DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB05/30/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB01/03/2008V-DOB VIOLATION - ACTIVE
ECB04/13/201050A,51. FULTON V.T. BOILER, 10 HP, NB42340, GAS - RD, 1983. 50A- UPPERAND LOWER HANDHOLE PORT SLEEVES DETERIORATED. EXCESSIVE FURNACE CEMENTOVERLAY AT OPENINGS. REMOVE CEMENT AND INSTALL METAL SLEEVES ATNothing owed — awaiting certificate of correction
ECB02/13/200750(A) 50(B) 50(C) 50(D) FULTON V.T. BOILER, 10HP NB42340, OIL, 1983 50(A) INCORRECT DRAFT ELEMENT INSTALLED IN THE FLUE PIPE. INSTALL A MOFULATING DRAFT STAT. ASSEMBLY 50(B) NO SECONDARY DRAIN VALVE ON THE BLOWNothing owed — awaiting certificate of correction
ECB12/02/2000RESIDENCE ALTERED FOR OCCUAPNCY AS A DWELLING FOR MORE THAN THE LEGALLY APRPOVED #OF FAM.C OF O #186278 WHICH INDICATES RESIDENCE LEGALLY APRPOVED FOR TWO STORES.RESIDENCE NOW ALTERECD FOR OCUCPANCY BY ONE STORNothing owed — awaiting certificate of correction