q00851847-I1Open ↗