← Back
Two family brick
844 56 STREET
BROOKLYN · BIN 3139861
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
2,160 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: HUA HONG CHENG, LLC · 2,275 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction59p · 1 filing · 20 docs
Floor 4Under Construction50p · 1 filing · 20 docs
Floor 3Under Construction52p · 1 filing · 20 docs
Floor 2Under Construction53p · 1 filing · 20 docs
Floor 1Under Construction54p · 1 filing · 20 docs
CellarUnder Construction51p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFE-SHIELD ENTERPRISES407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2022$1.7M—Private party → HUA HONG CHENG, LLC$792/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX FLAME SOLUTION INC706/29/2026
NYX ENGINEERING, PLLC504/17/2026
ASHRAF CORP103/17/2025
BAYSIDE ENGINEERING PC312/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING2003/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor2107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing207/08/2026
HF GROUP PLMBG & SPNKLERFire Protection107/08/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S70101006/29/2026
Building Lifecycle
All (99)Filed (16)Permit Issued (16)Signed Off (7)Violation (2)Inspection (14)Objection (14)Special Inspection (30)
09/09/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-S5
09/08/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-S6
08/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-Z2
06/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-S9
06/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-S1
06/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-Z1
06/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-P6
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
06/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/29/2026
Special inspection requirement — Maintenance information
XIUCHENG LI
06/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
06/25/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/11/2026
Permit issued — Boiler Equipment
B08027258-Z2-BE
05/22/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/12/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
XIUCHENG LI
05/12/2026
Special inspection requirement — Interior lighting power
XIUCHENG LI
05/12/2026
Special inspection requirement — Exterior lighting power
XIUCHENG LI
05/12/2026
Special inspection requirement — Fenestration areas
XIUCHENG LI
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
05/12/2026
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
05/12/2026
Special inspection requirement — Metering
XIUCHENG LI
05/12/2026
Special inspection requirement — Lighting controls
XIUCHENG LI
05/12/2026
Special inspection requirement — Protection of exposed foundation insulation
XIUCHENG LI
05/12/2026
Special inspection requirement — Maintenance information
XIUCHENG LI
05/12/2026
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
05/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
05/12/2026
Special inspection requirement — Lighting in dwelling units
XIUCHENG LI
05/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
05/12/2026
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
05/12/2026
Special inspection requirement — Masonry
XIUCHENG LI
04/20/2026
Permit issued — Sprinklers
B08027258-S9-EW-SP
04/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-P5
04/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
04/17/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
XIUCHENG LI
04/17/2026
Special inspection requirement — Fenestration areas
XIUCHENG LI
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
04/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
04/16/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-Z2
03/20/2026
Permit issued — Construction Fence
B08027258-S1-FN
03/02/2026
Permit issued — Structural
B08027258-S7-ST
02/27/2026
Permit issued — Support of Excavation
B08027258-S5-SE
02/26/2026
Permit issued — Foundation
B08027258-S6-FO
02/12/2026
Signed off — Alteration
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01193631-I1
02/11/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/14/2026
Permit issued — Plumbing
B08027258-Z1-PL
01/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-Z1
01/09/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/09/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/09/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/30/2025
Permit issued — Plumbing
B08027258-S8-PL
12/19/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B08027258-P4
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAMC PLBG, HTG & CLNG, INC06/11/2026
DOB NOWSprinklersSigned-offHF GROUP PLMBG & SPNKLER04/20/2026
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC03/20/2026
DOB NOWStructuralSigned-offLXC CONSTRUCTION INC03/02/2026
DOB NOWSupport of ExcavationSigned-offLXC CONSTRUCTION INC02/27/2026
DOB NOWFoundationSigned-offLXC CONSTRUCTION INC02/26/2026
