0 Active ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTemporary pipe scaffolding installation2 filings
Floor 7Well Bull Realty LLC1 filing · 7 docs
Floor 6Interior renovation of doctor's office6p · 1 filing · 8 docs
Floor 5Interior renovation of medical office1p · 1 filing · 12 docs
Floor 41 filing · 8 docs
Floor 3Interior renovation, 3rd floor7p · 1 filing · 9 docs
Floor 2Sunny Friendly Medical PC.3p · 1 filing · 4 docs
Floor 1Sidewalk shed installation1 filing · 2 docs
Site & exteriorHope And Happy, LLC1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
53 St United1603/21/2026
H & H MSG1103/22/2026
Well Bull Realty1004/09/2026
T J 8 Ave904/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/25/2016$1.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Consolidated Scaffold Bridge1803/21/2026
Fang Architect403/21/2026
Build Team803/21/2026
Eurocelt Expediting203/21/2026
Meiyun Chen103/21/2026
Building203/21/2026
HTX Building Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consolidated ScaffoldingScaffold1307/08/2026
Expert Fire SprinklerFire Protection607/08/2026
Plumbing NYCPlumbing307/08/2026
Zaq ConstructionGeneral Contractor307/08/2026
Thomas F. Cash & SonsPlumbing207/08/2026
H Interior Design ConstructionGeneral Contractor203/21/2026
New York H&Y ConstructionScaffold207/08/2026
HP ServicesPlumbing207/08/2026
S & L PlumbingPlumbing203/22/2026
Eric & NG ElectricalElectrical103/22/2026
Tuxedo Electrical ContractingElectrical103/22/2026
Chang Hwa TanElectrical103/21/2026
MPS Plumbing & HeatingFire Protection107/08/2026
MPS Plumbing & HeatingPlumbing107/08/2026
TX ConstructionsGeneral Contractor104/09/2026
Turnkey 88 ContractingGeneral Contractor107/08/2026
Glory R ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244404/27/2026
Fang Architect5513302/20/2026
Building Consulting Engineering1034108/25/2025
Hsu & Associates8025104/11/2025
Allen Shinfeld, P.E1305210/23/2024
Steven Kuo4979206/04/2024
Yan Gao6619203/28/2024
Syed Engineering7054309/07/2021
Building Lifecycle
All (228)Filed (26)Permit Issued (27)Signed Off (15)Violation (23)Inspection (29)Objection (78)Special Inspection (30)
05/14/2026
Signed off — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 6TH FL CF#12 (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01109372-I1
05/07/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/27/2026
Filed — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 6TH FL CF#12 (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01109372-P1
04/21/2026
Signed off — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 6TH FL CF#12 (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01109372-S1
04/16/2026
Signed off — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-S1
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Signed off — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-I1
04/07/2026
Permit issued — Sprinklers
B01109372-S1-EW-SP
04/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/06/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/02/2026
Special inspection requirement — Lighting controls
DEZHANG FANG
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
04/02/2026
Special inspection requirement — Interior lighting power
DEZHANG FANG
03/04/2026
Objection resolved — Addressed
03/02/2026
Objection raised — Other
02/20/2026
Filed — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-P1
02/19/2026
Special inspection requirement — Lighting controls
DEZHANG FANG
02/19/2026
Special inspection requirement — Interior lighting power
DEZHANG FANG
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
02/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/02/2026
Permit issued — General Construction
B01304011-I1-GC
01/02/2026
Permit issued — Plumbing
B01304011-S1-PL
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/04/2025
Signed off — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 3RD FL (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01061490-S1
11/24/2025
Signed off — Alteration
PLUMBING & SPRINKLER WORK FOR A MEDICAL OFFICE RENOVATION ON 7TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01025935-I1
11/24/2025
Signed off — Alteration
PLUMBING & SPRINKLER WORK FOR A MEDICAL OFFICE RENOVATION ON 7TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01025935-S1
11/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Accessibility
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Accessibility
11/12/2025
Objection raised — Cost
10/28/2025
Filed — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-S1
10/28/2025
Filed — Alteration
FILED PLUMBING WORK FOR MEDICAL OFFICE RENOVATION ON 5TH FLOOR. NO CHANGE TO EXIST'G USE, EGRESS OR OCCUPANCY.
