Longevity Tower Condominium
849 53 STREET · BIN 3138489
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionOther
Floor 66p · 1 filing · 8 docs
Floor 5
Floor 4
Floor 37p · 1 filing · 9 docs
Floor 23p · 1 filing · 4 docs
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T J 8 AVE904/09/2026
WELL BULL REALTY1004/09/2026
H & H MSG LLC1103/22/2026
53 ST UNITED1703/22/2026
NEW YORK H&Y CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/25/2016$1.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSOLIDATED SCAFFOLD BRIDGE1803/21/2026
FANG ARCHITECT403/21/2026
BUILD TEAM803/21/2026
EUROCELT EXPEDITING, INC203/21/2026
MEIYUN CHEN103/21/2026
BUILDING CONSULTING ENGINEERING & A203/21/2026
HTX BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor1307/08/2026
EXPERT FIRE SPRINKLER,LLCFire Protection607/08/2026
PLUMBING NYC INCPlumbing307/08/2026
ZAQ CONSTRUCTION INCGeneral Contractor307/08/2026
THOMAS F. CASH & SONS INCPlumbing207/08/2026
H INTERIOR DESIGN CONSTRUCTIONGeneral Contractor203/21/2026
NEW YORK H&Y CONST INCGeneral Contractor207/08/2026
HP SERVICES INCPlumbing207/08/2026
S & L PLUMBING INCPlumbing203/22/2026
TURNKEY 88 CONTRACTING INGeneral Contractor107/08/2026
TX CONSTRUCTIONS INCGeneral Contractor104/09/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
CHANG HWA TANElectrical103/21/2026
MPS PLUMBING & HEATING INCFire Protection107/08/2026
GLORY R CONSTRUCTION INCGeneral Contractor104/09/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
ERIC & NG ELEC'L, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244404/27/2026
FANG ARCHITECT5513302/20/2026
BUILDING CONSULTING ENGIN1034108/25/2025
HSU & ASSOCIATES8025104/11/2025
ALLEN SHINFELD, P.E. PLLC1305210/23/2024
STEVEN KUO4979206/04/2024
YAN GAO6619203/28/2024
SYED ENGINEERING, P.C.7054309/07/2021
Building Lifecycle
All (231)Filed (26)Permit Issued (27)Signed Off (15)Violation (23)Inspection (32)Objection (78)Special Inspection (30)
05/14/2026
Signed off — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 6TH FL CF#12 (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01109372-I1
05/07/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/27/2026
Filed — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 6TH FL CF#12 (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01109372-P1
04/21/2026
Signed off — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 6TH FL CF#12 (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01109372-S1
04/16/2026
Signed off — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-S1
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Signed off — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-I1
04/07/2026
Permit issued — Sprinklers
B01109372-S1-EW-SP
04/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/06/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
04/02/2026
Special inspection requirement — Interior lighting power
DEZHANG FANG
04/02/2026
Special inspection requirement — Lighting controls
DEZHANG FANG
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/04/2026
Objection resolved — Addressed
03/02/2026
Objection raised — Other
02/20/2026
Filed — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-P1
02/19/2026
Special inspection requirement — Lighting controls
DEZHANG FANG
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
02/19/2026
Special inspection requirement — Interior lighting power
DEZHANG FANG
02/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/02/2026
Permit issued — General Construction
B01304011-I1-GC
01/02/2026
Permit issued — Plumbing
B01304011-S1-PL
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/04/2025
Signed off — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 3RD FL (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01061490-S1
11/24/2025
Signed off — Alteration
PLUMBING & SPRINKLER WORK FOR A MEDICAL OFFICE RENOVATION ON 7TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01025935-I1
11/24/2025
Signed off — Alteration
PLUMBING & SPRINKLER WORK FOR A MEDICAL OFFICE RENOVATION ON 7TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01025935-S1
11/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Accessibility
11/12/2025
Objection raised — Cost
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Accessibility
11/12/2025
Objection raised — Other
10/28/2025
Filed — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-S1
10/28/2025
Filed — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-I1
10/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/02/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/02/2025
Permit issued — Sprinklers
B01109372-S1-EW-SP
08/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/28/2025
Permit issued — Plumbing
B01109372-S1-PL
08/25/2025
Filed — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 6TH FL CF#12 (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01109372-S1
08/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/12/2025
