Two family brick
844 58 STREET
BROOKLYN · BIN 3140516
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
2,916 sfGross Floor Area
2Units
8 Open Violations ▸FDNY Report ↗
Two family brick · 1,995 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof34p · 3 filings · 20 docs
Floor 430p · 2 filings · 20 docs
Floor 331p · 1 filing · 20 docs
Floor 234p · 2 filings · 20 docs
Floor 132p · 1 filing · 20 docs
Cellar31p · 1 filing · 20 docs
1 job · most recent 01/17/2025
Sprinkler System
FiledStatusContractorScope
01/17/2025Signed-offCASE PLUMBING LLCSprinkler System
1 job · most recent 01/17/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/17/2025Signed-offNYC MAINMAN CORPGas, Storm, Water/Sanitary
2 jobs · most recent 04/21/2025
General Wiring
FiledStatusContractorScope
04/21/2025CompleteBROOKYLN SOLARWORKS, LLC—
10/24/2024CompleteA.C. MORGAN ELECTRICGeneral Wiring
1 job · most recent 01/17/2025
Steel Concrete
FiledStatusContractorScope
01/17/2025Signed-offS & L PLUMBING INCSteel, Concrete
Building Lifecycle
All (137)Filed (15)Permit Issued (10)Signed Off (9)Violation (10)Inspection (9)Objection (54)Special Inspection (30)
10/23/2025
Signed off — Alteration
B01065203-I1
08/14/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01212449-I1
07/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/30/2025
Permit issued — Solar
B01212449-I1-SL
04/28/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01212449-I1
04/17/2025
Special inspection requirement — Final
NARESH MAHANGU
04/17/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/17/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
04/03/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-S5
04/03/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-S6
03/11/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-S8
03/10/2025
Signed off — Alteration
B01031306-I1
02/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/24/2025
Permit issued — Sprinklers
B00898731-S5-EW-SP
01/29/2025
Objection raised — Admin
01/22/2025
Inspection — Pass-Final House Connection
Pass
View inspection ↗
01/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-P4
01/17/2025
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
01/17/2025
Special inspection requirement — Metering
NARESH MAHANGU
01/17/2025
Special inspection requirement — Interior lighting power
NARESH MAHANGU
01/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
01/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
01/17/2025
Special inspection requirement — Lighting controls
NARESH MAHANGU
01/17/2025
Special inspection requirement — Maintenance information
NARESH MAHANGU
01/17/2025
Special inspection requirement — Exterior lighting power
NARESH MAHANGU
01/17/2025
Special inspection requirement — Fenestration areas
NARESH MAHANGU
01/17/2025
Special inspection requirement — Insulation placement and R values
NARESH MAHANGU
01/17/2025
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
01/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/17/2025
Special inspection requirement — Protection of exposed foundation insulation
NARESH MAHANGU
01/17/2025
Special inspection requirement — Chimneys and vents
NARESH MAHANGU
01/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
01/17/2025
Special inspection requirement — Masonry
NARESH MAHANGU
01/17/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
01/17/2025
Special inspection requirement — Lighting in dwelling units
NARESH MAHANGU
01/17/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
12/13/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-S2
12/13/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-S4
12/13/2024
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
12/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
12/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
12/13/2024
Special inspection requirement — Masonry
NARESH MAHANGU
12/13/2024
Special inspection requirement — Chimneys and vents
NARESH MAHANGU
12/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
12/10/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-S3
12/03/2024
Permit issued — Plumbing
B00898731-S8-PL
11/27/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-S8
11/27/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/27/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/27/2024
Objection resolved — Addressed
11/20/2024
Objection raised — Admin
11/18/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-P3
11/14/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/13/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent PL Filing for new sewer work in the front of building only.
