← Back
Elevator cooperative
84-70 129 STREET
QUEENS · Kew Gardens · BIN 4193248
💬 Discuss this project
1969Year Built
6Stories
D4Building Class
R4-1Zoning
107,250 sfGross Floor Area
131Units
LL97 CoveredRent Stabilized196 Open Violations 193 unresolved · 3 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 84-70 129TH STREET OWNERS CORP · 32,500 sf lot · 3.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Roof6p · 5 filings · 20 docs
Floor 11 filing · 2 docs
Cellar1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BILLY ENTERPRISES2907/08/2026
84-70 129TH ST OWNERS CORP2303/22/2026
T-MOBILE603/22/2026
84-70 129ST OWNERS CORP203/22/2026
KATZ REALTY403/22/2026
FIRST MANAGEMENT603/22/2026
JERRY PAPPAFLORATOS C/O 8103/22/2026
NORWAY ASSOC103/22/2026
FOCUS REAL ESTATE203/22/2026
THE JESSICA ASSOCIATION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.503/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
GC1 EXPEDITING403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
KD DESIGNS103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BILLY ENTERPRISES INCGeneral Contractor3207/08/2026
JACOBS TELECOMMUN. INCGeneral Contractor303/21/2026
KT&G CONSTRUCTION INCGeneral Contractor204/09/2026
TRISTRUX LLCGeneral Contractor203/21/2026
HYDRO MECHANICAL INCPlumbing207/08/2026
MURPHY, MICHAELElectrical103/21/2026
THOMPSON MICHAELElectrical103/21/2026
ANTHONY COSTANZOElectrical103/21/2026
LEVEST ELECTRIC CORPGeneral Contractor107/08/2026
RAMAPO COMMUNICATION CORPGeneral Contractor107/08/2026
VIALVA, JOSEPHElectrical103/21/2026
BECKER, CHARLESElectrical103/21/2026
FILARDI, JAMESElectrical103/21/2026
MICHAEL MURPHYElectrical103/21/2026
MICHAEL THOMPSONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SCOPE ENGINEERING CONSULT7894112/17/2025
CENTERLINE ENGINEERING SE8695312/03/2024
JEREMY K MCKEON, P.E.7263112/03/2024
SCHERER DESIGN GROUP, LLC6303110/10/2018
Building Lifecycle
All (153)Filed (11)Permit Issued (22)Signed Off (7)Facade (FISP) (12)Violation (60)Inspection (1)Objection (32)Special Inspection (8)
07/09/2026
Signed off — Alteration
Installation of non-emergency gas fired generator with gas booster pump on existing equipment platform on roof. Minor platform modifications per plans. No change to occupancy, use, or egress.
Q00976723-S1
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
B
05/19/2026
Violation issued (HPD, open)
C
05/19/2026
Violation issued (HPD, open)
C
05/19/2026
Violation issued (HPD, open)
B
04/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2026
Permit issued — Plumbing
Q00976723-S1-PL
01/27/2026
Signed off — Alteration
Installation of non-emergency gas fired generator with gas booster pump on existing equipment platform on roof. Minor platform modifications per plans. No change to occupancy, use, or egress.
Q00976723-S2
01/26/2026
Signed off — Alteration
Installation of non-emergency gas fired generator with gas booster pump on existing equipment platform on roof. Minor platform modifications per plans. No change to occupancy, use, or egress.
Q00976723-I1
12/17/2025
Filed — Alteration
Q01317073-I1
12/16/2025
Violation issued (HPD, open)
B
12/16/2025
Violation issued (HPD, open)
B
09/18/2025
Violation issued (HPD, closed)
C
09/18/2025
Violation issued (HPD, open)
C
09/18/2025
Violation issued (HPD, open)
B
09/18/2025
Violation issued (HPD, open)
C
09/18/2025
Violation issued (HPD, closed)
B
09/08/2025
Violation issued (HPD, open)
B
09/08/2025
Violation issued (HPD, open)
C
09/08/2025
Violation issued (HPD, closed)
C
09/08/2025
Violation issued (HPD, open)
B
09/08/2025
Violation issued (HPD, open)
C
09/08/2025
Violation issued (HPD, open)
B
03/03/2025
Permit issued — Plumbing
Q00976723-S1-PL
03/03/2025
Permit issued — Antenna
Q00976723-S2-AN
03/03/2025
Permit issued — Mechanical Systems
Q00976723-I1-GC-CX
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection resolved — Addressed
01/09/2025
Objection raised — Mechanical
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/16/2024
Objection raised — Electrical
12/16/2024
Objection raised — Zoning
12/16/2024
Objection raised — Structural
12/16/2024
Objection raised — Fire_Protection
12/16/2024
Objection raised — Mechanical
12/16/2024
Objection raised — Electrical
12/03/2024
Filed — Alteration
Installation of non-emergency gas fired generator with gas booster pump on existing equipment platform on roof. Minor platform modifications per plans. No change to occupancy, use, or egress.
