DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/07/1994V-DOB VIOLATION - ACTIVE
DOB06/28/1993V-DOB VIOLATION - ACTIVE
ECB11/12/2024WORK WITHOUT A PERMIT. OBSERVED A STRUCTURE AT ROOF LEVEL EXP#1 BOLTED INTO FACADE. STRUCTURE IS APPROXIMATELY 20' LONG BY APPROXIMATELY 4' HIGH ABOVE ENTRANCE. NO PERMITS WERE FILED FOR THIS SCOPE OF WORK. ASNothing owed — awaiting certificate of correction
ECB03/14/2003WORK W/O A PERMIT - WORK NOTED : APPROXIMATELY 4'W X 8'L CANOPY WITH 4 IRON POST WITH 8 FL HIGH WITH LETTER DELGADO HAD BEEN INSTALLED AT FRONT OF THE PREMIESS AT TIME OF INPSECTION REMEDY : OBTAIN A PERMIT IFNothing owed — awaiting certificate of correction