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC01/14/2026
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC12/30/2025
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC10/20/2025
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC04/01/2025
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC03/21/2025
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN03/18/2025
DOB NOWStructuralSigned-offLXC CONSTRUCTION INC02/27/2025
DOB NOWFoundationSigned-offLXC CONSTRUCTION INC02/25/2025
DOB NOWSupport of ExcavationSigned-offLXC CONSTRUCTION INC02/25/2025
DOB NOWStructuralPermit IssuedLXC CONSTRUCTION INC02/25/2025
1 job · most recent 06/29/2026
Sprinkler System
FiledStatusContractorScope
06/29/2026Signed-offHF GROUP PLMBG & SPNKLERSprinkler System
1 job · most recent 06/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/29/2026Signed-offAMC PLBG, HTG & CLNG, INCGas, Storm, Water/Sanitary
2 jobs · most recent 08/08/2026
General Wiring
FiledStatusContractorScope
08/08/2026CompleteGOODALL ELECTRIC CORPGeneral Wiring
01/22/2026CompleteGOODALL ELECTRIC CORP—
1 job · most recent 06/29/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/29/2026Signed-offAMC PLBG, HTG & CLNG, INCSteel, Concrete, Masonry
1 job · most recent 06/29/2026
Fence
FiledStatusContractorScope
06/29/2026Signed-offAMC PLBG, HTG & CLNG, INCFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2026Pass-Final Boiler Equipment InspectionPassView ↗
05/22/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/11/2026Pass-Final PL - UndergroundPassView ↗
01/09/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/09/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/09/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
06/29/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/29/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
06/29/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
06/29/2026HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
06/29/2026Maintenance informationXIUCHENG LIenergy_progress
06/29/2026HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
05/12/2026Fire-Resistance Rated ConstructionXIUCHENG LIprogress
05/12/2026Protection of exposed foundation insulationXIUCHENG LIenergy_progress
05/12/2026Interior lighting powerXIUCHENG LIenergy_progress
05/12/2026Insulation placement and R valuesXIUCHENG LIenergy_progress
05/12/2026Lighting controlsXIUCHENG LIenergy_progress
05/12/2026Exterior lighting powerXIUCHENG LIenergy_progress
05/12/2026Fenestration air leakageXIUCHENG LIenergy_progress
05/12/2026Lighting in dwelling unitsXIUCHENG LIenergy_progress
05/12/2026Air barrier - visual inspectionXIUCHENG LIenergy_progress
05/12/2026Maintenance informationXIUCHENG LIenergy_progress
05/12/2026MeteringXIUCHENG LIenergy_progress
05/12/2026Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
05/12/2026Fenestration areasXIUCHENG LIenergy_progress
05/12/2026MasonryXIUCHENG LIspecial
05/12/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
05/12/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
05/12/2026Construction Operations Influencing Adjacent StructuresXIUCHENG LIspecial
05/12/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
04/17/2026Fenestration areasXIUCHENG LIenergy_progress
Latest 25 of 107.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/22/2026B01193631-I1Request digital key ↗
08/17/2026B08027258-S9Request digital key ↗
08/17/2026B08027258-P6Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZoning Exhibit form (1-5)5
08/17/2026B08027258-P5Open ↗
08/13/2026B08027258-P4Open ↗
08/13/2026B08027258-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/17/2026B08027258-P5Open ↗
08/13/2026B08027258-P2Open ↗
08/13/2026B08027258-P4Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications48
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026B08027258-P4Open ↗
09/01/2026B08027258-P5Open ↗
09/01/2026B08027258-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/17/2026B08027258-P6Open ↗
08/17/2026B08027258-P5Open ↗
08/17/2026B08027258-Z2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B08027258-P4Open ↗
09/01/2026B08027258-P4Open ↗
09/01/2026B08027258-P5Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/17/2026B08027258-P5Open ↗
08/13/2026B08027258-P4Open ↗
08/13/2026B08027258-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08027258-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/17/2026B08027258-P6Open ↗
08/17/2026B08027258-P5Open ↗
08/17/2026B08027258-Z2Open ↗
Showing 3 of 15 on file for this type
▸Other Documents16
▸DOB NOWSite Survey: Initial5
08/17/2026B08027258-P5Open ↗
08/13/2026B08027258-P2Open ↗
08/13/2026B08027258-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026B08027258-P5Open ↗
08/13/2026B08027258-P2Open ↗
08/13/2026B08027258-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026B08027258-P5Open ↗
08/13/2026B08027258-P4Open ↗
08/13/2026B08027258-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08027258-S5Open ↗