← Back
Two stories - detached, small or mid-size
85-32 98 STREET
QUEENS · Woodhaven · BIN 4182637
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
1,392 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 1,530 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/09/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/03/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00983895-I1
01/17/2024
Permit issued — Solar
Q00983895-I1-SL
01/09/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00983895-I1
12/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/31/2023
Special inspection requirement — Final
Walid Abdulla
12/31/2023
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/17/2024
1 project · most recent 01/18/2024
FiledStatusContractorScope
01/18/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/31/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/31/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/31/2023Energy Code Compliance InspectionsWalid Abdullaprogress
12/31/2023FinalWalid Abdullaprogress
12/31/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q00983895-I1Open ↗
08/28/2026Q00983895-I1Open ↗
08/28/2026Q00983895-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00983895-I1Open ↗
08/28/2026Q00983895-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00983895-I1Open ↗