← Back
Two stories - detached, small or mid-size
85-96 PALERMO STREET
QUEENS · Jamaica Estates-Holliswood · BIN 4223808
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R1-2Zoning
2,180 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 11,609 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC102/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272102/25/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
11/05/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01184698-I1
02/28/2025
Permit issued — Solar
Q01184698-I1-SL
02/25/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01184698-I1
02/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
02/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
02/21/2025
Special inspection requirement — Final
Walid Abdulla
02/21/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/15/2003
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/28/2025
1 project · most recent 02/25/2025
FiledStatusContractorScope
02/25/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/21/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/21/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/21/2025Energy Code Compliance InspectionsWalid Abdullaprogress
02/21/2025FinalWalid Abdullaprogress
02/21/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01184698-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01184698-I1Open ↗
08/23/2026Q01184698-I1Open ↗
08/23/2026Q01184698-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01184698-I1Open ↗
08/23/2026Q01184698-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01184698-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01184698-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01184698-I1Open ↗