← Back
One story retail building
84-02 ASTORIA BOULEVARD
QUEENS · East Elmhurst · BIN 4624716
💬 Discuss this project
1952Year Built
1Stories
K1Building Class
R4Zoning
16,850 sfGross Floor Area
16Units
13 Open Violations 9 unresolved · 4 paperwork only ▸
One story retail building · Owner of record: DANZYLAND, · 35,020 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof10p · 6 filings · 20 docs
Floor 212p · 4 filings · 20 docs
Floor 112p · 5 filings · 20 docs
Cellar10p · 5 filings · 20 docs
Sub-Cellar13p · 5 filings · 20 docs
Basement12p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DANZYLAND3303/22/2026
84TH STREET CLEANERS103/22/2026
OWNER OF 84-02 ASTORIA BL103/22/2026
SERRANZA PROPERTIES103/22/2026
HIPPODROME SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP403/21/2026
ISHAC DESIGN ARCHITECTS203/21/2026
LGML GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAMDEEN, BALDATHElectrical703/21/2026
REDROVAN ELIASElectrical703/21/2026
ADAMS EUROPEAN CONTNG INCElectrical103/21/2026
STAHL, MARVINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H & A OF NEW YORK ENGINEE642211/26/2025
ISHAC DESIGN ARCHITECTS P39181309/13/2025
Building Lifecycle
All (132)Filed (18)Violation (26)Objection (58)Special Inspection (30)
02/05/2026
Special inspection requirement — Subgrade Inspections
Paul Pizzimenti
02/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Paul Pizzimenti
02/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Paul Pizzimenti
01/28/2026
Objection resolved — Addressed
12/03/2025
Objection raised — Admin
11/26/2025
Filed — Alteration
Provide support of excavation for new foundation
Q00983771-P1
10/10/2025
Special inspection requirement — Structural Cold-Formed Steel
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NABIL ISHAC
10/10/2025
Special inspection requirement — Structural Steel - High Strength Bolting
10/10/2025
Special inspection requirement — Concrete - Cast-In-Place
NABIL ISHAC
10/10/2025
Special inspection requirement — Final
NABIL ISHAC
10/10/2025
Special inspection requirement — Structural Steel - Details
10/10/2025
Special inspection requirement — Masonry
NABIL ISHAC
10/10/2025
Special inspection requirement — Structural Steel - Welding
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
10/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
NABIL ISHAC
10/07/2025
Special inspection requirement — Sprinkler Systems
10/07/2025
Special inspection requirement — Standpipe Systems
10/02/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Cost
09/22/2025
Objection resolved — Addressed
09/19/2025
Special inspection requirement — Final
NABIL ISHAC
09/19/2025
Special inspection requirement — Heating Systems
NABIL ISHAC
09/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NABIL ISHAC
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
09/19/2025
Special inspection requirement — Mechanical Systems
NABIL ISHAC
09/16/2025
Filed — Alteration
Install a stand pipe system throughout the New Building filed under NB Q00889910-I1
Q00921589-P2
09/16/2025
Special inspection requirement — Standpipe Systems
09/15/2025
Objection resolved — Addressed
09/13/2025
Filed — Alteration
Install 224 fixtures and gas equipment in a three story and 2 cellars commercial new building and in six- two story residential new buildings.
Q00898701-P2
09/12/2025
Filed — Alteration
Install a new sprinkler system in a proposed new building filed under NB Q00889910-I1.
Q00920585-P2
09/11/2025
Special inspection requirement — Sprinkler Systems
08/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
08/21/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
08/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NABIL ISHAC
08/21/2025
Special inspection requirement — Concrete - Cast-In-Place
NABIL ISHAC
08/21/2025
Special inspection requirement — Masonry
NABIL ISHAC
08/21/2025
Special inspection requirement — Aluminum Construction
08/21/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
NABIL ISHAC
06/12/2025
Objection raised — Admin
06/03/2025
Objection raised — Scope
05/28/2025
Filed — Alteration
Install a stand pipe system throughout the New Building filed under NB Q00889910-I1
Q00921589-P1
05/28/2025
Filed — Alteration
Install a new MS system for garage, medical office and retail stores part of NB Q00889910.
Q00926739-P1
05/28/2025
Filed — Alteration
Install a new sprinkler system in a proposed new building filed under NB Q00889910-I1.
Q00920585-P1
05/28/2025
Filed — Alteration
Erect a new three story, a cellar and a sub-cellar class 1 reinforced concrete building
Q00921604-P1
05/27/2025
Filed — Alteration
Install 224 fixtures and gas equipment in a three story and 2 cellars commercial new building and in six- two story residential new buildings.