B00898731-P2
10/24/2024
Permit issued — Plumbing
B00898731-S6-PL
09/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/16/2024
Violation issued (ECB, closed)
Unknown
Latest 60 of 137 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFE-SHIELD ENTERPRISES404/09/2026
JABBIE INDUSTRIES INCORP*103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/05/2023$1.7M—Private party → Private party$577/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC104/28/2025
JX FLAME SOLUTION INC1101/17/2025
ASHRAF CORP106/12/2024
WT ENGINEERING STUDIO301/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING2803/21/2026
BROOKLYN SOLARWORKS103/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JABBIE INDUSTRIES INCORP*General Contractor1107/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
CASE PLUMBING LLCFire Protection107/08/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor104/09/2026
CATMAN PLUMBING INCPlumbing107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244804/28/2025
JX FLAME SOLUTION INC7286211/18/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC04/30/2025
DOB NOWSprinklersSigned-offS & L PLUMBING INC02/24/2025
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC12/03/2024
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC10/24/2024
DOB NOWGeneral ConstructionPermit IssuedJABBIE INDUSTRIES INCORP*06/13/2024
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN06/13/2024
DOB NOWFoundationSigned-offJABBIE INDUSTRIES INCORP*05/28/2024
DOB NOWStructuralSigned-offJABBIE INDUSTRIES INCORP*05/21/2024
DOB NOWSupport of ExcavationSigned-offJABBIE INDUSTRIES INCORP*05/13/2024
DOB NOWConstruction FenceSigned-offJABBIE INDUSTRIES INCORP*04/09/2024
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2025Pass-Final House ConnectionPassView ↗
11/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/27/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/14/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
04/17/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/17/2025FinalNARESH MAHANGUprogress
04/17/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
04/17/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/17/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
01/17/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
01/17/2025MeteringNARESH MAHANGUenergy_progress
01/17/2025Exterior lighting powerNARESH MAHANGUenergy_progress
01/17/2025Fenestration areasNARESH MAHANGUenergy_progress
01/17/2025Insulation placement and R valuesNARESH MAHANGUenergy_progress
01/17/2025Interior lighting powerNARESH MAHANGUenergy_progress
01/17/2025Lighting in dwelling unitsNARESH MAHANGUenergy_progress
01/17/2025Lighting controlsNARESH MAHANGUenergy_progress
01/17/2025Maintenance informationNARESH MAHANGUenergy_progress
01/17/2025Fenestration air leakageNARESH MAHANGUenergy_progress
01/17/2025Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
01/17/2025Protection of exposed foundation insulationNARESH MAHANGUenergy_progress
01/17/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
01/17/2025Chimneys and ventsNARESH MAHANGUspecial
01/17/2025MasonryNARESH MAHANGUspecial
01/17/2025Concrete - Cast-In-PlaceNARESH MAHANGUspecial
01/17/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/17/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
01/17/2025Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
12/13/2024MasonryNARESH MAHANGUspecial
Latest 25 of 100.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/25/2026B01031306-I1Request digital key ↗
08/25/2026B00898731-S8Request digital key ↗
08/25/2026B00898731-P4Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
07/29/2024340907825Open ↗
01/04/2024340907825Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
10/21/2025340907825Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00898731-I1Open ↗
08/13/2026B00898731-P1Open ↗
08/13/2026B00898731-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00898731-I1Open ↗
08/13/2026B00913651-I1Open ↗
08/13/2026B00898731-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00898731-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/25/2026B00898731-S1Open ↗
08/25/2026B00898731-P4Open ↗
08/25/2026B00898731-S8Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/30/2026B00898731-P3Open ↗
08/30/2026B00898731-P3Open ↗
08/30/2026B00898731-P4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/25/2026B00898731-S5Open ↗
08/30/2026B00898731-P3Open ↗
08/30/2026B00898731-P4Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/29/2024340907825Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/04/2024340907825Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00913651-I1Open ↗
08/13/2026B00898731-P2Open ↗
08/13/2026B00898731-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸BISSTREET TREES SITE PLAN1
10/17/2025340907825Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/17/2025340907825Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/29/2024340907825Open ↗
▸BISSTREET TREE CHECKLIST1
07/29/2024340907825Open ↗
▸BISSTREET TREE SIGNOFF1
10/17/2025340907825Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00898731-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00898731-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00898731-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/25/2026B00898731-S8Open ↗
08/25/2026B00898731-S4Open ↗
08/25/2026B00898731-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026B00898731-S4Open ↗
▸Inspections & Test Reports2
▸BISBPP: FIELD INSPECTION1
10/21/2025340907825Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
10/17/2025340907825Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/21/2025340907825Open ↗
▸BISBPP: FINAL SIGNOFF1
10/21/2025340907825Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01212449-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
10/21/2025340907825Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/04/2024340907825Open ↗
▸Other Documents24
▸DOB NOWSite Survey: Initial5
08/13/2026B00898731-P1Open ↗
08/13/2026B00913651-I1Open ↗
08/13/2026B00898731-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00898731-P4Open ↗
08/13/2026B00913651-I1Open ↗
08/13/2026B00898731-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/25/2026B00898731-P4Open ↗
08/25/2026B00898731-P1Open ↗
08/25/2026B00898731-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
07/29/2024340907825Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
10/21/2025340907825Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/29/2024340907825Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/29/2024340907825Open ↗
▸BISBPP: INFRASTRUCTURE AND SITE SKETCH1
07/29/2024340907825Open ↗
▸BISBPP: FILING REQUIRED1
07/29/2024340907825Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
10/21/2025340907825Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00898731-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00898731-S3Open ↗