← Back
BROOKLYN
8410 3 AVENUE
BROOKLYN · BIN 3152720
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RMAN HOLDINGS407/08/2026
8410 3RD AVE403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC107/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TSOLAKI'S EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G&A CONTRACTING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAPER PLANE ARCHITECTURE,7155107/02/2024
Building Lifecycle
All (6)Filed (1)Permit Issued (1)Special Inspection (4)
07/22/2024
Permit issued — General Construction
B01075055-I1-GC
07/02/2024
Filed — Alteration
PROPOSED INTERIOR FIT OUT RENOVATIONS TO EXISTING STORETO INCLUDE INSTALLATION OF NON LOAD BEARING WALLS,INTERIOR FINISHES, AND BATHROOM RENOVATION.
B01075055-I1
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Janiel Collaqi
07/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
Janiel Collaqi
07/01/2024
Special inspection requirement — Final
Janiel Collaqi
07/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
Janiel Collaqi
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offG&A CONTRACTING LLC07/22/2024
BISEQISSUEDEVEREST SCAFFOLDING INC07/27/2007
BISEQISSUEDEVEREST SCAFFOLDING INC07/26/2007
BISMHISSUEDJR FREEZE CORP09/20/2002
BISMHISSUEDJR FREEZE CORP06/18/1999
1 project · most recent 07/02/2024
General Wiring
FiledStatusContractorScope
07/02/2024Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/01/2024Fire-Resistant Penetrations and JointsJaniel Collaqispecial
07/01/2024Tenant Protection Plan ComplianceJaniel Collaqispecial
07/01/2024FinalJaniel Collaqiprogress
07/01/2024Fire-Resistance Rated ConstructionJaniel Collaqiprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026B01075055-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01075055-I1Open ↗
08/25/2026B01075055-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01075055-I1Open ↗
08/25/2026B01075055-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01075055-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01075055-I1Open ↗