← Back
Public elementary, junior or senior high
P.S. 254 - the Rosa Parks School
84-40 101 STREET · BIN 4191296
💬 Discuss this project
2002Year Built
4Stories
W1Building Class
R6AZoning
106,195 sfGross Floor Area
3Units
LL97 Covered10 Open Violations 0 unresolved · 10 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC SCHOOL CONSTRUCTION AUTHORITY · 57,147 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1207/08/2026
DEPARTMENT OF EDUCATION203/22/2026
DEPT. OF EDUCATION 0103/22/2026
DOE PS 254603/22/2026
DOE PS 254 040403/22/2026
DOE PS 254 THE ROSA PARKS103/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
PS 254 DOE 0203/22/2026
HVAC PORTABLE SYSTEMS INC103/22/2026
L AND L ASSOC,403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREENMAN-PEDERSEN, INC.508/12/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENUINE PLBG & HTG LLCPlumbing307/08/2026
FOURTH AVENUE MERCHANTS IGeneral Contractor207/08/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
JEAN R. ABELLARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400508/12/2024
Building Lifecycle
All (85)Filed (5)Permit Issued (5)Signed Off (2)Violation (60)Inspection (1)Objection (2)Special Inspection (10)
02/25/2026
Violation issued (ECB, open)
Construction
02/25/2026
Violation issued (ECB, open)
Construction
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
03/21/2025
Violation issued (ECB, open)
Construction
03/21/2025
Violation issued (ECB, open)
Construction
03/21/2025
Violation issued (ECB, closed)
Construction
02/04/2025
Signed off — Alteration
Replace breeching for Hot Water Heater, install new draft inducer fan, interlock combustion air damper to new water heater. Interlock new water heater with existing CO/Gas leak detection system.
Q00580483-I1
02/04/2025
Signed off — Alteration
Replace breeching for Hot Water Heater, install new draft inducer fan, interlock combustion air damper to new water heater. Interlock new water heater with existing CO/Gas leak detection system.
Q00580483-S1
08/16/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
08/16/2024
Special inspection requirement — Maintenance information
NELSON LOPEZ
08/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
08/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
08/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
08/12/2024
Filed — Alteration
Replace breeching for Hot Water Heater, install new draft inducer fan, interlock combustion air damper to new water heater. Interlock new water heater with existing CO/Gas leak detection system.
Q00580483-P3
07/22/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
07/22/2024
Special inspection requirement — Maintenance information
NELSON LOPEZ
07/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
07/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
04/09/2024
Violation issued (ECB, open)
Construction
04/09/2024
Violation issued (ECB, open)
Construction
04/09/2024
Violation issued (ECB, open)
Construction
03/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/06/2024
Permit issued — Plumbing
Q00580483-I1-PL
08/16/2023
Filed — Alteration
Replace breeching for Hot Water Heater, install new draft inducer fan, interlock combustion air damper to new water heater. Interlock new water heater with existing CO/Gas leak detection system.
Q00580483-P1
08/16/2023
Filed — Alteration
Replace breeching for Hot Water Heater, install new draft inducer fan, interlock combustion air damper to new water heater. Interlock new water heater with existing CO/Gas leak detection system.
Q00580483-P2
03/30/2023
Permit issued — Mechanical Systems
Q00580483-S1-MS
03/28/2023
Permit issued — Plumbing
Q00580483-I1-PL
03/14/2023
Violation issued (ECB, open)
Construction
06/15/2022
Violation issued (ECB, closed)
Construction
06/15/2022
Violation issued (ECB, closed)
Construction
06/15/2022
Violation issued (ECB, closed)
Construction
03/29/2022
Permit issued — Plumbing
Q00580483-I1-PL
02/28/2022
Permit issued — Mechanical Systems
Q00580483-S1-MS
01/12/2022
Violation issued (ECB, open)
Boilers
09/08/2021
Filed — Alteration
Replace breeching for Hot Water Heater, install new draft inducer fan, interlock combustion air damper to new water heater. Interlock new water heater with existing CO/Gas leak detection system.
Q00580483-S1
08/25/2021
Objection raised — Other
08/25/2021
Objection resolved — Addressed
08/23/2021
Filed — Alteration
Replace breeching for Hot Water Heater, install new draft inducer fan, interlock combustion air damper to new water heater. Interlock new water heater with existing CO/Gas leak detection system.
