← Back
Two family frame
85-57 150 STREET
QUEENS · Jamaica Hills-Briarwood · BIN 4208340
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
R3XZoning
2,352 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family frame · 3,600 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI105/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841105/13/2025
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
07/17/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Q01225495-I1
05/19/2025
Permit issued — Solar
Q01225495-I1-SL
05/13/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Q01225495-I1
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
05/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
05/13/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
05/13/2025
Special inspection requirement — Final
ROBERT MASONE
05/13/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
03/10/2002
Violation issued (ECB, closed)
Quality of Life
03/10/2002
Violation issued (ECB, open)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC05/19/2025
BIS—ISSUEDN.A08/19/2002
1 project · most recent 06/27/2025
FiledStatusContractorScope
06/27/2025CompleteNY SOLAR ELECTRICAL LLC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/13/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
05/13/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
05/13/2025Energy Code Compliance InspectionsROBERT MASONEprogress
05/13/2025FinalROBERT MASONEprogress
05/13/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01225495-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01225495-I1Open ↗
09/01/2026Q01225495-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01225495-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01225495-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01225495-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01225495-I1Open ↗