Condo, residential unit in 2-10 unit building
84 6TH AVENUE
BROOKLYN · BIN 3018734
💬 Discuss this project
1925Year Built
3Stories
R1Building Class
R6BZoning
4,510 sfGross Floor Area
4Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: 84 6TH LLC · 2,108 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 313p · 2 filings · 20 docs
Floor 213p · 2 filings · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar19p · 2 filings · 20 docs
Basement13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INFOCUS DESIGN AND PLANNING PC2108/04/2023
ASR ENGINEERING PC108/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XH&RC PLUMBING AND HEATING INC3003/21/2026
J WITKIN CONSULTING803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIREHD, INCGeneral Contractor3007/08/2026
MOSSO CONSTRUCTION INCGeneral Contractor407/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
ZONE PLUMBING & HEATING CPlumbing307/08/2026
WU CHENElectrical203/21/2026
VILLAGE P & H NY INCFire Protection107/08/2026
TREVOR DUNWELLElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INFOCUS DESIGN & PLANNING9321508/04/2023
MARKANICS CORP4600308/13/2021
Building Lifecycle
All (171)Filed (21)Permit Issued (18)Signed Off (5)Violation (18)Inspection (9)Objection (70)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
08/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/03/2024
Violation issued (HPD, open)
A
03/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2023
Violation issued (HPD, open)
I
09/07/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00797730-I1
08/17/2023
Special inspection requirement — Energy Code Compliance Inspections
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Interior lighting power
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Maintenance information
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Fenestration air leakage
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Exterior lighting power
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Fenestration areas
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Insulation placement and R values
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Preliminary
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Lighting in dwelling units
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Air barrier - visual inspection
WU(WOODY) CHEN
08/17/2023
Special inspection requirement — Lighting controls
WU(WOODY) CHEN
08/14/2023
Objection resolved — Addressed
08/09/2023
Objection raised — Scope
08/04/2023
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-A4
07/10/2023
Signed off — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-S4
07/06/2023
Permit issued — Mechanical Systems
B00542891-S4-MS
06/13/2023
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-A3
06/13/2023
Special inspection requirement — Insulation placement and R values
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Exterior lighting power
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Fenestration air leakage
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Maintenance information
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Preliminary
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Interior lighting power
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Energy Code Compliance Inspections
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Air barrier - visual inspection
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Lighting in dwelling units
WU(WOODY) CHEN
06/13/2023
Special inspection requirement — Fenestration areas
WU(WOODY) CHEN
06/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2023
Signed off — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-S3
06/02/2023
Objection resolved — Addressed
06/01/2023
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-A2
06/01/2023
Permit issued — General Construction
B00542891-I1-GC
05/19/2023
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-A1
05/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/20/2023
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-P9
04/17/2023
Objection raised — Scope
04/14/2023
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-P8
04/14/2023
Signed off — Alteration CO
INTERIOR RENOVATION OF EXISTING 4-FAMILY, (3-STORY WITH BASEMENT AND CELLAR); TO 4-FAMILY (3-STORY WITH BASEMENT AND CELLAR).
B00542891-S1
04/13/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/11/2023
Objection resolved — Addressed
04/10/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEMPIREHD, INC07/06/2023
DOB NOWGeneral ConstructionPermit IssuedEMPIREHD, INC06/01/2023
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC03/29/2023
DOB NOWSprinklersSigned-offZONE PLUMBING & HEATING C03/02/2023
DOB NOWStructuralSigned-offEMPIREHD, INC12/07/2022
DOB NOWConstruction FenceSigned-offEMPIREHD, INC12/07/2022
DOB NOWGeneral ConstructionPermit IssuedEMPIREHD, INC12/07/2022
DOB NOWStructuralSigned-offEMPIREHD, INC10/18/2022
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING08/25/2022
DOB NOWMechanical SystemsSigned-offEMPIREHD, INC06/09/2022
DOB NOWStructuralSigned-offEMPIREHD, INC05/31/2022
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C03/01/2022
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C02/18/2022
DOB NOWStructuralSigned-offEMPIREHD, INC02/10/2022
DOB NOWGeneral ConstructionPermit IssuedEMPIREHD, INC12/10/2021
DOB NOWConstruction FenceSigned-offEMPIREHD, INC12/07/2021
DOB NOWGeneral ConstructionPermit IssuedMOSSO CONSTRUCTION INC08/02/2021
DOB NOWGeneral ConstructionPermit IssuedMOSSO CONSTRUCTION INC07/01/2021
