← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Second Avenue Condominium
845 2ND AVENUE · BIN 1087512
💬 Discuss this project
2001Year Built
10Stories
RMBuilding Class
C1-9Zoning
14,844 sfGross Floor Area
19Units
Rent Stabilized15 Active Violations 14 unresolved · 1 paperwork only 3 old, status unconfirmed ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: The Second Avenue Condominium · 2,500 sf lot · 5.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNatural gas repiping2 filings
RoofBuilding Equity ManagmentUnder Construction1 filing · 6 docs
BulkheadSuspended scaffold for facade workUnder Construction1p · 1 filing · 5 docs
Site & exteriorBuilding Equity ManagmentUnder Construction4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
845 2nd2303/21/2026
Camelot Property Management507/08/2026
845 Second Ave Co203/21/2026
Lucine Enterprise203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rimkus New York112/02/2025
Everest Civil Engineering111/11/2025
Pve Associates406/24/2022
Ashraf109/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rimkus New York203/21/2026
Northeast Expediting203/21/2026
Janco Building Consultants603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rennon ConstructionScaffold603/21/2026
RSG ConstructionGeneral Contractor307/08/2026
BRW ContractingGeneral Contractor303/21/2026
Superior Plumbing, Heating & MechanicalPlumbing207/08/2026
Stat ElectricElectrical103/21/2026
Steel SystemsScaffold104/09/2026
Pna ContractingGeneral Contractor107/08/2026
Nelson & Tom Maintenance Inc DBElectrical103/21/2026
Lina ElectricElectrical103/22/2026
Archwell Contracting CoGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Soni Engineering Consulting9819104/29/2026
Rimkus New York8123112/02/2025
Partridge Venture Engineering7690306/24/2022
Leo Y Lee Associates2481105/20/2021
Building Lifecycle
All (109)Filed (8)Permit Issued (11)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (2)Special Inspection (14)
06/04/2026
Permit issued — General Construction
M01315361-I1-GC
05/14/2026
Permit issued — Suspended Scaffold
M01317846-I1-SC
04/29/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01317846-I1
12/02/2025
Filed — Alteration
Exterior facade reconstruction work and repairs as necessary and per plans submitted. No change in use, occupancy or egress proposed under this application.
M01315361-I1
11/20/2025
Special inspection requirement — Masonry
JAMES MONAHAN
11/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES MONAHAN
11/20/2025
Special inspection requirement — Post-installed Anchors
JAMES MONAHAN
11/14/2025
Permit issued — Sidewalk Shed
M01316166-I1-SH
11/12/2025
Special inspection requirement — Post-installed Anchors
nayan soni
11/12/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
11/11/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01316166-I1
11/06/2025
Special inspection requirement — Final
JAMES MONAHAN
06/12/2024
Signed off — Alteration
INSTALLATION OF 65' NEW SIDEWALK SHED AT 845 2ND AVENUE MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M00588895-I1
05/28/2024
Permit issued — Sidewalk Shed
M00588895-I1-SH
12/21/2023
Cycle 9 facade report submitted
12/19/2023
Cycle 9 facade report signed — SWARMP
12/11/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2023
Signed off — Alteration
Exterior Facade Restoration as per Plans Filed Herewith. No Change in Use, Egress or Occupancy
M00511003-I1
10/23/2023
Cycle 9 facade inspection completed
05/19/2023
Permit issued — Sidewalk Shed
M00588895-I1-SH
04/25/2023
Permit issued — General Construction
M00511003-I1-GC
11/22/2022
Cycle 9 facade report signed — UNSAFE
11/21/2022
Cycle 9 facade report submitted
11/01/2022
Cycle 9 facade inspection completed
06/24/2022
Filed — Alteration
PROPOSE TO REMOVE AND INSTALL ALL NEW GAS PIPING FOR THE BUILDING INCLUDING THE REPLACEMENT OF GAS RANGES IN ALL APARTMENTS.
M00578600-P1
06/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Sivin
06/24/2022
Special inspection requirement — Energy Code Compliance Inspections
David Sivin
05/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Sivin
05/25/2022
Special inspection requirement — Energy Code Compliance Inspections
David Sivin
04/19/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/04/2022
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
02/28/2022
Permit issued — General Construction
M00671826-I1-GC
02/21/2022
Cycle 9 facade report submitted
02/21/2022
Cycle 9 facade report signed — UNSAFE
02/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2022
Filed — Alteration
M00671826-I1
02/02/2022
Cycle 9 facade inspection completed
11/14/2021
Permit issued — General Construction
M00511003-I1-GC
09/23/2021
Permit issued — Plumbing
M00578600-I1-PL
09/09/2021
Permit issued — Sidewalk Shed
M00588895-I1-SH
09/08/2021
Filed — Alteration
INSTALLATION OF 65' NEW SIDEWALK SHED AT 845 2ND AVENUE MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M00588895-I1
08/24/2021
Filed — Alteration
PROPOSE TO REMOVE AND INSTALL ALL NEW GAS PIPING FOR THE BUILDING INCLUDING THE REPLACEMENT OF GAS RANGES IN ALL APARTMENTS.
