← Back
BuildNYC
Elevator cooperative
Kings Oaks Terrace Coop
840 EAST 8TH STREET · BIN 3170490
💬 Discuss this project
1953Year Built
6Stories
D4Building Class
R7AZoning
180,000 sfGross Floor Area
168Units
LL97 CoveredRent Stabilized26 Active Violations 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator cooperative · Owner of record: 840 East 8th Street L · 60,250 sf lot · 2.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Unit 5F3p · 2 filings · 11 docs
Floor 4Unit 4C2p · 1 filing · 10 docs
Floor 3
Floor 2
Floor 1Unit 1L1p · 2 filings · 5 docs
Sub-BasementConcrete repairs and steel reinforcing6p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Kings Oaks Terrace Co-Operative803/21/2026
Kings Oaks Coop Apartments203/21/2026
840 East 8th Street L103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Engineering Professional Service P212/29/2025
SW Engineering Company106/13/2025
Leonid Bukhgalter, P.E209/01/2021
Aka Studio106/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Maria103/21/2026
Boyd Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EkolineGeneral Contractor603/21/2026
Eci Contracting GroupGeneral Contractor104/09/2026
Fartuna ConstructionGeneral Contractor107/08/2026
StructurelineGeneral Contractor107/08/2026
Smart Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Professional6393112/29/2025
Zarina Kindo, RA4900112/29/2025
SWL Engineering Inspectio6912106/13/2025
Leonid Bukhgalter, P.E1150209/01/2021
Aka Studio3798106/16/2021
Building Lifecycle
All (111)Filed (6)Permit Issued (6)Signed Off (4)Violation (60)Inspection (2)Objection (14)Special Inspection (19)
09/29/2026
Violation issued (ECB, open)
Elevators
05/19/2026
Signed off — Alteration
Interior alteration apartment number 4C in the existing building. No change in use, egress, bulk, and/or occupancy.
B01333256-I1
05/05/2026
Permit issued — General Construction
B01333256-I1-GC
04/12/2026
Objection resolved — Addressed
03/29/2026
Objection resolved — Addressed
03/29/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
01/16/2026
Signed off — Alteration
CONCRETE REPAIRS AND STEEL REINFORCING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
B01231545-I1
01/14/2026
Objection raised — Fire_Protection
01/14/2026
Objection raised — Cost
01/14/2026
Objection raised — Scope
01/14/2026
Objection raised — Scope
01/14/2026
Objection raised — Scope
01/14/2026
Objection raised — Scope
01/14/2026
Objection raised — Scope
12/29/2025
Filed — Alteration
Interior alteration apartment number 4C in the existing building. No change in use, egress, bulk, and/or occupancy.
B01333256-I1
12/24/2025
Special inspection requirement — Lighting controls
OLEG RUDITSER
12/12/2025
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
12/12/2025
Special inspection requirement — Final
OLEG RUDITSER
12/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
OLEG RUDITSER
12/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
OLEG RUDITSER
12/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZARINA KINDO
12/12/2025
Special inspection requirement — Demolition
OLEG RUDITSER
07/15/2025
Permit issued — Structural
B01231545-I1-ST
06/13/2025
Filed — Alteration
CONCRETE REPAIRS AND STEEL REINFORCING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
B01231545-I1
06/11/2025
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
06/11/2025
Special inspection requirement — Preliminary
05/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
05/27/2025
Special inspection requirement — Structural Steel - Details
JOSHUA LUCKRITZ
05/27/2025
Special inspection requirement — Sprayed fire-resistant materials
JOSHUA LUCKRITZ
05/27/2025
Special inspection requirement — Structural Steel - Welding
JOSHUA LUCKRITZ
05/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
05/27/2025
Special inspection requirement — Final
THOMAS ADAMS
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
A
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
A
05/11/2023
Violation issued (HPD, open)
A
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
A
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
A
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
B
05/11/2023
Violation issued (HPD, open)
B
11/01/2022
Filed — Alteration
B08024849-I1
05/05/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 5F. REMOVAL OF NON-BEARING PARTITIONS AS PER PLAN. NEW INTERIOR FINISHES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00578400-I1
03/04/2022
Violation issued (ECB, closed)
Elevators
12/10/2021
Permit issued — General Construction
B00578400-I1-GC
12/01/2021
Permit issued — General Construction
B00578400-I1-GC
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFartuna Construction05/05/2026
DOB NOWStructuralPermit IssuedEci Contracting Group07/15/2025
DOB NOWGeneral ConstructionSigned-offStructureline12/10/2021
DOB NOWGeneral ConstructionSigned-offEkoline12/01/2021
DOB NOWGeneral ConstructionSigned-offEkoline09/24/2021
DOB NOWPlumbingSigned-offSmart Plumbing & Heating08/04/2021
BISPLISSUEDGas Approved Service02/08/2018
BISOTISSUEDUnique Construction Concepts01/18/2018
BISOTISSUEDHeritage Chimney Service09/01/2017
BISOTISSUEDUnique Construction Concepts08/28/2017
BISOTISSUEDStar Industrial Service07/27/2017
BISOTISSUEDRG Intelliconstruction02/08/2017
BISOTISSUEDFinix U.S.A. Construction12/16/2016
BISOTISSUEDFinix U.S.A. Construction08/04/2016
BISOTISSUEDFinix U.S.A. Construction06/21/2016
BISOTISSUEDFinix U.S.A. Construction03/24/2016
BISOTISSUEDReal Dependabl Contracting02/19/2016
BISOTISSUEDReal Dependabl Contracting01/12/2016
BISOTISSUEDRohan's General Construction01/31/2014
BISFSISSUEDApproved Oil Co of Brooklyn06/22/2010
BISPLISSUEDMmi Plumbing & Heating05/06/2009
BISOTISSUEDBelfor European Closet01/25/1999
BISOTISSUEDEmanuel Brothers Construction07/03/1997
BISSPISSUEDNew Misty Plumbing II02/14/1991
BISOTISSUEDPhoenix Combustion11/29/1990
BISSPISSUEDNew Misty Plumbing II11/19/1990
