← Back
Two family brick
848 57 STREET
BROOKLYN · BIN 3140181
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6Zoning
2,146 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · 2,003 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Penthouse25p · 1 filing · 20 docs
Floor 420p · 1 filing · 20 docs
Floor 319p · 1 filing · 20 docs
Floor 220p · 1 filing · 20 docs
Floor 122p · 2 filings · 20 docs
Cellar29p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUNRISE SENIOR SERVICES1407/08/2026
GUL & G CONTRACTING INC503/22/2026
OWNER OF 848 57 STREET203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL ENGR. INSP. (PEI) CONSULTANTS102/27/2026
A PLUS DESIGN INC1605/14/2024
ASHRAF CORP112/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
A PLUS DESIGN INC.3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVENTADOR CONSTRUCTION INGeneral Contractor2807/08/2026
DPH PLUMBING & HTG CORPPlumbing607/08/2026
A7 CONSTRUCTION SERVICE LGeneral Contractor303/21/2026
GUL & G CONTRACTING INCGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing307/08/2026
CAPTAIN RENOVATION & CONElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
CHAO HONG LIANGElectrical103/21/2026
HONGTENG CHENElectrical103/21/2026
CASE PLUMBING LLCFire Protection107/08/2026
DYKER SOLUTIONS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A PLUS DESIGN INC6615505/14/2024
RENANT ANTREN CORP4307803/22/2023
AA BUILDING & INSPECTION1519212/02/2021
Building Lifecycle
All (163)Filed (18)Permit Issued (19)Signed Off (9)Violation (17)Inspection (16)Objection (54)Special Inspection (30)
06/02/2026
Signed off — Alteration
INSTALL NEW NON-ILLUMINATED SIGN READ "HL ADULT DAYCARE CENTER INC" AS PER PLAN. NO CHANGE INUSE, EGRESS, AND OCCUPANCY.
B01357225-I1
06/01/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
05/18/2026
Permit issued — Sign
B01357225-I1-SG
02/27/2026
Filed — Alteration
INSTALL NEW NON-ILLUMINATED SIGN READ "HL ADULT DAYCARE CENTER INC" AS PER PLAN. NO CHANGE INUSE, EGRESS, AND OCCUPANCY.
B01357225-I1
11/19/2025
Violation issued (HPD, closed)
I
06/06/2025
Violation issued (HPD, closed)
A
02/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/27/2024
Violation issued (HPD, closed)
I
07/11/2024
Signed off — Alteration CO
CONVERT EXISTING CHILDCARE CENTER ON CELLAR AND 1ST FLOOR TO COMMUNITY CENTER. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00962450-I1
05/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PENG LIU
05/17/2024
Special inspection requirement — Lighting controls
PENG LIU
05/17/2024
Special inspection requirement — Energy Code Compliance Inspections
PENG LIU
05/17/2024
Special inspection requirement — Interior lighting power
PENG LIU
05/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
PENG LIU
05/14/2024
Filed — Alteration CO
CONVERT EXISTING CHILDCARE CENTER ON CELLAR AND 1ST FLOOR TO COMMUNITY CENTER. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00962450-P3
05/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PENG LIU
05/14/2024
Special inspection requirement — Interior lighting power
PENG LIU
05/14/2024
Special inspection requirement — Energy Code Compliance Inspections
PENG LIU
05/14/2024
Special inspection requirement — Lighting controls
PENG LIU
04/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2024
Signed off — Alteration CO
CONVERT EXISTING CHILDCARE CENTER ON CELLAR AND 1ST FLOOR TO COMMUNITY CENTER. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00962450-S1
04/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/02/2024
Objection raised — Other
04/02/2024
Objection resolved — Addressed
03/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
HONGTENG CHEN
03/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
HONGTENG CHEN
03/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
HONGTENG CHEN
03/29/2024
Special inspection requirement — Energy Code Compliance Inspections
HONGTENG CHEN
03/28/2024
Filed — Alteration CO
CONVERT EXISTING CHILDCARE CENTER ON CELLAR AND 1ST FLOOR TO COMMUNITY CENTER. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00962450-P1
03/28/2024
Filed — Alteration CO
CONVERT EXISTING CHILDCARE CENTER ON CELLAR AND 1ST FLOOR TO COMMUNITY CENTER. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00962450-P2
03/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
03/28/2024
Special inspection requirement — Lighting controls
PENG LIU
03/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PENG LIU
03/28/2024
Special inspection requirement — Energy Code Compliance Inspections
PENG LIU
03/28/2024
Special inspection requirement — Interior lighting power
PENG LIU
03/28/2024
Special inspection requirement — Energy Code Compliance Inspections
HONGTENG CHEN
03/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
HONGTENG CHEN
03/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
03/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
HONGTENG CHEN
03/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/07/2024
Permit issued — General Construction
B00962450-I1-GC
03/01/2024
