← Back
Two family converted from one family
85-10 113 STREET
QUEENS · Richmond Hill · BIN 4192467
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R2Zoning
2,758 sfGross Floor Area
2Units
Two family converted from one family · 6,500 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR208/19/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281208/19/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
10/30/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 12 Panels, 4.92 kW
Q01138156-I1
08/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
08/20/2025
Special inspection requirement — Final
Mina Makar
08/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
08/20/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
08/19/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 12 Panels, 4.92 kW
Q01138156-P1
11/14/2024
Permit issued — Solar
Q01138156-I1-SL
11/12/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 12 Panels, 4.92 kW
Q01138156-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR11/14/2024
2 projects · most recent 11/06/2024
FiledStatusContractorScope
11/06/2024CompleteISLAND ELECTRIC CORP—
04/30/2020Permit IssuedTRIANGLE ELECTRIC INC.1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/20/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
08/20/2025Fire-Resistant Penetrations and JointsMina Makarspecial
08/20/2025FinalMina Makarprogress
08/20/2025Energy Code Compliance InspectionsMina Makarprogress
08/20/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 4 on file (BIS + DOB NOW)
▸Seals & Professional Certifications3
▸DOB NOWProgress Inspector Seal & Signature2
09/30/2026Q01138156-I1Open ↗
09/30/2026Q01138156-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/30/2026Q01138156-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01138156-I1Open ↗