Roof7p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT CELLAR WILL SUPERCEDE APPL # 300571717.
On file for this project
34 documents · 1 drawing sheet
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
On file for this project
9 documents · 1 drawing sheet
DEMO OF INT. PARTITIONS,DOORS, KIT. CABINETS, WALL & FLOOR TILES IN BATHRMS,EX. FLOOR SYST. WILL NOT BE DISTURBED DURING CONST. ACTIVITY. NEW FLOOR WILL BE INSTALLED OVER EX., EXT. MASONRY REPAIRS.REMOVE & REPLACE ROOF GUARD RAILS & OUTER SITE IMPROVEMENT
On file for this project
28 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Bulkhead2p · 1 filing · 20 docs
Architecture
DEMO OF INT. PARTITIONS,DOORS, KIT. CABINETS, WALL & FLOOR TILES IN BATHRMS,EX. FLOOR SYST. WILL NOT BE DISTURBED DURING CONST. ACTIVITY. NEW FLOOR WILL BE INSTALLED OVER EX., EXT. MASONRY REPAIRS.REMOVE & REPLACE ROOF GUARD RAILS & OUTER SITE IMPROVEMENT
On file for this project
28 documents · 2 drawing sheets
Floor 43p · 1 filing · 13 docs
ArchitectureDMMechanicalPlumbing
PARTIAL DEMOLITION AND TEMPORARY ERECTION OF NON-BEARING PARTITIONS TO ALLOW FOR A PASSAGEWAY FOR ACCESS TO ELEVATOR WHILE BEING REPAIRED DURING ELEVATOR RENOVATION & CAB REPLACEMENT.
On file for this project
13 documents · 3 drawing sheets
Floor 3
Floor 21p · 1 filing · 20 docs
Architecture
DEMO OF INT. PARTITIONS,DOORS, KIT. CABINETS, WALL & FLOOR TILES IN BATHRMS,EX. FLOOR SYST. WILL NOT BE DISTURBED DURING CONST. ACTIVITY. NEW FLOOR WILL BE INSTALLED OVER EX., EXT. MASONRY REPAIRS.REMOVE & REPLACE ROOF GUARD RAILS & OUTER SITE IMPROVEMENT
On file for this project
28 documents · 1 drawing sheet
Floor 19p · 3 filings · 20 docs
ArchitectureDMMechanicalPlumbing
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT CELLAR WILL SUPERCEDE APPL # 300571717.
On file for this project
34 documents · 2 drawing sheets
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
On file for this project
9 documents · 1 drawing sheet
DEMO OF INT. PARTITIONS,DOORS, KIT. CABINETS, WALL & FLOOR TILES IN BATHRMS,EX. FLOOR SYST. WILL NOT BE DISTURBED DURING CONST. ACTIVITY. NEW FLOOR WILL BE INSTALLED OVER EX., EXT. MASONRY REPAIRS.REMOVE & REPLACE ROOF GUARD RAILS & OUTER SITE IMPROVEMENT
On file for this project
28 documents · 6 drawing sheets
Cellar10p · 2 filings · 20 docs
ArchitectureDMStructuralOther
DEMO OF INT. PARTITIONS,DOORS, KIT. CABINETS, WALL & FLOOR TILES IN BATHRMS,EX. FLOOR SYST. WILL NOT BE DISTURBED DURING CONST. ACTIVITY. NEW FLOOR WILL BE INSTALLED OVER EX., EXT. MASONRY REPAIRS.REMOVE & REPLACE ROOF GUARD RAILS & OUTER SITE IMPROVEMENT
On file for this project
28 documents · 9 drawing sheets
INSTALLATION OF NEW 6 CMU BLOCK NON-LOAD BEARING WALLS AT CELLAR WITH REINFORCED CONCRETE FOOTING ON VIRGIN SOIL AS PER PLANS FILED.
On file for this project
8 documents · 1 drawing sheet
Basement3p · 2 filings · 20 docs
MechanicalPlumbing
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT CELLAR WILL SUPERCEDE APPL # 300571717.
On file for this project
34 documents · 2 drawing sheets
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
On file for this project
9 documents · 1 drawing sheet