Permit issued — Plumbing
B00962450-S1-PL
02/22/2024
Filed — Alteration CO
CONVERT EXISTING CHILDCARE CENTER ON CELLAR AND 1ST FLOOR TO COMMUNITY CENTER. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00962450-S1
02/02/2024
Objection resolved — Addressed
01/17/2024
Objection raised — Energy
01/11/2024
Objection resolved — Addressed
01/11/2024
Objection resolved — Addressed
01/09/2024
Objection raised — Mechanical
12/27/2023
Objection raised — Structural
12/19/2023
Objection raised — Admin
12/19/2023
Objection resolved — Addressed
12/15/2023
Objection resolved — Addressed
12/06/2023
Objection resolved — Addressed
12/06/2023
Objection resolved — Addressed
12/06/2023
Objection resolved — Addressed
11/29/2023
Objection raised — Structural
11/29/2023
Objection raised — Cost
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC05/18/2026
DOB NOWGeneral ConstructionPermit IssuedDYKER SOLUTIONS03/07/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP03/01/2024
DOB NOWStructuralPermit IssuedAVENTADOR CONSTRUCTION IN01/05/2023
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC12/15/2022
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC11/29/2022
DOB NOWMechanical SystemsSigned-offA7 CONSTRUCTION SERVICE L11/03/2022
DOB NOWSprinklersSigned-offS & L PLUMBING INC08/16/2022
DOB NOWEarth WorkPermit IssuedAVENTADOR CONSTRUCTION IN08/01/2022
DOB NOWEarth WorkSigned-offAVENTADOR CONSTRUCTION IN01/12/2022
DOB NOWFoundationPermit IssuedAVENTADOR CONSTRUCTION IN01/12/2022
DOB NOWConstruction FenceSigned-offAVENTADOR CONSTRUCTION IN01/11/2022
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC12/10/2021
DOB NOWGeneral ConstructionSigned-offAVENTADOR CONSTRUCTION IN11/23/2021
DOB NOWEarth WorkSigned-offAVENTADOR CONSTRUCTION IN11/23/2021
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC11/22/2021
DOB NOWEarth WorkSigned-offAVENTADOR CONSTRUCTION IN11/17/2021
DOB NOWStructuralPermit IssuedAVENTADOR CONSTRUCTION IN10/29/2021
DOB NOWConstruction FenceSigned-offAVENTADOR CONSTRUCTION IN10/19/2021
BISPLISSUEDPINNACLE PLBG & HTG CORP04/26/2000
BIS—ISSUEDAPRIL CONST INC03/27/2000
1 project · most recent 03/22/2023
Air Conditioning Systems Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/22/2023Permit IssuedAVENTADOR CONSTRUCTION INAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin CTXS07LVJU 261 CFM · Ahu ×11
FTXS09LVJU 279 CFM · Ahu ×5
3MXS24RMVJUA 24,000 BTU · Condensing Unit ×4
4MXS36RMVJU 36,000 BTU · Condensing Unit ×1
FTXB12AXVJU 282 CFM · Ahu ×1
RXB12AXVJU 12,000 BTU · Condensing Unit ×1
Oxbox J4AC3060B1000AA 5 tons · Condensing Unit ×2
J4MXCD010AC6HCA 5 tons · Condensing Unit ×2
Heat / Cool
Oxbox J951X120DU5SAAA 120,000 BTU · Furnace ×2
Ventilation
Meite MB14-50 50 CFM ×12
Greenheck SQ-70HP-VG 150 CFM · Exhaust Fan ×1
Ducts & Piping
Titus OMNI 400 CFM ×10
PAR 400 CFM ×10
272RS 400 CFM ×2
350FLF1 1,600 CFM ×2
350RL 100 CFM · Exhaust Fan ×2
1 project · most recent 03/22/2023
Sprinkler System
FiledStatusContractorScope
03/22/2023Signed-offCASE PLUMBING LLCSprinkler System
2 projects · most recent 05/14/2024
Water/Sanitary Gas Storm
FiledStatusContractorScope
05/14/2024Signed-offDPH PLUMBING & HTG CORPWater/Sanitary
03/22/2023Signed-offCATMAN PLUMBING INCGas, Storm, Water/Sanitary
2 projects · most recent 03/31/2024
General Wiring
FiledStatusContractorScope
03/31/2024CompleteCL ELECTRICAL CORPGeneral Wiring
02/14/2023CompleteW 8 ELECTRIC CORPGeneral Wiring
1 project · most recent 03/22/2023
Steel
FiledStatusContractorScope
03/22/2023Permit IssuedAVENTADOR CONSTRUCTION INSteel
1 project · most recent 03/22/2023
Fence
FiledStatusContractorScope
03/22/2023Permit IssuedAVENTADOR CONSTRUCTION INFence
2 projects · most recent 05/14/2024
Tenant Protection Plan 72 Hour Earthwork
FiledStatusContractorScope
05/14/2024Permit IssuedDYKER SOLUTIONS INCTenant Protection Plan 72 Hour
03/22/2023Permit IssuedAVENTADOR CONSTRUCTION INEarthwork
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
06/01/2026Pass-Final Sign Permit InspectionPassView ↗
02/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/02/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/27/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/20/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/22/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/16/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
05/17/2024Structural Stability – Alterations of existing buildingsPENG LIUspecial
05/17/2024Energy Code Compliance InspectionsPENG LIUprogress
05/17/2024Interior lighting powerPENG LIUenergy_progress
05/17/2024Lighting controlsPENG LIUenergy_progress
05/17/2024Tenant Protection Plan CompliancePENG LIUspecial
05/14/2024Energy Code Compliance InspectionsPENG LIUprogress
05/14/2024Tenant Protection Plan Compliance—special
05/14/2024Interior lighting powerPENG LIUenergy_progress
05/14/2024Structural Stability – Alterations of existing buildingsPENG LIUspecial
05/14/2024Lighting controlsPENG LIUenergy_progress
03/29/2024Fire-Resistant Penetrations and JointsHONGTENG CHENspecial
