LL97 Covered1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 42,911 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Permit Issued — active, not yet Signed-off
Roof35p · 2 filings · 20 docs
Floor 4Under Construction55p · 2 filings · 20 docs
Floor 3Under Construction60p · 2 filings · 20 docs
Floor 230p · 1 filing · 20 docs
Floor 1Under Construction59p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION209/13/2026
NYC SCHOOL CONSTRUCTION AUTHORITY4607/25/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPT OF EDUCATION PS 097203/22/2026
DOE P.S. 97103/22/2026
DEPARTMENT OF EDUCATION103/22/2026
DEPT OF EDUCATION P.S.97203/22/2026
P.S. 97 D.O.E.1103/22/2026
PS 97 DOE 04203/22/2026
BOARD OF EDUCATION 040103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KOYSMAN ENGINEERING PLLC108/07/2026
AECOM202/17/2026
INFINITY DESIGN CONSULTANT INC405/13/2023
AECOM USA, INC.604/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AECOM USA, INC.403/21/2026
JAM CONSULTANTS, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LITEHOUSE BUILDERS INCGeneral Contractor2907/08/2026
LAMBO MECHANICAL INCGeneral Contractor907/25/2026
SEGA CONTRACTING CORPGeneral Contractor807/08/2026
MAR-SAL PLBG & HTG, INCPlumbing207/08/2026
ROBERT PARCHMENT P&H.INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400802/17/2026
Building Lifecycle
All (168)Filed (14)Permit Issued (33)Signed Off (1)Violation (60)Inspection (10)Objection (20)Special Inspection (30)
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/07/2026
Filed — Alteration
Playground Redevelopment Remove & replace asphalt & concrete pavement. Remove: play equip. safety surfacing & synthetic turf. w/ underdrainage. Provide new: synthetic turf w/ underdrain steps, ramp w/ railings, precast seating, play equip., fence & gate.
Q01432087-S2
08/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/24/2026
Permit issued — Mechanical Systems
Q00670367-I1-MS
07/21/2026
Filed — Alteration
Playground Redevelopment Remove & replace asphalt & concrete pavement. Remove: play equip. safety surfacing & synthetic turf. w/ underdrainage. Provide new: synthetic turf w/ underdrain steps, ramp w/ railings, precast seating, play equip., fence & gate.
Q01432087-I1
07/16/2026
Special inspection requirement — Final
06/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2026
Permit issued — Plumbing
Q00670367-S1-PL
06/04/2026
Permit issued — Mechanical Systems
Q00670367-I1-GC
05/27/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/04/2026
Objection resolved — Addressed
04/08/2026
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE (CLF) TO PROTECT PUBLIC FROM ENTERING CONSTRUCTION SITE
Q08026014-I1
03/24/2026
Violation issued (FDNY_NOV, closed)
03/02/2026
Permit issued — Mechanical Systems
Q00670367-I1-MS
03/02/2026
Violation issued (ECB, open)
Construction
02/24/2026
Objection raised — Other
02/20/2026
Violation issued (FDNY_ORDER, closed)
02/17/2026
Filed — Alteration
OT: Interior Renovation - Removal of Doors, Walls, & Flooring and installation of new. MH: Modification of Existing Ductwork and Replacement of Thermostats. No change in Use, Occupancy, or Egress.