B01304011-I1
10/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/02/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/02/2025
Permit issued — Sprinklers
B01109372-S1-EW-SP
08/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/28/2025
Permit issued — Plumbing
B01109372-S1-PL
08/25/2025
Filed — Alteration
RENOVATE EX. AMBULATORY TREATMENT & DIAGNOSTIC HEALTHCARE FACILITY ON 6TH FL CF#12 (O.G:B, U.G:4A). NEW PARTITION, FLOORING, CEILING, COSMETIC & MECHANICAL WORK AS PER PLAN. PL & SP WORK TO BE FILE SUBSEQUENCE FILING.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01109372-S1
08/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/12/2025
Permit issued — Plumbing
B01061490-S1-EW-SP
Latest 60 of 228 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offExpert Fire Sprinkler04/07/2026
DOB NOWGeneral ConstructionSigned-offGlory R Construction01/02/2026
DOB NOWPlumbingSigned-offPlumbing Works NYC01/02/2026
DOB NOWSprinklersSigned-offExpert Fire Sprinkler09/02/2025
DOB NOWPlumbingSigned-offThomas F. Cash & Sons08/28/2025
DOB NOWSprinklersSigned-offExpert Fire Sprinkler08/12/2025
DOB NOWSprinklersSigned-offExpert Fire Sprinkler08/12/2025
DOB NOWMechanical SystemsSigned-offZaq Construction12/06/2024
DOB NOWPlumbingSigned-offMPS Plumbing & Heating11/01/2024
DOB NOWSprinklersSigned-offMPS Plumbing & Heating11/01/2024
DOB NOWMechanical SystemsSigned-offH Interior Design Construction10/31/2024
DOB NOWSprinklersSigned-offExpert Fire Sprinkler08/09/2024
DOB NOWSprinklersSigned-offExpert Fire Sprinkler08/05/2024
DOB NOWPlumbingSigned-offHP Services07/25/2024
DOB NOWPlumbingSigned-offHP Services07/15/2024
DOB NOWGeneral ConstructionSigned-offTX Constructions07/09/2024
DOB NOWMechanical SystemsSigned-offZaq Construction07/05/2024
DOB NOWGeneral ConstructionSigned-offTurnkey 88 Contracting03/21/2024
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding05/04/2022
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding03/14/2022
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding05/04/2021
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding02/12/2021
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding07/16/2020
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding05/08/2020
DOB NOWConstruction FenceSigned-offNew York H&Y Construction11/13/2019
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding05/17/2019
DOB NOWConstruction FenceSigned-offNew York H&Y Construction06/15/2018
BIS—ISSUEDNew York H&Y Construction08/07/2023
BISPLISSUEDPlumbing NYC06/07/2023
BISSPISSUEDPlumbing NYC06/07/2023
BIS—ISSUEDNew York H&Y Construction07/26/2022
BIS—ISSUEDNew York H&Y Construction07/26/2022
BISEQISSUEDNew York H&Y Construction06/29/2022
BIS—ISSUEDNew York H&Y Construction06/29/2022
BISPLISSUEDPlumbing NYC02/16/2022
BISSPISSUEDPlumbing NYC02/16/2022
BISEQISSUEDNew York H&Y Construction08/06/2021
BIS—ISSUEDNew York H&Y Construction08/06/2021
BIS—ISSUEDNew York H&Y Construction06/30/2021
BISPLISSUEDPlumbing NYC03/12/2021
+ 12 more permits on file
1 project · most recent 04/27/2026
FiledStatusContractorScope
04/27/2026Signed-offExpert Fire Sprinkler7 heads
1 project · most recent 04/27/2026
Water/Sanitary
FiledStatusContractorScope
04/27/2026Signed-offThomas F. Cash & SonsWater/Sanitary
9 projects · most recent 06/22/2025
General Wiring
FiledStatusContractorScope
06/22/2025CompleteNelson & Tom Maintenance Inc DBGeneral Wiring
01/17/2025CompleteR & T ElectricalGeneral Wiring
08/29/2024CompleteR & T ElectricalGeneral Wiring
07/12/2024CompleteR & T ElectricalGeneral Wiring
05/15/2024CompleteA Electrical Main ServiceGeneral Wiring
08/18/2023CompleteEric & NG Electrical13 meters, 13 new_meters
07/31/2020CompleteTuxedo Electrical Contracting—
05/15/2019CompleteV. Vass Electric—
12/11/2018CompleteEric & NG Electrical1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
05/07/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/06/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/04/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
04/02/2026Lighting controlsDEZHANG FANGenergy_progress
04/02/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
04/02/2026Fire-Resistance Rated ConstructionDEZHANG FANGprogress
04/02/2026Energy Code Compliance InspectionsDEZHANG FANGprogress
04/02/2026Interior lighting powerDEZHANG FANGenergy_progress
02/19/2026Lighting controlsDEZHANG FANGenergy_progress
02/19/2026Interior lighting powerDEZHANG FANGenergy_progress
02/19/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/19/2026Energy Code Compliance InspectionsDEZHANG FANGprogress
02/19/2026Fire-Resistance Rated ConstructionDEZHANG FANGprogress
04/10/2025Fire-Resistant Penetrations and JointsChih Hsuspecial
04/10/2025Mechanical SystemsChih Hsuspecial
04/10/2025Interior lighting powerChih Hsuenergy_progress
04/10/2025FinalChih Hsuprogress
04/10/2025Energy Code Compliance InspectionsChih Hsuprogress
09/10/2024Sprinkler SystemsTONY ONYEAGOROspecial
06/10/2024FinalSTEVEN KUOprogress
06/10/2024Fire-Resistant Penetrations and JointsSTEVEN KUOspecial
06/04/2024Fire-Resistant Penetrations and JointsSTEVEN KUOspecial
06/04/2024FinalSTEVEN KUOprogress
03/26/2024Maintenance informationYAN GAOenergy_progress
03/26/2024HVAC-R and service water heating system controlsYAN GAOenergy_progress
03/26/2024Lighting controlsYAN GAOenergy_progress
03/26/2024Interior lighting powerYAN GAOenergy_progress
03/26/2024Mechanical SystemsYAN GAOspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Sunny Friendly Medical PCMedical / HealthcareFloor 2
Project B01127405 Alteration · LOC Issued · 10/21/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 269 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch16
09/03/2026B00053167-I1Request digital key ↗
