ECB09/08/2005WORK WITHOUT A PERMIT WORK NOTED AT REAR OF PREMISES ERECTED A CMU BLOCK STRUCTURE STRUCTURE APPROX 20'-0 18'-0 9'-0 HIGH ROOF FRAMING 2'X 6WOOD BEAMS (JOIST)RIDGE 2"X 10" 2"X6" PLATE STRUCTURE APPROX 60% COMPL$-250 due
Two family converted from one family · 2,000 sf lot · 0.62 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.