HPD07/17/2026§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES AND ITS COMPONENTS AT BUILDING FRONT AT FIRE ESCAPE
DOB01/12/2026FAILURE TO MAINTAIN.DETERIORATED MORTAR JOINTS & MISSING BRICKS NOTED@ CHIMNEY @ REAR CRACKED & BULGING OF BRICK WALLS NOTED @REAR &EAST WALL PARAPET OF EAST WALL LEANING.OWNER TO ENGAGE PE & CONTRACTOR TO EVALUATE EXTERIOR WALLS @ REPAIR UNDER PRMT.OBTAIN PERMT BY 2/1/26 CMPLT WRK BY 3/1/26
ECB12/31/2025EXPOSURE 3 AT CHIMNEY STACK LOCATED AT 6TH STORY ROOF LEVEL EXHIBITS LOOSE BRICK AND CRACKING AT CHIMNEY STOCK INCLUDING MASONARY COPING, ALSO SECTIONS THROUGHOUT STONES. EXPOSURE 4 AT 6TH STORY FACADE(ROOF LEV$2K due
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
HPD01/31/2024HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD12/08/2023HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD12/08/2023§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SHOWER IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD12/08/2023HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
HPD10/23/2019HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE 2nd ENTIRE APARTMENT FROM NORTH LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD08/05/2019HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB05/14/20145/14/14: 6TH FLOOR CENTER PIER, FRONT FACADE, FAILED. EMERGENCY VACATEOF BLDG. & CLOSURE OF CHRISTOPHER ST. REMEDY: IMMEDIATELYHIRE NYS PE & CONTRACTOR, STABILIZE FAILED PIER BRICKWORK,INSTALLSHED & PIPE SCAFFOLD. FILE & PERMIT ALL WORK BY COB 5/23/14. WORK SHOULD START IMMEDIATELY. SHORING/STABILIZATION COMPLETE BY 5/20/14
DOB01/15/2014FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/26/2008V-DOB VIOLATION - ACTIVE
DOB08/27/2004V-DOB VIOLATION - ACTIVE
DOB11/01/2001V-DOB VIOLATION - ACTIVE
DOB01/31/2001V-DOB VIOLATION - ACTIVE
DOB09/20/2000V-DOB VIOLATION - ACTIVE
DOB09/11/2000V-DOB VIOLATION - ACTIVE
HPD11/30/1995§ 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 1 STY STORE EXTENDED INTO REAR EAST APT.
DOB12/23/1987V-DOB VIOLATION - ACTIVE
ECB06/25/2026ATOI, OBSERVED PREMISES ADDRESS HAS ACTIVE PERMIT THAT ARE NOT POSTED ANYWHERE ON PREMISES IN A CONSPICUOUS PLACE OR FOR PUBLIC VIEWING. PERMIT # M00129746-I1-EL, EXPIRING 05/20/2027, IS NOT POSTED. ACTIVE PERMHearing held — result not yet published$300 proposed
ECB06/25/2026ATOI, OBSERVED PREMISES ADDRESS HAS ACTIVE PERMIT THAT ARE NOT POSTED ANYWHERE ON PREMISES IN A CONSPICUOUS PLACE OR FOR PUBLIC VIEWING. PERMIT #M01344074-I1-EL, EXPIRING 09/23/2026, IS NOT POSTED. ACTIVE PERMIHearing held — result not yet published$300 proposed
ECB06/25/2026ATOI, OBSERVED AC SPLIT UNIT WITH DISCONNECT BOX AT REAR OF PREMISES, ALONG EXP. 4 / 3 (REAR AREA), AT FIRST FLOOR LEVEL. THERE ARE NO PERMITS OR FILINGS AS PER DOB RECORDS., OBTAIN PERMITHearing held — result not yet published$1K proposed
ECB06/25/2026ATOI, OBSERVED PREMISES ADDRESS HAS ACTIVE PERMIT THAT ARE NOT POSTED ANYWHERE ON PREMISES IN A CONSPICUOUS PLACE OR FOR PUBLIC VIEWING. PERMIT # M01343382-I1-SH, EXPIRING 06/28/2026, IS NOT POSTED. ACTIVE PERMHearing held — result not yet published$300 proposed
ECB03/05/2026OBSERVED VERTICAL AND HORIZONTAL CRACKING AT EXPOSURE 3 ALONG THE FACADE EXTENDING THROUGH MULTIPLE STORIES, AND ADDITIONAL CRACKING AT THE PARAPET WALL AT EXPOSURE 4. THIS CONDITION INDICATES EXTERIOR WALL DETNothing owed — awaiting certificate of correction
ECB10/05/2020FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER I OBSERVED IN APARTMENT 3A SINK IN BATHROOM WAS NOT INSTALLED TO CODE WASTE LINE GOING BACK TO STACK IS REDUCED. SINK NOT VENTED USED JIM CAP ON WASTE LINE,Nothing owed — awaiting certificate of correction
ECB10/05/2020WORK WITHOUT A PERMIT I OBSERVED IN APARTMENT 3A SINK WAS INSTALLED IN BATHROOM ALSO IN THE KITCHEN AREA A SINK WAS INSTALLED WITH NEW WASTE AND WATER VALVES., OBTAIN ALL PERMITSNothing owed — awaiting certificate of correction
ECB09/13/2019PREMISES 6-STORY AND BULKHEAD ABOVE ROOF LEVEL. OBSERVED ENTIRE ROOF BULK APPROX. SIZED 12'-0" X 5'-0"X 6'-0" SLIGHTLY LEANING TOWARD LEFT TO RIGHT. ALSO OBSERVED 2-WINDOWS WITH FRAME & DOOR IN BULKHEAD BROKEN,Nothing owed — awaiting certificate of correction
ECB05/09/2013FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.DEFECTS NOTED:AT TIME OF INSPECTION FLOORS IN APARTMENTS 3B,3D AND 6D ARE LEANING OUT OF PLUMB.APARTMENT 6D HAS PROBLEMS W/ELECTRICAL OUTLETS.WINDOW IN APNothing owed — awaiting certificate of correction
ECB03/07/2013FAILURE TO MAINTAIN BUILDING WALL OR APPURTENANCES.NOTED: MAJOR BULGING OF THE BRICK FACADE AT THE 5TH FL. BRICK WORK PUSHED OUTWARDS APPROX3"X4" AT AREA BETWEEN THE TWO FIRE ESCAPE WINDOWS. BRICK IN DANGER OFNothing owed — awaiting certificate of correction
ECB11/23/2007B4A,16,32A,34B,48A,B,50,50A,B,C,D.50-BACKFLOW PREVENTOR NOT PIPED DOWN.50A-BOTH,BOTH BOILER ROOM LIGHTS DEFECTIVE.50B-DEBRIS IN BOILER ROOM.50C-HOLE IN FRONT WALL OF BOILER ROOM.50D-BOILER FLUE SUPPORTED W/BANDNothing owed — awaiting certificate of correction