← Back
Two stories - detached, small or mid-size
84-12 262 STREET
QUEENS · Glen Oaks-Floral Park-New Hyde Park · BIN 4179931
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2AZoning
2,887 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,544 sf lot · 0.44 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/06/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
07/14/2026
Permit issued — Solar
Q01425693-I1-SL
07/06/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01425693-I1
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/06/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/02/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/14/2026
BISPLISSUEDCATMAN PLUMBING INC08/04/2003
BIS—ISSUEDLAL CONSTRUCTION CO.10/01/2002
BISEQISSUEDLAL CONSTRUCTION CO.10/01/2002
BISEQISSUEDLAL CONSTRUCTION CO.08/27/2002
BIS—ISSUEDLAL CONSTRUCTION CO.08/27/2002
1 project · most recent 07/06/2026
FiledStatusContractorScope
07/06/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 07/06/2026
FiledStatusContractorScope
07/06/2026Signed-offSUNRUN INSTALLATION SVC11 panels, 4.95 kw, 231.25 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/06/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/06/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/02/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/02/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/02/2026FinalWalid Abdullaprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01425693-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01425693-I1Open ↗
08/23/2026Q01425693-I1Open ↗
08/23/2026Q01425693-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01425693-I1Open ↗
08/23/2026Q01425693-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01425693-I1Open ↗