Q00898701-P1
03/28/2025
Filed — New Building
Q00889910-P1
04/04/2024
Objection resolved — Addressed
03/22/2024
Objection raised — Other
03/08/2024
Filed — Full Demolition
Full demolition of one story and cellar building
Q01005278-I1
02/15/2024
Objection resolved — Addressed
02/01/2024
Objection resolved — Addressed
01/11/2024
Objection resolved — Addressed
01/11/2024
Objection resolved — Addressed
01/11/2024
Objection resolved — Addressed
01/10/2024
Objection raised — Other
01/08/2024
Filed — Alteration
Provide support of excavation for new foundation
Q00983771-I1
01/02/2024
Objection resolved — Addressed
12/18/2023
Objection raised — Inspections
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISBLISSUEDSEICKEL & SONS PLBG. INC06/08/2015
BISPLISSUEDSEICKEL & SONS PLBG. INC06/08/2015
BISPLISSUEDAP PLUMBING & HVAC LLC03/24/2015
BISMHISSUEDHOTEL MAINTENANCE & SUPP*02/19/2014
BISOTISSUEDHOTEL MAINTENANCE & SUPP*02/19/2014
BISMHISSUEDHOTEL MAINTENANCE & SUPP*02/19/2014
BISMHISSUEDTIME SQUARE CLEANING CORP11/27/2013
BISOTISSUEDTIME SQUARE CLEANING CORP07/15/2013
BISOTISSUEDCLASSIC LAUNDRY AND LINEN07/08/2013
BISPLISSUEDFERNANDEZ HTG & MECH CORP.11/08/2012
BISMHISSUEDACE'S MECHANIC INC11/02/2012
BISPLISSUEDS.J. VISION & SON P & H10/25/2012
BISOTISSUEDSELLING DREAMS LLC10/19/2012
BISMHISSUEDCLASSIC LAUNDRY AND LINE07/24/2012
BISOTISSUEDCLASSIC LAUNDRY AND LINE07/24/2012
BISMHISSUEDHONG KONG STYLE CONSTRUCT11/09/2011
BISOTISSUEDHONG KONG STYLE CONSTRUCT11/09/2011
BISPLISSUEDCATMAN PLUMBING INC07/29/2011
BISMHISSUEDCLASSIC LAUNDRY AND LINE*05/25/2011
BISOTISSUEDCLASSIC LAUNDRY AND LINE*05/25/2011
BISOTISSUEDA INTERNATIONAL LTD05/02/2011
BISOTISSUEDSCHLAEFFEN LAUNDROMAT COR11/15/2010
BISMHISSUEDSCHLAEFFEN LAUNDROMAT COR11/15/2010
BISMHISSUEDDANZYLAND, LLC12/23/2009
BISOTISSUEDDANZYLAND, LLC12/10/2009
BISMHISSUEDDANZYLAND LLC10/28/2008
BISOTISSUEDDANZYLAND LLC10/28/2008
BISMHISSUEDDANZYLAND LLC03/13/2008
BISOTISSUEDDANZYLAND LLC10/18/2007
BISPLISSUEDTHE PLUMBIG CO INC07/11/2007
BISOTISSUEDDANZYLAND LLC04/06/2007
BISMHISSUEDOVR INC.05/10/2001
BISBLISSUEDAMBASSADOR FUEL & OIL CORP11/17/1999
BISPLISSUEDCATMAN PLUMBING INC08/26/1998
BISFPISSUEDMASTER FIRE PREVENTION SYSTEM08/18/1998
BISMHISSUEDWKL CONST INC08/10/1998
BISPLISSUEDMASTER PLUMBER06/10/1996
BISPLISSUEDMASTER PLUMBER06/10/1996
BISSPRE-ISSUEDALLOCCA MECHANCAL_PLG & HTG10/23/1992
BISPLISSUEDCATMAN PLUMBING INC07/01/1992
+ 5 more permits on file
1 project · most recent 05/28/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2025——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PURY-HP 120TNU-A 136,000 BTU · Vrf Outdoor ×1
Heat / Cool
Mitsubishi Electric PURY-HP120TNU-A 120,000 BTU · Vrf Outdoor ×16
PURY-HP 120TNU-A 120,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric PURY-HP120TNU-A 136,000 BTU · Vrf Outdoor ×20
PURY-HP 120TNU-A 136,000 BTU · Vrf Outdoor ×4
Ventilation
Mitsubishi Electric PURY-HP 120TNU-A 136,000 BTU · Vrf Outdoor ×1
2 projects · most recent 09/16/2025
FiledStatusContractorScope
09/16/2025——6 outlets
09/12/2025——830 heads
3 projects · most recent 09/16/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/16/2025———
09/13/2025——Gas, Storm, Water/Sanitary
09/12/2025———
2 projects · most recent 11/26/2025
Concrete Masonry
FiledStatusContractorScope
11/26/2025——1 scope_items
05/28/2025——Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
02/05/2026Subsurface Conditions – Fill Placement & In-Place DensityPaul Pizzimentispecial
02/05/2026Excavations - Sheeting, Shoring, and BracingPaul Pizzimentispecial
02/05/2026Subgrade InspectionsPaul Pizzimentispecial
10/10/2025Structural Steel - Details—special
10/10/2025FinalNABIL ISHACprogress
10/10/2025MasonryNABIL ISHACspecial
10/10/2025Structural Steel - Welding—special
10/10/2025Concrete - Cast-In-PlaceNABIL ISHACspecial
10/10/2025Structural Steel - High Strength Bolting—special
10/10/2025Structural Stability – Alterations of existing buildingsNABIL ISHACspecial
10/10/2025Fire-Resistant Penetrations and JointsNABIL ISHACspecial
10/10/2025Structural Cold-Formed Steel—special
10/09/2025Tenant Protection Plan ComplianceNABIL ISHACspecial
10/09/2025Fire-Resistant Penetrations and JointsNABIL ISHACspecial
10/07/2025Standpipe Systems—special
10/07/2025Sprinkler Systems—special
09/19/2025Heating SystemsNABIL ISHACspecial
09/19/2025FinalNABIL ISHACprogress
09/19/2025Mechanical SystemsNABIL ISHACspecial
09/19/2025Structural Stability – Alterations of existing buildingsNABIL ISHACspecial
09/19/2025Fire-Resistant Penetrations and JointsNABIL ISHACspecial
09/16/2025Standpipe Systems—special
09/11/2025Sprinkler Systems—special
08/21/2025Insulation placement and R valuesNABIL ISHACenergy_progress
08/21/2025Exterior Insulation and Finish Systems (EIFS)NABIL ISHACspecial
Latest 25 of 78.
