← Back
One family attached or semi-detached
85-58 67 ROAD
QUEENS · BIN 4074319
💬 Discuss this project
1931Year Built
2Stories
A5Building Class
R4Zoning
1,630 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
One family attached or semi-detached · 2,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof13p · 1 filing · 20 docs
Floor 220p · 2 filings · 20 docs
Floor 118p · 2 filings · 20 docs
Cellar25p · 2 filings · 20 docs
1 job · most recent 11/21/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/21/2022Permit IssuedPLBG INCGas, Water/Sanitary
1 job · most recent 08/11/2021
General Wiring
FiledStatusContractorScope
08/11/2021Permit IssuedA & S MASTER ELEC'L CORPGeneral Wiring
1 job · most recent 07/06/2021
FiledStatusContractorScope
07/06/2021Permit IssuedRECORD 13 CONSTRUCTION CO1 scope_items
1 job · most recent 05/03/2021
Fence
FiledStatusContractorScope
05/03/2021Permit IssuedRECORD 13 CONSTRUCTION COFence
Building Lifecycle
All (73)Filed (8)Permit Issued (9)Violation (11)Inspection (13)Objection (2)Special Inspection (30)
10/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/08/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
11/28/2022
Special inspection requirement — Metering
ALDO BRAVO
11/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/21/2022
Filed — Alteration
MISC. PLUMBING WORK THROUGHOUT AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00482972-P2
11/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
11/17/2022
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
11/17/2022
Special inspection requirement — Metering
ALDO BRAVO
11/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2022
Permit issued — Plumbing
Q00482972-I1-PL
10/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/02/2022
Permit issued — Mechanical Systems
Q00502380-I1-GC
06/01/2022
Violation issued (ECB, closed)
Site Safety
06/01/2022
Violation issued (ECB, closed)
Unknown
06/01/2022
Violation issued (ECB, closed)
Construction
06/01/2022
Violation issued (ECB, closed)
Construction
05/06/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/23/2022
Violation issued (ECB, closed)
Construction
12/13/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/13/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/30/2021
Objection resolved — Addressed
11/29/2021
Objection raised — Admin
11/28/2021
Filed — Alteration
MISC. PLUMBING WORK THROUGHOUT AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00482972-P1
11/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
11/28/2021
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
11/28/2021
Special inspection requirement — Metering
ALDO BRAVO
10/01/2021
Special inspection requirement — Structural Wood Frame
ROBESPIERRE ARISTILDE
10/01/2021
Special inspection requirement — Structural Steel - High Strength Bolting
ALDO BRAVO
10/01/2021
Special inspection requirement — HVAC-R and service water heating system controls
ALDO BRAVO
10/01/2021
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
10/01/2021
Special inspection requirement — Air barrier - visual inspection
ALDO BRAVO
10/01/2021
Special inspection requirement — Fenestration areas
ALDO BRAVO
10/01/2021
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
10/01/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
ALDO BRAVO
10/01/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
ALDO BRAVO
10/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
ALDO BRAVO
10/01/2021
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ALDO BRAVO
10/01/2021
Special inspection requirement — Masonry
ALDO BRAVO
10/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
10/01/2021
Special inspection requirement — Structural Steel - Details
ALDO BRAVO
10/01/2021
Special inspection requirement — Concrete - Cast-In-Place
ALDO BRAVO
10/01/2021
Special inspection requirement — Mechanical Systems
ALDO BRAVO
10/01/2021
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
10/01/2021
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
09/29/2021
Filed — Alteration
MISC. INTERIOR RENOVATION INCLUDING ENLARGEMENT TO EXIST. ONE-FAMILY RESIDENCE, NEW AC UNIT AND HEATING SYSTEM; NEW STEEL DECK AT REAR YARD AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00502380-P2
09/23/2021
Permit issued — Construction Fence
Q00514367-I1-FN
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2021
Permit issued — Structural
Q00502380-I1-GC
09/02/2021
Permit issued — Support of Excavation
Q00546847-I1-SE
08/24/2021
Permit issued — Plumbing
Q00482972-I1-PL
07/12/2021
Permit issued — Support of Excavation
Q00546847-I1-SE
07/06/2021
Filed — Alteration
