ECB10/20/2008WORK W/O A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED WATER + WASTELINE FOR 3PC BATHROOM (SHOWER,TOILET,SINK). REMEDY: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Two family frame · 0.87 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.