← Back
Elevator apt, fireproof without stores
Boulevard Houses
845 STANLEY AVENUE · BIN 3324280
💬 Discuss this project
1930Year Built
6Stories
D3Building Class
R5Zoning
696,525 sfGross Floor Area
576Units
LL97 CoveredRent Stabilized67 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BOULEVARD TOGETHER OWNER LLC · 508,250 sf lot · 1.37 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof7p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 64p · 1 filing · 5 docs
Floor 54p · 1 filing · 5 docs
Floor 44p · 1 filing · 5 docs
Floor 34p · 1 filing · 5 docs
Floor 24p · 1 filing · 5 docs
Floor 112p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Basement1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY3807/08/2026
PLATINUM SERVICES NY607/08/2026
BOULEVARD TOGETHER DEVELOPER807/08/2026
BOULEVARD TOGETHER OWNER LLC203/22/2026
NYC HOUSING AUTHORITY1603/22/2026
NYCHA 99403/22/2026
NYCHA603/22/2026
AAD CONSTRUCTION103/22/2026
NEW YORK HOUSING AUTHORITY103/21/2026
METROPOLITAN ENTERPRISES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC610/14/2025
PETER CLEMENTS ARCHITECT610/01/2024
M. HAMDI GUNAL, PE, P. C.212/04/2023
BERNARD OCASIO ARCHITECT, P.C.111/02/2022
ASHRAF CORP106/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP1403/21/2026
PLATINUM SERVICES NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor2707/08/2026
AURA PLUMBING INCPlumbing2307/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
SMITH, STEPHENElectrical303/21/2026
PABLO CINTRONElectrical303/21/2026
SUTTON, ALEXElectrical103/21/2026
COLE, VINCENTElectrical103/21/2026
CINTRON ELECL SVCS & LIGTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS70791110/14/2025
AMARACON TESTING & INSPEC5842310/01/2024
INTERNATIONAL GEOTEHCNICA1795111/02/2022
Building Lifecycle
All (164)Filed (16)Permit Issued (23)Signed Off (7)Facade (FISP) (14)Violation (54)Inspection (4)Objection (16)Special Inspection (30)
01/07/2026
Signed off — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539298-I1
11/13/2025
Violation issued (HPD, closed)
C
11/13/2025
Violation issued (HPD, closed)
C
10/14/2025
Filed — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539298-P1
10/14/2025
Special inspection requirement — Mechanical Systems
Christopher Burgess
10/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
10/14/2025
Special inspection requirement — Maintenance information
Christopher Burgess
10/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
10/14/2025
Special inspection requirement — Shutoff dampers
Christopher Burgess
10/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
10/14/2025
Special inspection requirement — Final
Christopher Burgess
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
07/16/2025
Signed off — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED.
B00536566-I1
07/02/2025
Objection resolved — Addressed
06/17/2025
Objection raised — Plumbing
06/12/2025
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED.
B00536566-P3
06/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
06/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
06/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
06/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
05/31/2025
Cycle 10 facade report submitted
05/31/2025
Cycle 10 facade report signed — SAFE
05/06/2025
Cycle 10 facade inspection completed
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
04/07/2025
Special inspection requirement — Final
Christopher Burgess
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
04/07/2025
Special inspection requirement — Mechanical Systems
Christopher Burgess
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
04/07/2025
Special inspection requirement — Maintenance information
Christopher Burgess
04/07/2025
Special inspection requirement — Shutoff dampers
Christopher Burgess
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
03/27/2025
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED.
B00536566-P2
03/27/2025
Violation issued (HPD, closed)
B
03/27/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
C
12/04/2024
Permit issued — Mechanical Systems
B00539298-I1-MS
11/12/2024
Signed off — Alteration
B00532818-I1
10/16/2024
Special inspection requirement — Lighting in dwelling units
Christopher Burgess
10/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
10/16/2024
Special inspection requirement — Masonry
CONNIE PISANI
10/16/2024
Special inspection requirement — Final
Christopher Burgess
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
10/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Burgess
10/01/2024
Filed — Alteration
B00532818-P2
07/16/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/20/2024
Permit issued — General Construction
B00532818-I1-ST
06/20/2024
Permit issued — General Construction
B00532818-I1-GC
06/20/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/04/2024
Filed — Alteration
B00532818-P1
06/03/2024
Violation issued (HPD, closed)
A
06/03/2024
Violation issued (HPD, closed)
A
06/03/2024
Violation issued (HPD, closed)
A
06/03/2024
Violation issued (HPD, closed)
B
06/03/2024
Violation issued (HPD, closed)
C
06/03/2024
Violation issued (HPD, closed)
A
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/04/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP06/20/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP06/20/2024
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/07/2023
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP11/28/2023
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP11/28/2023
DOB NOWPlumbingSigned-offAURA PLUMBING INC11/13/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/25/2023
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP06/29/2023
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP06/29/2023
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/07/2022
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/06/2022
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/06/2022
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/05/2022
DOB NOWPlumbingSigned-offAURA PLUMBING INC12/02/2022
DOB NOWProtection and Mechanical MethodsSigned-offA.A.D. CONSTRUCTION CORP11/15/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/21/2022
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP06/15/2022
DOB NOWPlumbingSigned-offAURA PLUMBING INC12/08/2021
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/07/2021
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/07/2021
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/06/2021
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/04/2021
BISOTISSUEDNEELAM CONSTRUCTION CORP08/03/2015
BISOTISSUEDNEELAM CONSTRUCTION CORP06/10/2015
