← Back
BuildNYC
Professional building / stand-alone funeral home
840 LEFFERTS AVENUE
BROOKLYN · BIN 3348651
💬 Discuss this project
1930Year Built
1Stories
O7Building Class
C8-2Zoning
5,360 sfGross Floor Area
1Units
2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: 840 Lefferts · 8,840 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHolistic Midwifery12p · 1 filing · 20 docs
Floor 1Holistic Midwifery73p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Central Avenue Developers2004/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edge + Co412/30/2025
MG Engineering312/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Edge + Co Architecture1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brookstone DevelopersGeneral Contractor304/09/2026
Creative Plumbing inPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SGM Engineering2366712/30/2025
Building Lifecycle
All (90)Filed (7)Permit Issued (4)Signed Off (3)Violation (3)Inspection (5)Objection (38)Special Inspection (30)
07/31/2026
Signed off — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-S2
05/06/2026
Signed off — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-S3
05/05/2026
Signed off — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-S1
04/20/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/26/2026
Special inspection requirement — Post-installed Anchors
steven Giammona
02/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
02/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
02/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
02/13/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Cost
01/29/2026
Objection raised — Energy
01/29/2026
Objection resolved — Addressed
01/26/2026
Special inspection requirement — Fenestration areas
steven Giammona
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
01/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
steven Giammona
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
01/26/2026
Special inspection requirement — Final
steven Giammona
01/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
steven Giammona
01/26/2026
Special inspection requirement — Interior lighting power
steven Giammona
01/16/2026
Objection resolved — Addressed
01/12/2026
Objection raised — Scope
12/30/2025
Filed — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-P2
12/30/2025
Filed — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-P3
12/22/2025
Filed — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-P4
12/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
steven Giammona
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
steven Giammona
12/16/2025
Special inspection requirement — Final
steven Giammona
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
12/16/2025
Special inspection requirement — Fenestration areas
steven Giammona
12/16/2025
Special inspection requirement — Interior lighting power
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
11/12/2025
Special inspection requirement — Post-installed Anchors
steven Giammona
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
11/12/2025
Special inspection requirement — Mechanical Systems
steven Giammona
11/12/2025
Special inspection requirement — Post-installed Anchors
steven Giammona
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
09/26/2025
Permit issued — Structural
B01085781-S3-ST
08/04/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Filed — Alteration
Removal of existing HVAC system. Installation of new HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B01085781-S3
05/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/21/2025
Permit issued — Plumbing
B01085781-S2-PL
05/14/2025
Permit issued — General Construction
B01085781-I1-GC
05/06/2025
Permit issued — Mechanical Systems
B01085781-S1-MS
03/13/2025
Objection resolved — Addressed
03/13/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
08/28/2024
Objection raised — Scope
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBrookstone Developers09/26/2025
DOB NOWPlumbingSigned-offAB Plumbing05/21/2025
DOB NOWGeneral ConstructionPermit IssuedBrookstone Developers05/14/2025
DOB NOWMechanical SystemsSigned-offBrookstone Developers05/06/2025
1 project · most recent 12/30/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/30/2025Signed-offMetflow MechanicalGas, Water/Sanitary
1 project · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026CompleteCYM Electrical ContractorGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/04/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
02/26/2026Post-installed Anchorssteven Giammonaspecial
02/26/2026HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
02/26/2026HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
02/26/2026HVAC-R and service water heating system controlssteven Giammonaenergy_progress
02/26/2026Energy Code Compliance Inspectionssteven Giammonaprogress
02/26/2026Fire-Resistant Penetrations and Jointssteven Giammonaspecial
01/26/2026Fenestration areassteven Giammonaenergy_progress
01/26/2026Fire-Resistant Penetrations and Jointssteven Giammonaspecial
01/26/2026Fire-Resistance Rated Constructionsteven Giammonaprogress
01/26/2026Energy Code Compliance Inspectionssteven Giammonaprogress
01/26/2026Finalsteven Giammonaprogress
01/26/2026Fenestration and door U-factor and product ratingssteven Giammonaenergy_progress
01/26/2026Interior lighting powersteven Giammonaenergy_progress
12/16/2025Fenestration and door U-factor and product ratingssteven Giammonaenergy_progress
12/16/2025Fire-Resistance Rated Constructionsteven Giammonaprogress
12/16/2025Finalsteven Giammonaprogress
12/16/2025Energy Code Compliance Inspectionssteven Giammonaprogress
12/16/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
12/16/2025Fenestration areassteven Giammonaenergy_progress
12/16/2025Interior lighting powersteven Giammonaenergy_progress
11/12/2025HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
11/12/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
11/12/2025Post-installed Anchorssteven Giammonaspecial
11/12/2025Energy Code Compliance Inspectionssteven Giammonaprogress
11/12/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
Latest 25 of 42.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Holistic MidwiferyMedical / HealthcareFloor 1, Roof
Project B01085781 Alteration · Permit Entire · 08/02/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026B01085781-P4Request digital key ↗
08/21/2026B01085781-P3Request digital key ↗
08/21/2026B01085781-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature20
10/02/2026B01085781-P4Open ↗
10/02/2026B01085781-P4Open ↗
10/02/2026B01085781-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/02/2026B01085781-P4Open ↗
09/01/2026B01085781-P2Open ↗
09/01/2026B01085781-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01085781-S2Open ↗
08/21/2026B01085781-S1Open ↗
08/21/2026B01085781-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026B01085781-S1Open ↗
08/21/2026B01085781-S2Open ↗
08/21/2026B01085781-I1Open ↗
Showing 3 of 7 on file for this type