Q00670367-P3
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/12/2026
Violation issued (FDNY_ORDER, closed)
12/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
12/30/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
12/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
12/30/2025
Special inspection requirement — Final
NELSON LOPEZ
12/30/2025
Special inspection requirement — Interior lighting power
NELSON LOPEZ
12/30/2025
Special inspection requirement — Lighting controls
NELSON LOPEZ
12/30/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
10/02/2025
Permit issued — Mechanical Systems
Q00699534-S2-MS
10/02/2025
Permit issued — Supported Scaffold
Q08026023-I1-SF
10/02/2025
Permit issued — General Construction
Q00699534-I1-GC
10/02/2025
Permit issued — Construction Fence
Q08026014-I1-FN
10/02/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/05/2025
Permit issued — Mechanical Systems
Q00670367-I1-GC
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/18/2025
Violation issued (FDNY_ORDER, closed)
04/30/2025
Permit issued — Structural
Q00699534-I1-ST
04/09/2025
Violation issued (FDNY_NOV, closed)
04/09/2025
Violation issued (FDNY_NOV, closed)
03/19/2025
Permit issued — Plumbing
Q00699534-S1-PL
02/26/2025
Permit issued — General Construction
Q00670367-I1-MS
02/06/2025
Permit issued — General Construction
Q00670367-I1-GC
09/25/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/23/2024
Permit issued — Mechanical Systems
Q00699534-S2-MS
09/23/2024
Permit issued — Supported Scaffold
Q08026023-I1-SF
09/23/2024
Permit issued — Construction Fence
Q08026014-I1-FN
09/23/2024
Permit issued — Structural
Q00699534-I1-GC
09/04/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2024
Permit issued — Sidewalk Shed
Q08026019-I1-SH
03/13/2024
Permit issued — Plumbing
Q00699534-S1-PL
03/04/2024
Permit issued — General Construction
Q00670367-I1-MS
11/29/2023
Violation issued (FDNY_NOV, closed)
11/29/2023
Violation issued (FDNY_NOV, closed)
09/29/2023
Permit issued — General Construction
Q00699534-I1-GC
09/20/2023
Permit issued — Mechanical Systems
Q00699534-S2-MS
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLAMBO MECHANICAL INC07/24/2026
DOB NOWPlumbingPermit IssuedROBERT PARCHMENT P&H.INC06/09/2026
DOB NOWMechanical SystemsPermit IssuedSEGA CONTRACTING CORP06/04/2026
DOB NOWMechanical SystemsSigned-offLAMBO MECHANICAL03/02/2026
DOB NOWMechanical SystemsPermit IssuedLITEHOUSE BUILDERS INC10/02/2025
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC10/02/2025
DOB NOWGeneral ConstructionPermit IssuedLITEHOUSE BUILDERS INC10/02/2025
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC10/02/2025
DOB NOWMechanical SystemsPermit IssuedSEGA CONTRACTING CORP08/05/2025
DOB NOWStructuralPermit IssuedLITEHOUSE BUILDERS INC04/30/2025
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC03/19/2025
DOB NOWGeneral ConstructionSigned-offLAMBO MECHANICAL02/26/2025
DOB NOWGeneral ConstructionPermit IssuedSEGA CONTRACTING CORP02/06/2025
DOB NOWMechanical SystemsPermit IssuedLITEHOUSE BUILDERS INC09/23/2024
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC09/23/2024
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC09/23/2024
DOB NOWStructuralPermit IssuedLITEHOUSE BUILDERS INC09/23/2024
DOB NOWSidewalk ShedPermit IssuedLITEHOUSE BUILDERS INC03/25/2024
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC03/13/2024
DOB NOWGeneral ConstructionSigned-offLAMBO MECHANICAL03/04/2024
DOB NOWGeneral ConstructionPermit IssuedLITEHOUSE BUILDERS INC09/29/2023
DOB NOWMechanical SystemsPermit IssuedLITEHOUSE BUILDERS INC09/20/2023
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC09/20/2023
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC09/20/2023
DOB NOWMechanical SystemsSigned-offLAMBO MECHANICAL09/14/2023
DOB NOWGeneral ConstructionSigned-offLAMBO MECHANICAL06/06/2023
DOB NOWGeneral ConstructionPermit IssuedSEGA CONTRACTING CORP05/15/2023
DOB NOWPlumbingPermit IssuedROBERT PARCHMENT P&H.INC05/15/2023
DOB NOWMechanical SystemsPermit IssuedLITEHOUSE BUILDERS INC05/08/2023
DOB NOWStructuralPermit IssuedLITEHOUSE BUILDERS INC04/03/2023
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC03/27/2023
DOB NOWSidewalk ShedPermit IssuedLITEHOUSE BUILDERS INC03/23/2023
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC03/23/2023
BISOTISSUEDBEYS SPECIALTY, INC01/07/2021
BISOTISSUEDBEYS SPECIALTY, INC01/07/2021
BISOTISSUEDBEYS SPECIALTY, INC01/08/2020
BISOTISSUEDBEYS SPECIALTY, INC01/08/2020
BISOTISSUEDBEYS SPECIALTY, INC02/08/2019
BISOTISSUEDBEYS SPECIALTY, INC02/08/2019
BISOTISSUEDBEYS SPECIALTY, INC01/11/2018