BISEQISSUEDNEELAM CONSTRUCTION CORP05/11/2015
BISEQISSUEDSKYWORX CONTRACTING INC04/23/2015
BISEQISSUEDMETROPOLITAN ENTERPR INC05/20/2011
BISEQISSUEDMETROPOLITAN ENTERPR INC05/27/2010
BISEQISSUEDTWIN & SWING SCAFFOLDING05/14/2010
BISEQISSUEDTWIN & SWING SCAFFOLDING05/11/2010
BISEQISSUEDMETROPOLITAN ENTERPR INC01/15/2010
BISEQISSUEDMBR CONT INC09/13/2007
BISPLISSUEDPERFORMANCE PLUMBING01/16/2007
BISEQISSUEDMBR CONT INC09/30/2005
BISPLISSUEDDELPHI PLBG. & HTG., INC07/15/2005
BISEQISSUEDMBR CONT INC04/26/2005
BISPLISSUEDV. C. VITANZA SONS INC11/24/2004
BISPLISSUEDDELPHI PLBG. & HTG., INC08/19/2004
BISPLISSUEDV. C. VITANZA SONS INC12/01/2003
6 projects · most recent 01/04/2025
General Wiring
FiledStatusContractorScope
01/04/2025CompleteCINTRON ELECL SVCS & LIGTGeneral Wiring
01/04/2025Permit IssuedCINTRON ELECL SVCS & LIGTGeneral Wiring
01/04/2025CompleteCINTRON ELECL SVCS & LIGTGeneral Wiring
07/27/2022Permit IssuedGPN ELECTRIC CORP—
06/30/2022CompleteB.P. ELECTRIC CORPGeneral Wiring
04/14/2022Permit IssuedR.C.M. ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/30/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
10/14/2025Mechanical SystemsChristopher Burgessspecial
10/14/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
10/14/2025Maintenance informationChristopher Burgessenergy_progress
10/14/2025Duct leakage testing, insulation and designChristopher Burgessenergy_progress
10/14/2025Shutoff dampersChristopher Burgessenergy_progress
10/14/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
10/14/2025Energy Code Compliance InspectionsChristopher Burgessprogress
10/14/2025FinalChristopher Burgessprogress
10/14/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
06/04/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
06/04/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
06/04/2025HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
06/04/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
06/04/2025Energy Code Compliance InspectionsChristopher Burgessprogress
04/07/2025Duct leakage testing, insulation and designChristopher Burgessenergy_progress
04/07/2025FinalChristopher Burgessprogress
04/07/2025Energy Code Compliance InspectionsChristopher Burgessprogress
04/07/2025Mechanical SystemsChristopher Burgessspecial
04/07/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
04/07/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
04/07/2025Maintenance informationChristopher Burgessenergy_progress
04/07/2025Shutoff dampersChristopher Burgessenergy_progress
04/07/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
10/16/2024Lighting in dwelling unitsChristopher Burgessenergy_progress
10/16/2024Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
Latest 25 of 58.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/01/2026B00532849-P1Request digital key ↗
09/01/2026B00536566-P3Request digital key ↗
09/01/2026B00536566-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
08/07/2015340237522Open ↗
06/10/2015340237522Open ↗
05/07/2015340237531Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
11/16/2021301115255Open ↗
05/07/2015340237531Open ↗
05/07/2015340237522Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature25
09/29/2026B00536566-P3Open ↗
09/29/2026B00536566-P3Open ↗
09/02/2026B00532849-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026B00532849-P1Open ↗
09/01/2026B00532849-I1Open ↗
09/01/2026B00536566-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/29/2026B00536566-P3Open ↗
09/01/2026B00532818-P1Open ↗
09/01/2026B00532818-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/25/2016340237522Open ↗
02/26/2016340251284Open ↗
02/26/2016340251284Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/07/2015340237531Open ↗
05/07/2015340237522Open ↗
04/21/2015340251284Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/07/2015340237531Open ↗
05/07/2015340237522Open ↗
04/21/2015340251284Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/14/2010320155595Open ↗
05/12/2010320154989Open ↗
01/19/2010320114158Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/07/2015340237531Open ↗
05/07/2015340237522Open ↗
04/21/2015340251284Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
05/14/2010320155595Open ↗
05/12/2010320154989Open ↗
01/19/2010320114158Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00536566-P2Open ↗
09/01/2026B00536566-P3Open ↗
09/01/2026B00536566-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
05/14/2010320155595Open ↗
05/12/2010320154989Open ↗
01/19/2010320114158Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
03/25/2016340237522Open ↗
03/25/2016340237522Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/07/2015340237522Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
12/27/2013320114158Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026B00532849-I1Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis.4
09/01/2026B00536566-I1Open ↗
09/01/2026B00532818-I1Open ↗
08/15/2026B00532849-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/25/2016340237522Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/07/2015340237522Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/25/2016340237522Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/07/2015340237522Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/07/2015340237531Open ↗
05/07/2015340237522Open ↗
04/21/2015340251284Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/27/2013320114158Open ↗
▸Approvals, Objections & Sign-offs29
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/01/2026B00532849-P1Open ↗
09/01/2026B00536566-P1Open ↗
09/01/2026B00536566-P3Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/25/2016340237522Open ↗
02/26/2016340251284Open ↗
11/27/2015340237531Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/19/2010320162818Open ↗
05/14/2010320155595Open ↗
05/12/2010320154989Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
09/01/2026B00532849-P1Open ↗
08/15/2026B00532849-I1Open ↗
08/13/2026B08028437-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
09/01/2026B00536566-I1Open ↗
09/01/2026B00532818-I1Open ↗
08/15/2026B00532849-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/20/2011320155595Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
03/25/2016340237522Open ↗
05/07/2015340237522Open ↗
11/07/2011320162818Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
05/19/2010320162818Open ↗
05/14/2010320155595Open ↗
05/12/2010320154989Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
05/07/2015340237531Open ↗
05/07/2015340237522Open ↗
04/21/2015340251284Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/10/2015340237522Open ↗