Permit issued — Plumbing
B01025935-S1-EW-SP
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC04/07/2026
DOB NOWGeneral ConstructionSigned-offGLORY R CONSTRUCTION INC01/02/2026
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC01/02/2026
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC09/02/2025
DOB NOWPlumbingSigned-offTHOMAS F. CASH & SONS INC08/28/2025
DOB NOWPlumbingSigned-offEXPERT FIRE SPRINKLER,LLC08/12/2025
DOB NOWPlumbingSigned-offEXPERT FIRE SPRINKLER,LLC08/12/2025
DOB NOWMechanical SystemsSigned-offZAQ CONSTRUCTION INC12/06/2024
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING INC11/01/2024
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN11/01/2024
DOB NOWMechanical SystemsSigned-offH INTERIOR DESIGN CONSTRU10/31/2024
DOB NOWPlumbingSigned-offEXPERT FIRE SPRINKLER,LLC08/09/2024
DOB NOWPlumbingSigned-offEXPERT FIRE SPRINKLER,LLC08/05/2024
DOB NOWSprinklersSigned-offHP SERVICES INC07/25/2024
DOB NOWPlumbingSigned-offHP SERVICES INC07/15/2024
DOB NOWGeneral ConstructionSigned-offTX CONSTRUCTIONS INC07/09/2024
DOB NOWGeneral ConstructionSigned-offZAQ CONSTRUCTION INC07/05/2024
DOB NOWGeneral ConstructionSigned-offTURNKEY 88 CONTRACTING IN03/21/2024
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING05/04/2022
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING03/14/2022
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING05/04/2021
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING02/12/2021
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/16/2020
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING05/08/2020
DOB NOWConstruction FenceSigned-offNEW YORK H&Y CONST INC11/13/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING05/17/2019
DOB NOWConstruction FenceSigned-offNEW YORK H&Y CONST INC06/15/2018
BIS—ISSUEDNEW YORK H&Y CONST INC08/07/2023
BISPLISSUEDPLUMBING NYC INC06/07/2023
BISSPISSUEDPLUMBING NYC, INC06/07/2023
BIS—ISSUEDNEW YORK H&Y CONST INC07/26/2022
BIS—ISSUEDNEW YORK H&Y CONST INC07/26/2022
BISEQISSUEDNEW YORK H&Y CONST INC06/29/2022
BIS—ISSUEDNEW YORK H&Y CONST INC06/29/2022
BISPLISSUEDPLUMBING NYC INC02/16/2022
BISSPISSUEDPLUMBING NYC, INC02/16/2022
BISEQISSUEDNEW YORK H&Y CONST INC08/06/2021
BIS—ISSUEDNEW YORK H&Y CONST INC08/06/2021
BIS—ISSUEDNEW YORK H&Y CONST INC06/30/2021
BISPLISSUEDPLUMBING NYC INC03/12/2021
+ 12 more permits on file
1 project · most recent 04/27/2026
FiledStatusContractorScope
04/27/2026Signed-offEXPERT FIRE SPRINKLER,LLC7 heads
1 project · most recent 04/27/2026
Water/Sanitary
FiledStatusContractorScope
04/27/2026Signed-offTHOMAS F. CASH & SONS INCWater/Sanitary
9 projects · most recent 06/22/2025
General Wiring
FiledStatusContractorScope
06/22/2025CompleteNELSON & TOM MAINT INC DBGeneral Wiring
01/17/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
08/29/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
07/12/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
05/15/2024CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
08/18/2023CompleteERIC & NG ELEC'L, INC.13 meters, 13 new_meters
07/31/2020CompleteTUXEDO ELEC'L CONTR'G INC—
05/15/2019CompleteV. VASS ELECTRIC CORP—
12/11/2018CompleteERIC & NG ELEC'L, INC.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 32
DateTypeResultReport
05/07/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/06/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/04/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 32.
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
04/02/2026Fire-Resistance Rated ConstructionDEZHANG FANGprogress
04/02/2026Energy Code Compliance InspectionsDEZHANG FANGprogress
04/02/2026Interior lighting powerDEZHANG FANGenergy_progress
04/02/2026Lighting controlsDEZHANG FANGenergy_progress
04/02/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/19/2026Lighting controlsDEZHANG FANGenergy_progress
02/19/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/19/2026Energy Code Compliance InspectionsDEZHANG FANGprogress
02/19/2026Fire-Resistance Rated ConstructionDEZHANG FANGprogress
02/19/2026Interior lighting powerDEZHANG FANGenergy_progress
04/10/2025Mechanical SystemsChih Hsuspecial
04/10/2025Energy Code Compliance InspectionsChih Hsuprogress
04/10/2025Interior lighting powerChih Hsuenergy_progress
04/10/2025FinalChih Hsuprogress
04/10/2025Fire-Resistant Penetrations and JointsChih Hsuspecial
09/10/2024Sprinkler SystemsTONY ONYEAGOROspecial
06/10/2024Fire-Resistant Penetrations and JointsSTEVEN KUOspecial
06/10/2024FinalSTEVEN KUOprogress
06/04/2024Fire-Resistant Penetrations and JointsSTEVEN KUOspecial
06/04/2024FinalSTEVEN KUOprogress
03/26/2024Maintenance informationYAN GAOenergy_progress
03/26/2024Lighting controlsYAN GAOenergy_progress
03/26/2024Interior lighting powerYAN GAOenergy_progress
03/26/2024Mechanical SystemsYAN GAOspecial
03/26/2024Fire-Resistant Penetrations and JointsYAN GAOspecial
Latest 25 of 33.