HEREWITH FILING A SOE APPLICATION FOR EXCAVATION AT THE FRONT YARD TO SHOW SHORING DESIGN FOR STAIR PIT; ALSO, TO CORRECT VIOLATION # 35560377N, #35560378P. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00546847-I1
06/24/2021
Filed — Alteration
MISC. PLUMBING WORK THROUGHOUT AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00482972-I1
Latest 60 of 73 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RECORD 13 CONSTRUCTION CO403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/29/2021$726K—— → —$445/sf building
09/18/2020$640K—— → —$393/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGE ENGINEERING, LLC811/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCOMETRIC DESIGN1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RECORD 13 CONSTRUCTION COGeneral Contractor807/08/2026
GREYLINE CONSTRUCTION CORGeneral Contractor507/08/2026
PLBG P & H INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT4081711/21/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLBG P & H INC10/07/2022
DOB NOWMechanical SystemsPermit IssuedRECORD 13 CONSTRUCTION CO09/02/2022
DOB NOWConstruction FencePermit IssuedRECORD 13 CONSTRUCTION CO09/23/2021
DOB NOWStructuralPermit IssuedRECORD 13 CONSTRUCTION CO09/03/2021
DOB NOWSupport of ExcavationPermit IssuedRECORD 13 CONSTRUCTION CO09/02/2021
DOB NOWPlumbingPermit IssuedPLBG P & H INC08/24/2021
DOB NOWSupport of ExcavationPermit IssuedGREYLINE CONSTRUCTION COR07/12/2021
DOB NOWConstruction FencePermit IssuedGREYLINE CONSTRUCTION COR05/10/2021
DOB NOWMechanical SystemsPermit IssuedGREYLINE CONSTRUCTION COR05/10/2021
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
10/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/08/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
11/28/2022Fire-Resistant Penetrations and JointsALDO BRAVOspecial
11/28/2022Energy Code Compliance InspectionsALDO BRAVOprogress
11/28/2022MeteringALDO BRAVOenergy_progress
11/17/2022Fire-Resistant Penetrations and JointsALDO BRAVOspecial
11/17/2022Energy Code Compliance InspectionsALDO BRAVOprogress
11/17/2022MeteringALDO BRAVOenergy_progress
11/28/2021Fire-Resistant Penetrations and JointsALDO BRAVOspecial
11/28/2021Energy Code Compliance InspectionsALDO BRAVOprogress
11/28/2021MeteringALDO BRAVOenergy_progress
10/01/2021Structural Wood FrameROBESPIERRE ARISTILDEprogress
10/01/2021Structural Steel - High Strength BoltingALDO BRAVOspecial
10/01/2021HVAC-R and service water heating system controlsALDO BRAVOenergy_progress
10/01/2021Lighting in dwelling unitsALDO BRAVOenergy_progress
10/01/2021Air barrier - visual inspectionALDO BRAVOenergy_progress
10/01/2021Fenestration areasALDO BRAVOenergy_progress
10/01/2021Insulation placement and R valuesALDO BRAVOenergy_progress
10/01/2021HVAC-R and service water piping design and insulationALDO BRAVOenergy_progress
10/01/2021Fenestration and door U-factor and product ratingsALDO BRAVOenergy_progress
10/01/2021HVAC-R and service water heating equipmentALDO BRAVOenergy_progress
10/01/2021Exterior Insulation and Finish Systems (EIFS)ALDO BRAVOspecial
10/01/2021MasonryALDO BRAVOspecial
10/01/2021Fire-Resistant Penetrations and JointsALDO BRAVOspecial
10/01/2021Structural Steel - DetailsALDO BRAVOspecial
10/01/2021Concrete - Cast-In-PlaceALDO BRAVOspecial
10/01/2021Mechanical SystemsALDO BRAVOspecial
Latest 25 of 45.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00514367-I1Request digital key ↗
08/27/2026Q00546847-I1Request digital key ↗
08/27/2026Q00502380-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 16
08/27/2026Q00502380-P1Open ↗
08/27/2026Q00502380-I1Open ↗
08/13/2026Q00482972-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/27/2026Q00502380-P1Open ↗
08/27/2026Q00502380-I1Open ↗
08/13/2026Q00502380-P2Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature25
09/28/2026Q00502380-I1Open ↗
09/28/2026Q00502380-I1Open ↗
09/28/2026Q00502380-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/28/2026Q00502380-I1Open ↗
09/28/2026Q00502380-I1Open ↗
09/28/2026Q00502380-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00514367-I1Open ↗
08/27/2026Q00546847-I1Open ↗
08/27/2026Q00502380-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00502380-P1Open ↗
08/27/2026Q00502380-I1Open ↗
08/27/2026Q00482972-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00482972-I1Open ↗
▸Other Documents7
▸DOB NOWPlot Diagram3
08/27/2026Q00502380-P1Open ↗
08/27/2026Q00502380-I1Open ↗
08/13/2026Q00502380-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/27/2026Q00502380-P1Open ↗
08/27/2026Q00502380-I1Open ↗
08/13/2026Q00502380-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00546847-I1Open ↗