Q00580483-I1
02/16/2021
Violation issued (ECB, open)
Construction
09/16/2020
Violation issued (ECB, closed)
Elevators
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/28/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/23/2017
Violation issued (ECB, closed)
Construction
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC03/06/2024
DOB NOWMechanical SystemsSigned-offFOURTH AVENUE MERCHANTS I03/30/2023
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC03/28/2023
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC03/29/2022
DOB NOWMechanical SystemsSigned-offFOURTH AVENUE MERCHANTS I02/28/2022
BISMHISSUEDKW TECH CORP01/23/2025
BISMHISSUEDKW TECH CORP01/24/2024
BISOTISSUEDNEHAL CONTRACTING INC08/02/2023
BISOTISSUEDNEHAL CONTRACTING INC08/02/2023
BISMHISSUEDKW TECH CORP02/01/2023
BISFSISSUEDCHAMPION COMBUSTION CORP06/08/2022
BISOTISSUEDNEHAL CONTRACTING INC05/25/2022
BISOTISSUEDNEHAL CONTRACTING INC05/25/2022
BISMHISSUEDKW TECH CORP02/03/2022
BISFSISSUEDCHAMPION COMBUSTION CORP11/26/2021
BISOTISSUEDNEHAL CONTRACTING INC09/24/2021
BISMHISSUEDKW TECH CORP09/24/2021
BISOTISSUEDNEHAL CONTRACTING INC09/24/2021
BISOTISSUEDNEHAL CONTRACTING INC08/15/2019
BISEQISSUEDNEHAL CONTRACTING INC08/15/2019
BISOTISSUEDNEHAL CONTRACTING INC08/28/2018
BISOTISSUEDNEHAL CONTRACTING INC08/28/2018
BISEQISSUEDPJP INSTALLERS INC08/22/2018
BISEQISSUEDPJP INSTALLERS INC08/22/2018
BISMHISSUEDKW TECH CORP08/15/2018
BISEQISSUEDNEHAL CONTRACTING INC08/14/2018
BISFSISSUEDCHAMPION COMBUSTION CORP06/11/2018
BISOTISSUEDNEHAL CONTRACTING INC09/21/2017
BISMHISSUEDKW TECH CORP09/21/2017
BISOTISSUEDNEHAL CONTRACTING INC09/21/2017
BISEQISSUEDNEHAL CONTRACTING INC08/17/2017
BISEQISSUEDNEHAL CONTRACTING INC08/01/2017
BISEQISSUEDPJP INSTALLERS INC07/31/2017
BISEQISSUEDPJP INSTALLERS INC07/31/2017
BIS—ISSUEDCITNALTA CONSTRUCTION05/19/2010
BISPLISSUEDFORSYTHE P&H CORP05/14/2009
BISPLISSUEDFORSYTHE P&H CORP05/14/2009
BIS—ISSUEDCITNALTA CONSTRUCTION04/02/2009
BIS—ISSUEDCITNALTA CONSTRUCTION CORP02/21/2007
BISPLISSUEDFORSYTHE P&H CORP01/30/2007
+ 15 more permits on file
9 projects · most recent 08/22/2025
General Wiring
FiledStatusContractorScope
08/22/2025CompleteCHARAN ELEC'L ENTERP'S IN—
07/08/2025CompleteJ.H.I. ELECTRIC LLCGeneral Wiring
06/30/2024CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
04/03/2023Permit IssuedLIU ELECTRIC, LLCGeneral Wiring
09/13/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
09/22/2020CompleteCHARAN ELEC'L ENTERP'S IN—
12/02/2019CompleteCHARAN ELEC'L ENTERP'S IN—
08/22/2018CompleteSTANCO SYSTEM ELEC'L CONT—
05/10/2018CompletePRINCE ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/16/2024Post-installed AnchorsNELSON LOPEZspecial
08/16/2024Maintenance informationNELSON LOPEZenergy_progress
08/16/2024HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
08/16/2024HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
08/16/2024HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
07/22/2024Post-installed AnchorsNELSON LOPEZspecial
07/22/2024HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
07/22/2024Maintenance informationNELSON LOPEZenergy_progress
07/22/2024HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
07/22/2024HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00580483-P3Request digital key ↗
08/27/2026Q00580483-P2Request digital key ↗
08/27/2026Q00580483-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION2
06/21/2022402899690Open ↗
01/11/2022402899690Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00580483-P1Open ↗
08/27/2026Q00580483-P3Open ↗
08/27/2026Q00580483-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026Q00580483-P3Open ↗
09/01/2026Q00580483-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00580483-P3Open ↗
09/01/2026Q00580483-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00580483-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026Q00580483-P3Open ↗
08/13/2026Q00580483-I1Open ↗
08/13/2026Q00580483-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/13/2026Q00580483-P2Open ↗
08/13/2026Q00580483-P3Open ↗
08/13/2026Q00580483-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026Q00580483-I1Open ↗
08/13/2026Q00580483-S1Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM2
06/21/2022402899690Open ↗
01/11/2022402899690Open ↗
▸Other Documents7
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal5
08/13/2026Q00580483-P1Open ↗
08/13/2026Q00580483-I1Open ↗
08/13/2026Q00580483-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026Q00580483-I1Open ↗
08/13/2026Q00580483-S1Open ↗