▾Documents — 268 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch16
09/03/2026B00053167-I1Request digital key ↗
08/25/2026B01025935-I1Request digital key ↗
08/25/2026B01025935-S1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold9
09/02/2026B00362741-I1Request digital key ↗
09/02/2026B00362741-P1Request digital key ↗
09/01/2026B00456812-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00168017-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION24
10/16/2023322116063Open ↗
09/28/2023321502414Open ↗
09/22/2023322116063Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION14
07/29/2022321502414Open ↗
12/10/2020340681541Open ↗
10/27/2020321502414Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/13/2022321502414Open ↗
09/28/2022321502414Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/30/2023321502414Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/03/2019321502414Open ↗
▸BISVERIFY TAX LOT1
10/30/2023321502414Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/22/2019321502414Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/30/2023321502414Open ↗
▸BISZONING DIAGRAM1
07/22/2019321502414Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/03/2019321502414Open ↗
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/03/2026B00053167-I1Open ↗
09/02/2026B00168017-I1Open ↗
09/01/2026B00456812-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
09/25/2019321502414Open ↗
09/25/2019321502414Open ↗
09/16/2019321502414Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026B01022655-I1Open ↗
08/27/2026B01304011-P1Open ↗
08/27/2026B01304011-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/04/2026B00456812-P2Open ↗
08/31/2026B01022655-I1Open ↗
08/29/2026B00456812-P1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/10/2019340681541Open ↗
04/05/2019340670018Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING5
07/19/2019321502414Open ↗
06/26/2019321502414Open ↗
06/25/2019321502414Open ↗
Showing 3 of 5 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD21
06/02/2017321498376Open ↗
▸BISELECTRIC CUT-OFF1
06/02/2017321498376Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
10/30/2023321502414Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/03/2017321502414Open ↗
▸BISSPRINKLER SYSTEMS1
08/24/2023340681541Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
11/02/2023321502414Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
10/29/2020340670018Open ↗
07/03/2019321502414Open ↗
03/03/2017321502414Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/02/2017321498376Open ↗
06/02/2017321498376Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
09/25/2019321502414Open ↗
09/13/2019340670018Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/05/2020340670018Open ↗
▸BISSTREET TREE SIGNOFF1
02/22/2023321502414Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/25/2019321502414Open ↗
06/22/2017321502414Open ↗
03/03/2017321502414Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/29/2023321502414Open ↗
07/22/2019321502414Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/29/2023321502414Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/29/2023321502414Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/29/2023321502414Open ↗
▸BISELECTRIC MOTORS1
11/29/2023321502414Open ↗
▸BIS* HVAC INSULATION AND SEALING1
11/29/2023321502414Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/29/2023321502414Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY9
12/10/2020340681541Open ↗
07/01/2020340681541Open ↗
07/22/2019321502414Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/19/2020321502414Open ↗
09/25/2019321502414Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
07/03/2019321502414Open ↗
06/30/2017321502414Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
11/29/2023321502414Open ↗
08/24/2023340681541Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/29/2023321502414Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/29/2023321502414Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/29/2023321502414Open ↗
▸BISMASONRY1
11/29/2023321502414Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
06/30/2017321502414Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/29/2023321502414Open ↗
▸BISHYDRO FLOW TEST LETTER1
07/01/2020340681541Open ↗
▸BISSOIL REPORT1
07/03/2019321502414Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE9
09/28/2023321502414Open ↗
06/13/2023321502414Open ↗
07/09/2019321502414Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/12/2023321502414Open ↗
09/25/2019321502414Open ↗
03/22/2017321498376Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/02/2017321498376Open ↗
▸BISLANDMARKS APPROVAL1
06/02/2017321498376Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE4
07/29/2022321502414Open ↗
09/25/2019321502414Open ↗
08/23/2017321498376Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT1
03/03/2017321502414Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/21/2023340681541Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION19
12/18/2023321502414Open ↗
10/13/2023321502414Open ↗
07/05/2023321502414Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET6
09/22/2023322116063Open ↗
12/06/2018321502414Open ↗
03/13/2018321502414Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
07/29/2022321502414Open ↗
04/23/2019340508356Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/10/2019340681541Open ↗
04/05/2019340670018Open ↗
▸Other Documents10
▸BISPLOT DIAGRAM4
07/22/2019321502414Open ↗
07/15/2019321502414Open ↗
06/22/2017321502414Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
11/19/2019321502414Open ↗
11/19/2019321502414Open ↗
11/19/2019321502414Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/29/2020340670018Open ↗
▸BISUNDERPINNING (2014)1
11/29/2023321502414Open ↗
▸BISVESTIBULES1
11/29/2023321502414Open ↗