HPD04/30/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD11/18/2025§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
DOB05/16/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/21/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/21/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/21/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/21/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB01/25/2018UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.@TIME OF INSP @THE ABOVE ADDRESS ON THE ABOVE DATE.I OBSERVED IN CELLAR NEWLYINSTALLED BOILER & NEW GAS LINE RAN FROM GAS METER TO BOILER UP TO 3RDNothing owed — awaiting certificate of correction
ECB12/29/2017FILED A CERTIFICATE,FORM,APPLICATION ETC, CONTAINING A MATERIAL FALSE STATEEMENT. AT TIME OF INSPECTION AT THE ABOVE ADDRESS ON THE ABOVE DATE RESPONDENT FAILED TO COMPLY WITH LAA OPEN ISSUES UNDER JOB #Nothing owed — awaiting certificate of correction
ECB11/28/2017WORK WITHOUT PERMIT.AT THE TIME OF INSPECTION AT THE ABOVE ADDRESS ON THE ABOVE DATE.I OBSERVED A NEWLY BOILER(WILLIAM GWA-70)INSTALLED WITHGAS PIPING WITHOUT ANY PERMIT.REM:OBTAIN PERMIT OR RESTORE PREMISE TONothing owed — awaiting certificate of correction
ECB11/28/2017FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED AT THE TIME OF INSPECTION AT THE ABOVE ADDRESS ON THE ABOVE DATE I OBSERVED A NEW BOILER AND GAS LINE INSTALLED IN CELLAR FOR APT 3 WITHOUT PERFORMING ANY TNothing owed — awaiting certificate of correction
ECB10/18/2017GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTION AND CERTIFICATION BYDOB.AT THE TIME OF INSPECTION AT THE ABOVE ADDRESS ON THE ABOVE DATE IOBSERVED IN CELLAR NEW GAS PIPING SUPPLYING A NEWLY INSTALLED BOILER FNothing owed — awaiting certificate of correction