Q00976723-S1
12/03/2024
Filed — Alteration
Installation of non-emergency gas fired generator with gas booster pump on existing equipment platform on roof. Minor platform modifications per plans. No change to occupancy, use, or egress.
Q00976723-S2
12/03/2024
Filed — Alteration
Installation of non-emergency gas fired generator with gas booster pump on existing equipment platform on roof. Minor platform modifications per plans. No change to occupancy, use, or egress.
Q00976723-I1
08/05/2024
Signed off — Alteration
Carrier: T-Mobile. Modification of an existing antenna site. Replace (10) antennas, and (9) RRUs. Install (2) RRUs on the roof. All work is in conformance with TPPN #5/98. No change in use, egress, or occupancy.
Q00111260-I1
06/29/2024
Violation issued (HPD, open)
A
04/19/2024
Violation issued (HPD, closed)
C
04/19/2024
Violation issued (HPD, closed)
C
04/17/2024
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
A
04/03/2024
Violation issued (HPD, open)
B
04/03/2024
Violation issued (HPD, closed)
C
04/03/2024
Violation issued (HPD, open)
B
03/27/2024
Violation issued (HPD, open)
C
03/27/2024
Violation issued (HPD, open)
C
03/24/2024
Violation issued (HPD, open)
C
03/24/2024
Violation issued (HPD, open)
C
03/24/2024
Violation issued (HPD, closed)
C
01/06/2024
Violation issued (HPD, closed)
C
01/06/2024
Violation issued (HPD, closed)
C
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHYDRO MECHANICAL INC03/17/2026
DOB NOWPlumbingSigned-offHYDRO MECHANICAL INC03/03/2025
DOB NOWAntennaSigned-offKT&G CONSTRUCTION INC03/03/2025
DOB NOWMechanical SystemsSigned-offKT&G CONSTRUCTION INC03/03/2025
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC01/20/2021
DOB NOWSupported ScaffoldPermit IssuedBILLY ENTERPRISES INC01/19/2021
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR09/29/2020
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC10/11/2019
DOB NOWSupported ScaffoldPermit IssuedBILLY ENTERPRISES INC10/11/2019
DOB NOWAntennaSigned-offTRISTRUX LLC04/18/2019
DOB NOWSupported ScaffoldPermit IssuedBILLY ENTERPRISES INC01/11/2019
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC01/11/2019
DOB NOWAntennaSigned-offRAMAPO COMMUNICATION CORP10/23/2018
DOB NOWAntennaSigned-offLEVEST ELECTRIC CORP10/22/2018
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC09/21/2018
DOB NOWSupported ScaffoldPermit IssuedBILLY ENTERPRISES INC09/21/2018
DOB NOWSupported ScaffoldPermit IssuedBILLY ENTERPRISES INC08/14/2018
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC08/10/2018
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC03/13/2018
DOB NOWSupported ScaffoldPermit IssuedBILLY ENTERPRISES INC02/28/2018
DOB NOWSupported ScaffoldPermit IssuedBILLY ENTERPRISES INC12/08/2017
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC11/08/2017
BISOTISSUEDRMZ CONTRACTING INC09/14/2021
BISOTISSUEDANANDA GENERAL CONSTRUCT07/01/2020
BISOTISSUEDANANDA GENERAL CONSTRUCT01/31/2020
BISOTISSUEDANANDA GENERAL CONSTRUCT07/16/2018
BISOTISSUEDANANDA GENERAL CONSTRUCT12/01/2017
BISOTISSUEDVANTAGE ASSOCIATES INC06/02/2016
BISOTISSUEDBECHTEL INFRASTRUCTURE AN04/27/2015
BISOTISSUEDBECHTEL INFRASTRUCTURE AN09/09/2014
BISPLISSUEDDAVID JABLON06/24/2014
BISOTISSUEDDMB CONTRACTING CORP06/17/2014
BISOTISSUEDSKYLINE STEEL FABRICATORS &11/21/2012
BISOTISSUEDODYSSIA GLOBAL COMM. CORP05/02/2012
BISPLISSUEDNM MECHANICAL CORP09/15/2010
BISEQISSUEDMETRO CONTRACTING NY, INC.04/12/2010
1 project · most recent 12/03/2024
Generators
FiledStatusContractorScopeMake / Model / Capacity
12/03/2024Signed-offKT&G CONSTRUCTION INCGenerators
Generators
Accardi MD101-1/4 REG-48V-ODE-AT&T Pump ×1
Polar Power V020G360TE004 Generator ×1
1 project · most recent 04/10/2025
General Wiring
FiledStatusContractorScope
04/10/2025Permit IssuedCOMMERCE ELECL CONTRG CORGeneral Wiring
1 project · most recent 12/03/2024
Steel
FiledStatusContractorScope
12/03/2024Signed-offHYDRO MECHANICAL INCSteel
2 projects · most recent 12/07/2017
Scaffold Sidewalk Shed
FiledStatusContractorScope
12/07/2017Permit IssuedBILLY ENTERPRISES INCScaffold
11/07/2017Permit IssuedBILLY ENTERPRISES INCSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/13/2023Mechanical SystemsJeremy McKeonspecial
12/13/2023Structural Steel - DetailsPHILIP BURTNERspecial
12/13/2023Tenant Protection Plan CompliancePHILIP BURTNERspecial
12/13/2023Structural Steel - High Strength BoltingJeremy McKeonspecial
12/13/2023FinalPHILIP BURTNERprogress
12/13/2023Fire-Resistant Penetrations and JointsPHILIP BURTNERspecial
12/13/2023Post-installed AnchorsPHILIP BURTNERspecial
12/13/2023Tenant Protection Plan CompliancePHILIP BURTNERspecial