▾Documents — 244 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/24/2026Q00898701-P1Request digital key ↗
08/24/2026Q00898701-P2Request digital key ↗
08/24/2026Q00898701-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION21
05/19/2020421394388Open ↗
05/13/2020421394397Open ↗
05/13/2020421394388Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION15
06/05/2015440224366Open ↗
06/05/2015440224366Open ↗
06/05/2015440224366Open ↗
Showing 3 of 15 on file for this type
▸BISPLACE OF ASSEMBLY3
03/10/2017421322492Open ↗
10/19/2016421322492Open ↗
10/19/2016421322492Open ↗
▸DOB NOWDEP Stormwater Construction Permit2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/08/2013420637403Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
05/17/2017421322492Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00889910-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/24/2026Q00921589-I1Open ↗
08/24/2026Q00921589-P1Open ↗
08/23/2026Q00921604-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
12/14/2016421394388Open ↗
11/03/2016421394388Open ↗
11/03/2016421394397Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00983771-P1Open ↗
09/01/2026Q00983771-P1Open ↗
09/01/2026Q00983771-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
07/21/2015420918074Open ↗
06/05/2015420918074Open ↗
12/02/2013420918074Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/05/2015440224366Open ↗
12/02/2013420918074Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/25/2012420637403Open ↗
03/23/2010420163904Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/05/2015440224366Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/05/2015440224366Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/30/2026Q00921604-I1Open ↗
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING6
06/05/2015440224366Open ↗
12/02/2013420918074Open ↗
10/25/2012420637403Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
05/19/2015420918074Open ↗
05/09/2015420918074Open ↗
01/29/2013420637403Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
07/21/2015420918074Open ↗
07/21/2015420918074Open ↗
05/08/2013420637403Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/03/2016421394388Open ↗
04/23/2015420918074Open ↗
03/27/2015420918074Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
11/03/2016421394397Open ↗
06/05/2015440224366Open ↗
▸BISEQUIPMENT USE PERMITS2
05/08/2013420637403Open ↗
05/08/2013420637403Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
11/10/2010420284757Open ↗
01/06/2010420125448Open ↗
▸DOB NOWStreet Tree Checklist2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸BISST-1 Street Tree Checklist1
04/04/2013420125448Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/03/2016421394388Open ↗
11/03/2016421394397Open ↗
06/05/2015440224366Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
11/10/2010420284757Open ↗
03/23/2010420163904Open ↗
01/06/2010420125448Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q01005278-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
12/14/2016421394388Open ↗
10/19/2016421322492Open ↗
10/19/2016421322492Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/08/2015420918074Open ↗
05/08/2013420637403Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/05/2015440224366Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/04/2013420125448Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/05/2015440224366Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/05/2015440224366Open ↗
▸Approvals, Objections & Sign-offs29
▸BISLETTERS - SUPPORTING DOCUMENTATION9
05/13/2020421394397Open ↗
05/13/2020421394397Open ↗
05/13/2020421394388Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
11/03/2016421394388Open ↗
11/03/2016421394397Open ↗
11/06/2015421225882Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
11/15/2012420637403Open ↗
11/17/2011420125448Open ↗
11/17/2011420125448Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/21/2015420918074Open ↗
05/08/2013420637403Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
05/15/2013420843494Open ↗
11/26/2012420778974Open ↗
▸DOB NOWHold harmless letter2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸DOB NOWOTCR Final Acceptance Letter2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
11/03/2016421394388Open ↗
11/03/2016421394397Open ↗
06/08/2015420918074Open ↗
Showing 3 of 15 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
12/01/2015421225882Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET10
11/03/2016421394388Open ↗
11/03/2016421394397Open ↗
11/06/2015421225882Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION4
06/05/2020421394388Open ↗
05/09/2016421322492Open ↗
07/17/2015420918074Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
05/13/2020421394397Open ↗
05/13/2020421394388Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/05/2015440224366Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/23/2026Q01005278-I1Open ↗
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026Q00889910-I1Open ↗
08/13/2026Q00889910-P1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01005278-I1Open ↗