+ 43 more permits on file
2 projects · most recent 02/17/2026
Heating Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/17/2026Signed-offLAMBO MECHANICAL INCHeating Systems, Ventilation Systems
Heating
Johnson Controls TEC3000 COLOR SERIES THERMOSTAT Radiant ×4
Ventilation
Greenheck MBD-15 BALANCING DAMPER 1,125 CFM · Ductwork ×2
05/05/2022Permit IssuedLITEHOUSE BUILDERS INCAir Conditioning Systems—
2 projects · most recent 08/07/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/07/2026——Storm
02/17/2026Permit IssuedROBERT PARCHMENT P&H.INCWater/Sanitary
9 projects · most recent 10/16/2025
General Wiring
FiledStatusContractorScope
10/16/2025CompleteGEMINI ELECTRIC CO., INC.—
05/30/2025CompleteCHARAN ELEC'L ENTERP'S IN—
06/14/2023Permit IssuedTOWER ELECTRIC INC.—
05/30/2023Permit IssuedHIGH VOLT ELEC CORP. OFGeneral Wiring
05/12/2023CompleteURBAN ELECTRICAL CORPGeneral Wiring
04/12/2023CompleteRAIDEN ELECTRIC LLC—
01/31/2023CancelledSTANCO SYSTEM ELEC'L CONT—
08/17/2021CompleteMULTI-TECH ELECTRIC, INCGeneral Wiring
11/13/2019CompleteJAMCOB ELECTRIC LLCGeneral Wiring
1 project · most recent 05/05/2022
Steel
FiledStatusContractorScope
05/05/2022Permit IssuedLITEHOUSE BUILDERS INCSteel
1 project · most recent 05/13/2023
Sidewalk Shed
FiledStatusContractorScope
05/13/2023Permit IssuedLITEHOUSE BUILDERS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2025Pass-Final PL - UndergroundPassView ↗
09/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/04/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/21/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
08/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/16/2026Final—progress
12/30/2025HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
12/30/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
12/30/2025Mechanical SystemsNELSON LOPEZspecial
12/30/2025Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
12/30/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
12/30/2025FinalNELSON LOPEZprogress
12/30/2025Interior lighting powerNELSON LOPEZenergy_progress
12/30/2025Lighting controlsNELSON LOPEZenergy_progress
12/30/2025Maintenance informationNELSON LOPEZenergy_progress
04/20/2023Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
04/20/2023Interior lighting powerNELSON LOPEZenergy_progress
04/20/2023Maintenance informationNELSON LOPEZenergy_progress
04/20/2023Lighting controlsNELSON LOPEZenergy_progress
04/20/2023HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
04/20/2023FinalNELSON LOPEZprogress
04/20/2023Energy Code Compliance InspectionsNELSON LOPEZprogress
04/20/2023Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
04/20/2023Mechanical SystemsNELSON LOPEZspecial
05/09/2022HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
05/09/2022HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
05/09/2022Duct leakage testing, insulation and designNELSON LOPEZenergy_progress
05/09/2022Post-installed AnchorsNELSON LOPEZspecial
05/09/2022Energy Code Compliance InspectionsNELSON LOPEZprogress
Latest 25 of 45.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026Q00699534-S1Request digital key ↗
08/26/2026Q00699534-S2Request digital key ↗
08/25/2026Q08026014-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026Q00699534-I1Open ↗
08/26/2026Q00699534-S1Open ↗
08/26/2026Q00699534-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026Q00670367-P1Open ↗
09/02/2026Q00670367-P1Open ↗
08/30/2026Q00670367-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q00670367-P1Open ↗
08/31/2026Q00699534-S1Open ↗
08/30/2026Q00670367-P3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026Q08026019-I1Open ↗
08/13/2026Q08026019-P1Open ↗
08/13/2026Q08026023-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/17/2026Q00670367-S1Open ↗
08/17/2026Q00670367-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026Q00670367-I1Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/26/2026Q00699534-S1Open ↗
08/26/2026Q00699534-S2Open ↗
08/25/2026Q08026023-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/16/2026Q01432087-I1Open ↗
08/16/2026Q01432087-S2Open ↗
08/13/2026Q08026014-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP Variance (V5) letter5
08/26/2026Q00699534-S1Open ↗
08/26/2026Q00699534-S2Open ↗
08/17/2026Q00670367-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026Q00670367-I1Open ↗
08/13/2026Q08026014-I1Open ↗
▸Other Documents17
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal16
08/17/2026Q00670367-I1Open ↗
08/16/2026Q01432087-I1Open ↗
08/16/2026Q01432087-S2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/13/2026Q08026014-I1Open ↗