← Back
Two stories - detached, small or mid-size
84-25 115 STREET
QUEENS · BIN 4192389
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R2Zoning
1,900 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two stories - detached, small or mid-size · 4,629 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 6 docs
Floor 21p · 1 filing · 6 docs
Floor 11p · 1 filing · 6 docs
Cellar1p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/09/2026$860K—Private party → GENEEVE NEW YORK INC.$453/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VIBRANCY CONSULTING CORPORATION207/02/2026
Building Lifecycle
All (19)Filed (2)Violation (1)Objection (13)Special Inspection (3)
09/07/2026
Objection resolved — Resolved
09/07/2026
Objection resolved — Resolved
09/07/2026
Objection resolved — Resolved
09/07/2026
Objection resolved — Resolved
09/07/2026
Objection resolved — Resolved
09/07/2026
Objection resolved — Resolved
08/25/2026
Objection raised — Scope
08/25/2026
Objection raised — Zoning
08/25/2026
Objection raised — Zoning
08/25/2026
Objection raised — Zoning
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Zoning
08/25/2026
Objection raised — Other
07/02/2026
Filed — Alteration
ADDING TWO POWDER ROOMS ON FIRST FLOOR AND CELLAR, ADDING SINK, TOILET, DRYER, GAS WASHER, GAS HOT WATER HEATER, GAS BOILER AND PLUMBING FIXTURES. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q01424907-I1
07/02/2026
Filed — Alteration
ADDING TWO POWDER ROOMS ON FIRST FLOOR AND CELLAR, ADDING SINK, TOILET, DRYER, GAS WASHER, GAS HOT WATER HEATER, GAS BOILER AND PLUMBING FIXTURES. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q01424907-S1
07/01/2026
Special inspection requirement — Masonry
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/30/2026
Special inspection requirement — Chimneys and vents
06/12/2026
Violation issued (ECB, open)
Unknown
Nothing on file for this building.
1 project · most recent 07/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/02/2026——Gas, Water/Sanitary
1 project · most recent 06/16/2026
General Wiring
FiledStatusContractorScope
06/16/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/01/2026Masonry—special
07/01/2026Structural Stability – Alterations of existing buildings—special
06/30/2026Chimneys and vents—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01424907-I1Request digital key ↗
08/16/2026Q01424907-S1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01424907-I1Open ↗
08/16/2026Q01424907-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01424907-I1Open ↗
08/16/2026Q01424907-S1Open ↗