← Back
Elevator apt, fireproof without stores
Boulevard Houses
845 STANLEY AVENUE · BIN 3324276
💬 Discuss this project
1930Year Built
6Stories
D3Building Class
R5Zoning
696,525 sfGross Floor Area
576Units
LL97 CoveredRent Stabilized67 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BOULEVARD TOGETHER OWNER LLC · 508,250 sf lot · 1.37 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof7p · 4 filings · 20 docs
Floor 67p · 3 filings · 20 docs
Floor 59p · 3 filings · 16 docs
Floor 48p · 3 filings · 20 docs
Floor 38p · 3 filings · 20 docs
Floor 28p · 3 filings · 19 docs
Floor 112p · 5 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Basement4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY5908/31/2026
BOULEVARD TOGETHER DEVELOPER807/08/2026
PLATINUM SERVICES NY703/22/2026
PROPERTY RESOURCES503/22/2026
BOULEVARD TOGETHER OWNER LLC203/22/2026
NYC HOUSING AUTHORITY LIS203/22/2026
NYC HOUSING AUTHORITY1503/22/2026
NYCHA 99403/22/2026
AAD CONSTRUCTION103/22/2026
NYCHA303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC703/24/2026
PETER CLEMENTS ARCHITECT1802/14/2025
M. HAMDI GUNAL, PE, P. C.212/04/2023
BERNARD OCASIO ARCHITECT, P.C.110/26/2023
ASHRAF CORP108/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP2603/21/2026
GREEN STUDIO203/21/2026
SANDEEP KAUR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor4107/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
AURA PLUMBING INCPlumbing407/08/2026
SMITH, STEPHENElectrical103/21/2026
CINTRON ELECL SVCS & LIGTElectrical103/22/2026
SUTTON, ALEXElectrical103/21/2026
COLE, VINCENTElectrical103/21/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS70792603/24/2026
AMARACON TESTING & INSPEC5842402/14/2025
AP PROFESSIONAL ENGINEERI5974105/13/2024
INTERNATIONAL GEOTEHCNICA1795110/26/2023
Building Lifecycle
All (211)Filed (30)Permit Issued (33)Signed Off (16)Facade (FISP) (17)Violation (60)Inspection (5)Objection (20)Special Inspection (30)
06/10/2026
Signed off — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT CELLAR WILL SUPERCEDE APPL # 300571673.
B00538307-I1
03/24/2026
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT CELLAR WILL SUPERCEDE APPL # 300571673.
B00538307-P4
02/27/2026
Signed off — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539292-I1
02/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
02/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
02/23/2026
Special inspection requirement — Final
Christopher Burgess
02/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
02/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
02/23/2026
Special inspection requirement — Maintenance information
Christopher Burgess
02/23/2026
Special inspection requirement — Shutoff dampers
Christopher Burgess
02/23/2026
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
02/23/2026
Special inspection requirement — Mechanical Systems
Christopher Burgess
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, closed)
C
11/06/2025
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK & INSPECTION.
B01046826-I1
11/05/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
B
10/14/2025
Filed — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539292-P1
10/08/2025
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT CELLAR WILL SUPERCEDE APPL # 300571673.
B00538307-P3
10/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
10/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
10/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
10/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
10/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/11/2025
Cycle 10 facade report submitted
06/10/2025
Cycle 10 facade report signed — SAFE
06/09/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/04/2025
Permit issued — Plumbing
B00538307-I1-PL
06/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2025
Cycle 10 facade inspection completed
05/07/2025
Violation issued (HPD, closed)
C
05/07/2025
Violation issued (HPD, open)
B
05/01/2025
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT CELLAR WILL SUPERCEDE APPL # 300571673.
B00538307-P2
04/30/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION DEBRIS CHUTE IN CONJUNCTION WITH INTERIOR RENOVATION UNDER JOB # B00530321.
B00949232-I1
04/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
04/07/2025
Special inspection requirement — Maintenance information
Christopher Burgess
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
04/07/2025
Special inspection requirement — Mechanical Systems
Christopher Burgess
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
04/07/2025
Special inspection requirement — Shutoff dampers
Christopher Burgess
04/07/2025
Special inspection requirement — Final
Christopher Burgess
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
03/23/2025
Violation issued (HPD, closed)
B
03/23/2025
Violation issued (HPD, closed)
B
03/23/2025
Violation issued (HPD, closed)
A
03/23/2025
Violation issued (HPD, closed)
A
03/10/2025
Signed off — Alteration
B00530321-I1
Latest 60 of 211 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAURA PLUMBING INC06/04/2025
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP02/21/2025
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/04/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP09/19/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP09/18/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP08/29/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP08/29/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP08/29/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP08/29/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/07/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP08/01/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP07/24/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP06/21/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP06/21/2024
DOB NOWSuspended ScaffoldPermit IssuedJAVA BUILDERS INC05/16/2024
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offA.A.D. CONSTRUCTION CORP11/30/2023
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP11/28/2023
DOB NOWPlumbingSigned-offAURA PLUMBING INC11/13/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/21/2023
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP07/20/2023
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP06/28/2023
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP06/28/2023
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/06/2022
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/06/2022
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/06/2022
DOB NOWPlumbingSigned-offAURA PLUMBING INC12/02/2022
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP06/15/2022
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/15/2021
DOB NOWPlumbingSigned-offAURA PLUMBING INC12/09/2021