08/25/2026B01025935-S1Request digital key ↗
08/25/2026B01025935-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold9
09/02/2026B00362741-P1Request digital key ↗
09/02/2026B00362741-I1Request digital key ↗
09/01/2026B00456812-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00168017-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION24
10/16/2023322116063Open ↗
09/28/2023321502414Open ↗
09/22/2023322116063Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION14
07/29/2022321502414Open ↗
12/10/2020340681541Open ↗
10/27/2020321502414Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/13/2022321502414Open ↗
09/28/2022321502414Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/30/2023321502414Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/03/2019321502414Open ↗
▸BISVERIFY TAX LOT1
10/30/2023321502414Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/22/2019321502414Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/30/2023321502414Open ↗
▸BISZONING DIAGRAM1
07/22/2019321502414Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/03/2019321502414Open ↗
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/03/2026B00053167-I1Open ↗
09/02/2026B00168017-I1Open ↗
09/01/2026B00456812-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
09/25/2019321502414Open ↗
09/25/2019321502414Open ↗
09/16/2019321502414Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026B01022655-I1Open ↗
08/27/2026B01304011-P1Open ↗
08/27/2026B01304011-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
10/03/2026B00456812-I1Open ↗
09/04/2026B00456812-P2Open ↗
08/31/2026B01022655-I1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/10/2019340681541Open ↗
04/05/2019340670018Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING5
07/19/2019321502414Open ↗
06/26/2019321502414Open ↗
06/25/2019321502414Open ↗
Showing 3 of 5 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD21
06/02/2017321498376Open ↗
▸BISELECTRIC CUT-OFF1
06/02/2017321498376Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
10/30/2023321502414Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/03/2017321502414Open ↗
▸BISSPRINKLER SYSTEMS1
08/24/2023340681541Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
11/02/2023321502414Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
10/29/2020340670018Open ↗
07/03/2019321502414Open ↗
03/03/2017321502414Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/02/2017321498376Open ↗
06/02/2017321498376Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
09/25/2019321502414Open ↗
09/13/2019340670018Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/05/2020340670018Open ↗
▸BISSTREET TREE SIGNOFF1
02/22/2023321502414Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/25/2019321502414Open ↗
06/22/2017321502414Open ↗
03/03/2017321502414Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/29/2023321502414Open ↗
07/22/2019321502414Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/29/2023321502414Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/29/2023321502414Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/29/2023321502414Open ↗
▸BISELECTRIC MOTORS1
11/29/2023321502414Open ↗
▸BIS* HVAC INSULATION AND SEALING1
11/29/2023321502414Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/29/2023321502414Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY9
12/10/2020340681541Open ↗
07/01/2020340681541Open ↗
07/22/2019321502414Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/19/2020321502414Open ↗
09/25/2019321502414Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
07/03/2019321502414Open ↗
06/30/2017321502414Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
11/29/2023321502414Open ↗
08/24/2023340681541Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/29/2023321502414Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/29/2023321502414Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/29/2023321502414Open ↗
▸BISMASONRY1
11/29/2023321502414Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
06/30/2017321502414Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/29/2023321502414Open ↗
▸BISHYDRO FLOW TEST LETTER1
07/01/2020340681541Open ↗
▸BISSOIL REPORT1
07/03/2019321502414Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE9
09/28/2023321502414Open ↗
06/13/2023321502414Open ↗
07/09/2019321502414Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/12/2023321502414Open ↗
09/25/2019321502414Open ↗
03/22/2017321498376Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/02/2017321498376Open ↗
▸BISLANDMARKS APPROVAL1
06/02/2017321498376Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE4
07/29/2022321502414Open ↗
09/25/2019321502414Open ↗
08/23/2017321498376Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT1
03/03/2017321502414Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/21/2023340681541Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION19
12/18/2023321502414Open ↗
10/13/2023321502414Open ↗
07/05/2023321502414Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET6
09/22/2023322116063Open ↗
12/06/2018321502414Open ↗
03/13/2018321502414Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
07/29/2022321502414Open ↗
04/23/2019340508356Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/10/2019340681541Open ↗
04/05/2019340670018Open ↗
▸Other Documents10
▸BISPLOT DIAGRAM4
07/22/2019321502414Open ↗
07/15/2019321502414Open ↗
06/22/2017321502414Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
11/19/2019321502414Open ↗
11/19/2019321502414Open ↗
11/19/2019321502414Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/29/2020340670018Open ↗
▸BISUNDERPINNING (2014)1
11/29/2023321502414Open ↗
▸BISVESTIBULES1
11/29/2023321502414Open ↗