M00578600-I1
07/01/2021
Permit issued — General Construction
M00511003-I1-GC
05/20/2021
Filed — Alteration
Exterior Facade Restoration as per Plans Filed Herewith. No Change in Use, Egress or Occupancy
M00511003-I1
05/18/2021
Special inspection requirement — Air barrier - visual inspection
ALAN DUDLEY
05/04/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
05/04/2021
Special inspection requirement — Energy Code Compliance Inspections
ALAN DUDLEY
04/27/2021
Special inspection requirement — Final
ALAN DUDLEY
12/22/2020
Violation issued (HPD, open)
A
12/22/2020
Violation issued (HPD, open)
A
12/22/2020
Violation issued (HPD, open)
A
12/22/2020
Violation issued (HPD, open)
B
12/22/2020
Violation issued (HPD, open)
B
12/22/2020
Violation issued (HPD, open)
C
12/22/2020
Violation issued (HPD, open)
C
12/22/2020
Violation issued (HPD, open)
A
12/22/2020
Violation issued (HPD, open)
B
12/22/2020
Violation issued (HPD, open)
A
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPna Contracting06/04/2026
DOB NOWSuspended ScaffoldPermit IssuedPna Contracting05/14/2026
DOB NOWSidewalk ShedPermit IssuedSteel Systems11/14/2025
DOB NOWSidewalk ShedSigned-offRennon Construction05/28/2024
DOB NOWSidewalk ShedSigned-offRennon Construction05/19/2023
DOB NOWGeneral ConstructionSigned-offBRW Contracting04/25/2023
DOB NOWGeneral ConstructionSigned-offArchwell Contracting Co02/28/2022
DOB NOWGeneral ConstructionSigned-offRSG Construction11/14/2021
DOB NOWPlumbingSigned-offSuperior Plumbing, Heating09/23/2021
DOB NOWSidewalk ShedSigned-offRennon Construction09/09/2021
DOB NOWGeneral ConstructionSigned-offRSG Construction07/01/2021
BISOTISSUEDNortheast Wireless Development03/29/2013
BIS—ISSUEDNY Sign City09/21/2004
BISSPISSUEDAriana Contracting04/24/2002
BISEQISSUEDRockledge Scaffold03/08/2002
BISEQISSUEDWing Hin Construction12/20/2001
BIS—ISSUEDWing Hin Construction12/20/2001
BISPLISSUEDAriana Contracting11/14/2001
BISEQISSUEDWing Hin Construction08/08/2001
BIS—ISSUEDWing Hin Construction08/08/2001
BIS—ISSUEDWing Kin Construction02/20/2001
BISEQISSUEDWing Kin Construction01/17/2001
BISEQISSUEDWing Kin Construction07/18/2000
BIS—ISSUEDWing Kin Construction07/18/2000
BISOTISSUEDRahmet Tashkent04/07/1998
BISFPISSUEDFire Foe12/13/1995
BISEQISSUEDKA Wah Construction03/25/1992
BISOTISSUEDKA Wah Construction03/25/1992
1 project · most recent 06/24/2022
Gas
FiledStatusContractorScope
06/24/2022Signed-offSuperior Plumbing, HeatingGas
2 projects · most recent 09/07/2021
General Wiring
FiledStatusContractorScope
09/07/2021Permit IssuedHigh Quality Electric of—
01/06/2020CompleteLina ElectricGeneral Wiring
1 project · most recent 11/11/2025
Sidewalk Shed
FiledStatusContractorScope
11/11/2025Permit IssuedSteel SystemsSidewalk Shed
1 project · most recent 04/29/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/29/2026Permit IssuedPna ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/04/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
11/20/2025MasonryJAMES MONAHANspecial
11/20/2025Tenant Protection Plan ComplianceJAMES MONAHANspecial
11/20/2025Post-installed AnchorsJAMES MONAHANspecial
11/12/2025Post-installed Anchorsnayan sonispecial
11/12/2025Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
11/06/2025FinalJAMES MONAHANprogress
06/24/2022Fire-Resistant Penetrations and JointsDavid Sivinspecial
06/24/2022Energy Code Compliance InspectionsDavid Sivinprogress
05/25/2022Fire-Resistant Penetrations and JointsDavid Sivinspecial
05/25/2022Energy Code Compliance InspectionsDavid Sivinprogress
05/18/2021Air barrier - visual inspectionALAN DUDLEYenergy_progress
05/04/2021Structural Stability – Alterations of existing buildingsLeo Leespecial
05/04/2021Energy Code Compliance InspectionsALAN DUDLEYprogress
04/27/2021FinalALAN DUDLEYprogress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026M00511003-I1Request digital key ↗
09/03/2026M00588895-I1Request digital key ↗
09/02/2026M00671826-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
03/06/2013121051440Open ↗
01/17/2013121051440Open ↗
▸BISWORK PERMIT APPLICATION1
04/02/2013121051440Open ↗
▸Seals & Professional Certifications24
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026M01315361-I1Open ↗
09/01/2026M01315361-I1Open ↗
09/01/2026M01315361-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00511003-I1Open ↗
09/03/2026M00588895-I1Open ↗
09/02/2026M00671826-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M01315361-I1Open ↗
09/01/2026M00578600-I1Open ↗
08/26/2026M00578600-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION3
04/02/2013121051440Open ↗
04/02/2013121051440Open ↗
01/17/2013121051440Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/31/2013121051440Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/17/2013121051440Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00511003-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/15/2013121051440Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/17/2013121051440Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/17/2026M01317846-I1Open ↗
▸DOB NOWCalculations1
08/17/2026M01317846-I1Open ↗