← Back
Professional building / stand-alone funeral home
840 EMPIRE BOULEVARD
BROOKLYN · BIN 3348651
💬 Discuss this project
1930Year Built
1Stories
O7Building Class
C8-2Zoning
5,360 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: 840 LEFFERTS LLC · 8,840 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Floor 144p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTRAL AVENUE DEVELOPERS LLC2004/09/2026
TO THE OWNER OF 840 LEFFE103/22/2026
BLAKE CORP CHRISTOPHER103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDGE + CO.412/30/2025
MG ENGINEERING D.P.C.312/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EDGE + CO ARCHITECTURE1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKSTONE DEVELOPERS LLCGeneral Contractor304/09/2026
CREATIVE PLUMBING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SGM ENGINEERING2366712/30/2025
Building Lifecycle
All (91)Filed (7)Permit Issued (4)Signed Off (3)Violation (3)Inspection (6)Objection (38)Special Inspection (30)
07/31/2026
Signed off — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-S2
05/06/2026
Signed off — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-S3
05/05/2026
Signed off — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-S1
04/20/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/26/2026
Special inspection requirement — Post-installed Anchors
steven Giammona
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
02/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
02/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
02/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
02/13/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Cost
01/29/2026
Objection raised — Energy
01/29/2026
Objection resolved — Addressed
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
01/26/2026
Special inspection requirement — Fenestration areas
steven Giammona
01/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
steven Giammona
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
01/26/2026
Special inspection requirement — Final
steven Giammona
01/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
steven Giammona
01/26/2026
Special inspection requirement — Interior lighting power
steven Giammona
01/16/2026
Objection resolved — Addressed
01/12/2026
Objection raised — Scope
12/30/2025
Filed — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-P3
12/30/2025
Filed — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-P2
12/22/2025
Filed — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-P4
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/12/2025
Special inspection requirement — Electrical motors and elevators
steven Giammona
11/12/2025
Special inspection requirement — Maintenance information
steven Giammona
11/12/2025
Special inspection requirement — Duct leakage testing, insulation and design
steven Giammona
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
11/12/2025
Special inspection requirement — Post-installed Anchors
steven Giammona
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
11/12/2025
Special inspection requirement — Mechanical Systems
steven Giammona
11/12/2025
Special inspection requirement — Post-installed Anchors
steven Giammona
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
11/12/2025
Special inspection requirement — Final
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
09/26/2025
Permit issued — Structural
B01085781-S3-ST
08/04/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2025
Special inspection requirement — Wood – Seismic Resistance
steven Giammona
07/08/2025
Filed — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-S3
05/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/21/2025
Permit issued — Plumbing
B01085781-S2-PL
05/14/2025
Permit issued — General Construction
B01085781-I1-GC
05/06/2025
Permit issued — Mechanical Systems
B01085781-S1-MS
03/13/2025
Objection resolved — Addressed
03/13/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
08/28/2024
Objection raised — Scope
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBROOKSTONE DEVELOPERS09/26/2025
DOB NOWPlumbingSigned-offAB PLUMBING INC05/21/2025
DOB NOWGeneral ConstructionPermit IssuedBROOKSTONE DEVELOPERS05/14/2025
DOB NOWMechanical SystemsSigned-offBROOKSTONE DEVELOPERS05/06/2025
1 project · most recent 12/30/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/30/2025Signed-offMETFLOW MECHANICAL LLCGas, Water/Sanitary
1 project · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026CompleteCYM ELECTRICAL CONTRACTORGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/04/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
02/26/2026Post-installed Anchorssteven Giammonaspecial
02/26/2026Fire-Resistant Penetrations and Jointssteven Giammonaspecial
02/26/2026Energy Code Compliance Inspectionssteven Giammonaprogress
02/26/2026HVAC-R and service water heating system controlssteven Giammonaenergy_progress
02/26/2026HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
02/26/2026HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
01/26/2026Fire-Resistant Penetrations and Jointssteven Giammonaspecial
01/26/2026Fenestration areassteven Giammonaenergy_progress
01/26/2026Fire-Resistance Rated Constructionsteven Giammonaprogress
01/26/2026Energy Code Compliance Inspectionssteven Giammonaprogress
01/26/2026Finalsteven Giammonaprogress
01/26/2026Fenestration and door U-factor and product ratingssteven Giammonaenergy_progress
01/26/2026Interior lighting powersteven Giammonaenergy_progress
11/12/2025Electrical motors and elevatorssteven Giammonaenergy_progress
11/12/2025Maintenance informationsteven Giammonaenergy_progress
11/12/2025Duct leakage testing, insulation and designsteven Giammonaenergy_progress
11/12/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
11/12/2025Post-installed Anchorssteven Giammonaspecial
11/12/2025Energy Code Compliance Inspectionssteven Giammonaprogress
11/12/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
11/12/2025HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
11/12/2025HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
11/12/2025Mechanical Systemssteven Giammonaspecial
11/12/2025Post-installed Anchorssteven Giammonaspecial
11/12/2025Energy Code Compliance Inspectionssteven Giammonaprogress
Latest 25 of 35.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026B01085781-S3Request digital key ↗
08/21/2026B01085781-S2Request digital key ↗
08/21/2026B01085781-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B01085781-P2Open ↗
09/01/2026B01085781-P2Open ↗
09/01/2026B01085781-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B01085781-P2Open ↗
09/01/2026B01085781-P2Open ↗
08/26/2026B01085781-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01085781-S2Open ↗
08/21/2026B01085781-S1Open ↗
08/21/2026B01085781-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026B01085781-S2Open ↗
08/21/2026B01085781-S1Open ↗
08/21/2026B01085781-I1Open ↗
Showing 3 of 7 on file for this type