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/09/2021
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/07/2021
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/07/2021
BISOTISSUEDNEELAM CONSTRUCTION CORP08/03/2015
BISOTISSUEDNEELAM CONSTRUCTION CORP05/28/2015
BISEQISSUEDNEELAM CONSTRUCTION CORP05/05/2015
BISEQISSUEDSKYWORX CONTRACTING INC04/23/2015
BISEQISSUEDTWIN & SWING SCAFFOLDING02/14/2011
BISEQISSUEDTWIN & SWING SCAFFOLDING02/10/2011
BISEQISSUEDTWIN & SWING SCAFFOLDING10/19/2010
+ 5 more permits on file
7 projects · most recent 04/23/2025
General Wiring
FiledStatusContractorScope
04/23/2025Permit IssuedR.C.M. ELECTRIC CORP.—
01/04/2025CompleteCINTRON ELECL SVCS & LIGTGeneral Wiring
01/04/2025CompleteCINTRON ELECL SVCS & LIGTGeneral Wiring
08/10/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
03/29/2023Permit IssuedCINTRON ELECL SVCS & LIGTGeneral Wiring
07/26/2022CompleteGPN ELECTRIC CORP—
04/14/2022Permit IssuedR.C.M. ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/09/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
02/24/2026HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
02/24/2026Fire-Resistant Penetrations and JointsChristopher Burgessspecial
02/24/2026Energy Code Compliance InspectionsChristopher Burgessprogress
02/24/2026HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
02/24/2026HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
02/23/2026HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
02/23/2026Maintenance informationChristopher Burgessenergy_progress
02/23/2026Shutoff dampersChristopher Burgessenergy_progress
02/23/2026Duct leakage testing, insulation and designChristopher Burgessenergy_progress
02/23/2026Mechanical SystemsChristopher Burgessspecial
02/23/2026Fire-Resistant Penetrations and JointsChristopher Burgessspecial
02/23/2026Energy Code Compliance InspectionsChristopher Burgessprogress
02/23/2026FinalChristopher Burgessprogress
02/23/2026HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
10/07/2025Energy Code Compliance InspectionsChristopher Burgessprogress
10/07/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
10/07/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
10/07/2025HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
10/07/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
04/07/2025Duct leakage testing, insulation and designChristopher Burgessenergy_progress
04/07/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
04/07/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
04/07/2025Shutoff dampersChristopher Burgessenergy_progress
04/07/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
04/07/2025Mechanical SystemsChristopher Burgessspecial
Latest 25 of 150.
▾Documents — 294 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
09/01/2026B00530321-P3Request digital key ↗
09/01/2026B00530321-I1Request digital key ↗
09/01/2026B00530321-P1Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION11
08/06/2015340237416Open ↗
05/28/2015340237416Open ↗
05/03/2015340237425Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
05/06/2015340237416Open ↗
05/03/2015340237425Open ↗
04/21/2015340251177Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications146
▸DOB NOWProgress Inspector Seal & Signature63
09/29/2026B00530321-P2Open ↗
09/29/2026B00530321-P2Open ↗
09/29/2026B00530321-P2Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/29/2026B00530321-P2Open ↗
09/29/2026B00530321-P2Open ↗
09/23/2026B01071594-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/01/2026B00530321-P2Open ↗
09/01/2026B00530321-P3Open ↗
09/01/2026B00530321-I1Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/17/2016340237416Open ↗
03/01/2016340251177Open ↗
03/01/2016340251177Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/06/2015340237416Open ↗
05/03/2015340237425Open ↗
04/21/2015340251177Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/06/2015340237416Open ↗
05/03/2015340237425Open ↗
04/21/2015340251177Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/03/2010320236393Open ↗
10/20/2010320228277Open ↗
09/17/2007310024988Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/06/2015340237416Open ↗
05/03/2015340237425Open ↗
04/21/2015340251177Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/03/2010320236393Open ↗
10/20/2010320228277Open ↗
09/17/2007310024988Open ↗
▸BISPC FULL REPORT1
09/17/2007310024988Open ↗
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/01/2026B00530321-P2Open ↗
09/01/2026B00530321-P3Open ↗
09/01/2026B00530321-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
09/01/2026B00530360-I1Open ↗
08/24/2026B01046137-I1Open ↗
08/24/2026B01046136-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
11/03/2010320236393Open ↗
10/20/2010320228277Open ↗
09/17/2007310024988Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/06/2015340237416Open ↗
11/03/2011320162667Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/17/2016340237416Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/17/2016340237416Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis.4
09/01/2026B00530321-I1Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/17/2016340237416Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/06/2015340237416Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/17/2016340237416Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/06/2015340237416Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/06/2015340237416Open ↗
05/03/2015340237425Open ↗
04/21/2015340251177Open ↗
▸Approvals, Objections & Sign-offs46
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
09/01/2026B00530321-P3Open ↗
09/01/2026B00530321-I1Open ↗
09/01/2026B00530321-P1Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/17/2016340237416Open ↗
03/01/2016340251177Open ↗
12/05/2015340237425Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/29/2011320236393Open ↗
10/12/2011320228277Open ↗
10/12/2011320228277Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
11/03/2010320236393Open ↗
10/20/2010320228277Open ↗
05/20/2010320162667Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
09/01/2026B00530321-I1Open ↗
08/13/2026B00538307-I1Open ↗
08/13/2026B00539292-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B00949232-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
11/17/2016340237416Open ↗
05/06/2015340237416Open ↗
11/03/2011320162667Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
11/03/2010320236393Open ↗
10/20/2010320228277Open ↗
05/20/2010320162667Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
05/06/2015340237416Open ↗
05/03/2015340237425Open ↗
04/21/2015340251177Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/23/2011320228277Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/28/2015340237416Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026B01046826-I1Open ↗