BISOTRE-ISSUEDPhoenix Combustion11/16/1990
3 projects · most recent 01/08/2025
General Wiring
FiledStatusContractorScope
01/08/2025CompletePrincipal ElectricGeneral Wiring
03/09/2022Permit IssuedCaputek Electrical Services—
09/24/2021Permit IssuedCaputek Electrical Services—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/07/2021Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
09/01/2021Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/24/2025Lighting controlsOLEG RUDITSERenergy_progress
12/12/2025Energy Code Compliance InspectionsOLEG RUDITSERprogress
12/12/2025FinalOLEG RUDITSERprogress
12/12/2025Structural Stability – Alterations of existing buildingsOLEG RUDITSERspecial
12/12/2025Fire-Resistance Rated ConstructionOLEG RUDITSERprogress
12/12/2025Tenant Protection Plan ComplianceZARINA KINDOspecial
12/12/2025DemolitionOLEG RUDITSERspecial
06/11/2025Post-installed AnchorsJOSHUA LUCKRITZspecial
06/11/2025Preliminary—progress
05/27/2025Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
05/27/2025Structural Steel - DetailsJOSHUA LUCKRITZspecial
05/27/2025Sprayed fire-resistant materialsJOSHUA LUCKRITZspecial
05/27/2025Structural Steel - WeldingJOSHUA LUCKRITZspecial
05/27/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
05/27/2025FinalTHOMAS ADAMSprogress
08/18/2021Lighting in dwelling unitsLeonid Bukhgalterenergy_progress
08/18/2021Energy Code Compliance InspectionsLeonid Bukhgalterprogress
08/18/2021FinalLeonid Bukhgalterprogress
08/18/2021Fire-Resistant Penetrations and JointsLeonid Bukhgalterspecial
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00537239-I1Request digital key ↗
09/01/2026B00577163-I1Request digital key ↗
09/01/2026B00578400-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION14
02/08/2018321682942Open ↗
01/18/2018321682942Open ↗
08/30/2017340538804Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
05/18/2018321522624Open ↗
01/17/2018321522624Open ↗
12/18/2017321682942Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/21/2016321281787Open ↗
▸Seals & Professional Certifications57
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
04/26/2018321682942Open ↗
12/18/2017321682942Open ↗
12/13/2017340527399Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B01231545-I1Open ↗
08/28/2026B00578400-I1Open ↗
08/28/2026B00578400-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
08/30/2017340538804Open ↗
08/29/2017321522624Open ↗
07/25/2017340527399Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
08/29/2017321522624Open ↗
02/08/2017321523071Open ↗
12/20/2016321412547Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00537239-I1Open ↗
09/01/2026B00577163-I1Open ↗
09/01/2026B00578400-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01231545-I1Open ↗
08/28/2026B00578400-I1Open ↗
08/27/2026B01333256-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/30/2017340538804Open ↗
07/25/2017340527399Open ↗
01/11/2016340342999Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/30/2017340538804Open ↗
07/25/2017340527399Open ↗
01/11/2016340342999Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/22/2010320175564Open ↗
11/20/2008310228250Open ↗
▸BISProfessional and Owner Certification (POC3)1
12/20/2016321412547Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/18/2017321682942Open ↗
08/29/2017321522624Open ↗
01/27/2014320862107Open ↗
▸BISSCHEDULE B - PLUMBING3
01/11/2016340342999Open ↗
06/22/2010320175564Open ↗
11/19/2008310228250Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/07/2010320175564Open ↗
06/09/2009310228250Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/22/2010320175564Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES4
08/30/2017340538804Open ↗
07/25/2017340527399Open ↗
02/08/2017321523071Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
01/27/2014320862107Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
12/18/2017321682942Open ↗
08/30/2017340538804Open ↗
08/29/2017321522624Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00577163-I1Open ↗
09/01/2026B00578400-I1Open ↗
08/28/2026B08024849-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/22/2010320175564Open ↗
11/19/2008310228250Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
02/01/2014320862107Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
04/26/2018321682942Open ↗
12/18/2017321682942Open ↗
11/01/2017340527399Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
04/25/2018321682942Open ↗
11/01/2017340527399Open ↗
10/18/2017340538804Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/30/2017340538804Open ↗
07/25/2017340527399Open ↗
01/11/2016340342999Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/30/2017340538804Open ↗
07/25/2017340527399Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00578400-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/30/2017340538804Open ↗
07/25/2017340527399Open ↗
01/11/2016340342999Open ↗
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION1
10/07/2010320175564Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
04/25/2018321682942Open ↗
12/13/2017340527399Open ↗
11/01/2017340527399Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/01/2017340527399Open ↗
10/18/2017340538804Open ↗
03/25/2016321281787Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
02/08/2017321523071Open ↗
06/22/2010320175564Open ↗
11/19/2008310228250Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
04/26/2018321682942Open ↗
12/18/2017321682942Open ↗
11/01/2017340527399Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET8
12/18/2017321682942Open ↗
08/29/2017321522624Open ↗
02/08/2017321523071Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
05/18/2018321522624Open ↗
04/25/2018321682942Open ↗
01/17/2018321522624Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/30/2017340538804Open ↗
07/25/2017340527399Open ↗
01/11/2016340342999Open ↗
▸Other Documents1
▸BISLL-2 6/04-31
04/25/2018321682942Open ↗