03/29/2024Energy Code Compliance InspectionsHONGTENG CHENprogress
03/29/2024HVAC-R and service water piping design and insulationHONGTENG CHENenergy_progress
03/29/2024Tenant Protection Plan ComplianceHONGTENG CHENspecial
03/28/2024Fire-Resistant Penetrations and JointsHONGTENG CHENspecial
03/28/2024Structural Stability – Alterations of existing buildingsPENG LIUspecial
03/28/2024Tenant Protection Plan Compliance—special
03/28/2024Lighting controlsPENG LIUenergy_progress
03/28/2024Interior lighting powerPENG LIUenergy_progress
03/28/2024Energy Code Compliance InspectionsPENG LIUprogress
03/28/2024Energy Code Compliance InspectionsHONGTENG CHENprogress
03/28/2024HVAC-R and service water piping design and insulationHONGTENG CHENenergy_progress
03/28/2024Tenant Protection Plan Compliance—special
03/30/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
03/30/2023Structural Steel - WeldingYounes Abouyaalaspecial
Latest 25 of 123.
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/31/2026B00644581-I1Request digital key ↗
08/29/2026B00499626-P6Request digital key ↗
08/29/2026B00499626-S6Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
09/21/2021321800235Open ↗
08/25/2021340818235Open ↗
12/13/2018321800235Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZoning Exhibit form (1-5)5
08/25/2026B00962450-P3Open ↗
08/13/2026B00499626-P6Open ↗
08/13/2026B00499626-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00499626-P6Open ↗
08/13/2026B00499626-I1Open ↗
08/13/2026B00499626-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B00962450-I1Open ↗
08/13/2026B00499626-I1Open ↗
▸Seals & Professional Certifications113
▸DOB NOWProgress Inspector Seal & Signature56
09/24/2026B00499626-P4Open ↗
09/24/2026B00499626-P4Open ↗
09/24/2026B00499626-P4Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/24/2026B00499626-P4Open ↗
09/24/2026B00499626-P4Open ↗
09/24/2026B00499626-P4Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/25/2026B00962450-S1Open ↗
08/25/2026B00962450-I1Open ↗
08/25/2026B00962450-P3Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/25/2021340818235Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/25/2021340818235Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/22/2018321800235Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00499626-P3Open ↗
08/13/2026B00499626-P6Open ↗
08/13/2026B00499626-I1Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/22/2018321800235Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist3
08/25/2026B00962450-P3Open ↗
08/15/2026B00962450-P1Open ↗
08/13/2026B00962450-I1Open ↗
▸BISSTREET TREE CHECKLIST2
08/01/2022340818235Open ↗
08/22/2018321800235Open ↗
▸DOB NOWStreet Trees Site Plan2
08/13/2026B00499626-I1Open ↗
08/13/2026B00962450-I1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/13/2026B00962450-I1Open ↗
08/13/2026B00499626-I1Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/03/2022340818235Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00499626-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00499626-S2Open ↗
08/13/2026B00499626-P1Open ↗
08/13/2026B00499626-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026B00499626-S6Open ↗
08/13/2026B00499626-S5Open ↗
08/13/2026B00499626-I1Open ↗
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00499626-I1Open ↗
08/13/2026B00499626-S1Open ↗
08/13/2026B00499626-S2Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/22/2018321800235Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00499626-S6Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026B00499626-P3Open ↗
08/13/2026B00499626-I1Open ↗
08/13/2026B00499626-P6Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00499626-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00499626-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/02/2022340818235Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/22/2018321800235Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
08/22/2018321800235Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00499626-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00499626-I1Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/25/2021340818235Open ↗
▸BISEFILING COVER SHEET1
08/22/2018321800235Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/25/2021340818235Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial3
08/13/2026B00499626-P3Open ↗
08/13/2026B00499626-P6Open ↗
08/13/2026B00499626-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00499626-P6Open ↗
08/13/2026B00499626-I1Open ↗
08/13/2026B00499626-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/25/2026B00962450-P3Open ↗
08/15/2026B00962450-P1Open ↗
08/13/2026B00962450-I1Open ↗
▸DOB NOWFinal Survey2
08/13/2026B00499626-I1Open ↗
08/13/2026B00962450-I1Open ↗
▸BISBPP-5 FORM1
08/03/2022340818235Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/03/2022340818235Open ↗
▸BISPLOT DIAGRAM1
08/22/2018321800235Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00499626-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00499626-I1Open ↗