1 project · most recent 08/04/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2023Signed-offEMPIREHD, INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ4C36NAHZ 36,000 BTU · Heat Pump Outdoor ×8
Heating
Mitsubishi Electric MXZ4C36NAHZ 36,000 BTU · Heat Pump Outdoor ×8
1 project · most recent 08/04/2023
Sprinkler System
FiledStatusContractorScope
08/04/2023Signed-offPARAMOUNT SERVICES, LLCSprinkler System
1 project · most recent 08/04/2023
Storm Water/Sanitary
FiledStatusContractorScope
08/04/2023Signed-offZONE PLUMBING & HEATING CStorm, Water/Sanitary
2 projects · most recent 08/10/2023
General Wiring
FiledStatusContractorScope
08/10/2023CompleteAPPROVED ELECTRIC CORP.General Wiring
03/16/2022CompleteGREEN POWER ELECTRIC CORPGeneral Wiring
1 project · most recent 08/04/2023
Steel Concrete Wood
FiledStatusContractorScope
08/04/2023Signed-offEMPIREHD, INCSteel, Concrete, Wood
1 project · most recent 10/12/2021
Fence
FiledStatusContractorScope
10/12/2021Signed-offEMPIREHD, INCFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2023Fail-Final CND-Occupancy InspectionFailView ↗
04/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
08/17/2023Lighting controlsWU(WOODY) CHENenergy_progress
08/17/2023Exterior lighting powerWU(WOODY) CHENenergy_progress
08/17/2023Interior lighting powerWU(WOODY) CHENenergy_progress
08/17/2023Structural Stability – Alterations of existing buildingsWU(WOODY) CHENspecial
08/17/2023Fire-Resistant Penetrations and JointsWU(WOODY) CHENspecial
08/17/2023Energy Code Compliance InspectionsWU(WOODY) CHENprogress
08/17/2023PreliminaryWU(WOODY) CHENprogress
08/17/2023Fire-Resistance Rated ConstructionWU(WOODY) CHENprogress
08/17/2023Fenestration areasWU(WOODY) CHENenergy_progress
08/17/2023Lighting in dwelling unitsWU(WOODY) CHENenergy_progress
08/17/2023Fenestration air leakageWU(WOODY) CHENenergy_progress
08/17/2023Insulation placement and R valuesWU(WOODY) CHENenergy_progress
08/17/2023Maintenance informationWU(WOODY) CHENenergy_progress
08/17/2023Fenestration and door U-factor and product ratingsWU(WOODY) CHENenergy_progress
08/17/2023HVAC-R and service water piping design and insulationWU(WOODY) CHENenergy_progress
08/17/2023Air barrier - visual inspectionWU(WOODY) CHENenergy_progress
06/13/2023Fenestration air leakageWU(WOODY) CHENenergy_progress
06/13/2023HVAC-R and service water piping design and insulationWU(WOODY) CHENenergy_progress
06/13/2023Lighting controlsWU(WOODY) CHENenergy_progress
06/13/2023Fenestration areasWU(WOODY) CHENenergy_progress
06/13/2023Maintenance informationWU(WOODY) CHENenergy_progress
06/13/2023Exterior lighting powerWU(WOODY) CHENenergy_progress
06/13/2023Insulation placement and R valuesWU(WOODY) CHENenergy_progress
06/13/2023Fire-Resistant Penetrations and JointsWU(WOODY) CHENspecial
06/13/2023Structural Stability – Alterations of existing buildingsWU(WOODY) CHENspecial
Latest 25 of 123.
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/01/2026B00488610-P1Request digital key ↗
09/01/2026B00488610-S2Request digital key ↗
09/01/2026B00488610-P2Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits22
▸DOB NOWLPC Approval/Permit19
08/13/2026B00488610-P1Open ↗
08/13/2026B00488610-P2Open ↗
08/13/2026B00542891-P9Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/23/2023340822756Open ↗
12/30/2021340822756Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/30/2021340822756Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00542891-A4Open ↗
08/13/2026B00542891-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/14/2022322094648Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/10/2023322094648Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/10/2023322094648Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00542891-I1Open ↗
▸Seals & Professional Certifications111
▸DOB NOWProgress Inspector Seal & Signature69
09/19/2026B00542891-I1Open ↗
09/19/2026B00542891-I1Open ↗
09/19/2026B00542891-I1Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/13/2026B00542891-S1Open ↗
08/13/2026B00542891-A2Open ↗
08/13/2026B00542891-A3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/19/2026B00542891-I1Open ↗
09/19/2026B00542891-I1Open ↗
08/31/2026B00542891-P9Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/30/2021340822756Open ↗
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist8
08/13/2026B00488610-P1Open ↗
08/13/2026B00542891-A2Open ↗
08/13/2026B00542891-A3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00542891-I1Open ↗
08/13/2026B00488610-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/30/2021340822756Open ↗
▸BISSTREET TREE CHECKLIST1
12/30/2021340822756Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00542891-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00542891-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
08/13/2026B00542891-P3Open ↗
08/13/2026B00488610-I1Open ↗
08/13/2026B00488610-S2Open ↗
Showing 3 of 20 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00542891-S3Open ↗
08/13/2026B00542891-I1Open ↗
08/13/2026B00542891-S4Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLANDMARKS APPROVAL2
11/14/2022322094648Open ↗
12/30/2021340822756Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION1
01/21/2022340822756Open ↗
▸BISBOROUGH INTAKE FORM1
11/02/2022322094648Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/30/2021340822756Open ↗
▸BISEFILING COVER SHEET1
11/02/2022322094648Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/30/2021340822756Open ↗
▸Other Documents4
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/14/2022322094648Open ↗
11/14/2022322094648Open ↗
▸BISPLOT DIAGRAM1
11/14/2022322094648Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00542891-I1Open ↗