▾Documents — 192 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch8
08/29/2026Q00002018-I1Request digital key ↗
08/29/2026Q00003761-I1Request digital key ↗
08/28/2026Q00058101-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Antenna3
08/15/2026Q00345027-I1Request digital key ↗
08/15/2026Q00111260-I1Request digital key ↗
08/14/2026Q00111260-P1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION19
10/25/2019440425791Open ↗
10/07/2019440425791Open ↗
12/19/2018421161110Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION15
10/06/2021440425791Open ↗
09/10/2020440425791Open ↗
02/12/2020440425791Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
10/29/2018421266766Open ↗
06/06/2016421266766Open ↗
09/23/2015420969759Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026Q00058101-I1Open ↗
08/28/2026Q00111260-I1Open ↗
08/28/2026Q00111260-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00976723-I1Open ↗
09/01/2026Q00976723-I1Open ↗
09/01/2026Q00976723-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/05/2017440425791Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/09/2010420172949Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/05/2017440425791Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/05/2017440425791Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/09/2010420172949Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00976723-I1Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE3
10/30/2014420916922Open ↗
10/14/2014420916922Open ↗
10/12/2010420210079Open ↗
▸BISDETECTOR:SMOKE-CERTIFICATE OF INSTALLATION2
10/16/2010420210079Open ↗
10/16/2010420210079Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/04/2014420916922Open ↗
03/11/2014420916922Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
03/21/2015420969759Open ↗
05/28/2014420969759Open ↗
▸BISSCHEDULE B - PLUMBING1
07/02/2010420210079Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/28/2026Q00058101-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
08/13/2026Q00111260-I1Open ↗
08/13/2026Q00111260-P1Open ↗
08/13/2026Q00345027-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
10/05/2017440425791Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026Q00058101-I1Open ↗
08/21/2026Q00976723-I1Open ↗
08/21/2026Q00976723-S2Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/24/2016421266766Open ↗
04/23/2014420969759Open ↗
03/11/2014420916922Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/05/2012420537495Open ↗
07/02/2010420210079Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/09/2010420172949Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/05/2017440425791Open ↗
▸Energy Compliance15
▸BISAS-BUILT ENERGY ANALYSIS5
09/10/2021440425791Open ↗
10/29/2018421266766Open ↗
09/23/2015420969759Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/06/2016421266766Open ↗
05/19/2015421161110Open ↗
10/14/2014420916922Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/10/2021440425791Open ↗
10/05/2017440425791Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/05/2012420537495Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/05/2017440425791Open ↗
▸BISNYCECC ANALYSIS1
10/05/2017440425791Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/10/2021440425791Open ↗
09/10/2021440425791Open ↗
12/01/2017440425791Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/29/2018421266766Open ↗
▸Approvals, Objections & Sign-offs22
▸BISADMINISTRATIVE OBJECTIONS7
02/24/2016421266766Open ↗
05/19/2015421161110Open ↗
04/23/2014420969759Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/12/2018421266766Open ↗
09/23/2015420969759Open ↗
04/15/2014420916922Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/29/2018421266766Open ↗
09/23/2015420969759Open ↗
08/26/2013420537495Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
10/06/2021440425791Open ↗
05/06/2015420969759Open ↗
11/28/2012420537495Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
09/10/2021440425791Open ↗
10/05/2017440425791Open ↗
02/24/2016421266766Open ↗
Showing 3 of 14 on file for this type
▸BISSTEEL AFFIDAVIT- FINAL1
10/09/2014420916922Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/25/2014420916922Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET6
02/24/2016421266766Open ↗
05/19/2015421161110Open ↗
04/23/2014420969759Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
08/12/2014420916922Open ↗
08/04/2014420916922Open ↗
08/07/2013420537495Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
10/06/2021440425791Open ↗
10/07/2019440425791Open ↗
12/19/2018421161110Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/05/2017440425791Open ↗