City university
Structural Biology Center
85 CONVENT AVENUE · BIN 1084068
💬 Discuss this project
1930Year Built
5Stories
W5Building Class
R7-2Zoning
400,160 sfGross Floor Area
1Units
LL97 Covered5 Open Violations 0 unresolved · 5 paperwork only ▸FDNY Report ↗
City university · 477,375 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof27p · 1 filing · 20 docs
Floor 24p · 1 filing · 7 docs
Floor 13p · 1 filing · 7 docs
Cellar3p · 1 filing · 20 docs
Sub-CellarUnder Construction12p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
Sub-Basement22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK STRUCTURAL BIOLOGY CENTER3509/13/2026
NYSBC704/09/2026
NYCSCA303/21/2026
DASNY103/21/2026
DORMITORY AUTHORITY OF NY103/21/2026
DORMITORY AUTHORITY203/21/2026
CUNY603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2603/21/2026
RPO203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H.M. HUGHES CO. INCGeneral Contractor908/25/2026
SAFWAY ATLANTIC, LLCGeneral Contractor707/08/2026
FRESH MEADOW MECHANICAL CGeneral Contractor404/09/2026
NICHOLAS PIMPINELLAElectrical403/21/2026
MICHAEL LIPARIElectrical103/21/2026
ALLAN BRITEWAY ELECTRICALElectrical103/22/2026
SMITH, STEPHENElectrical103/21/2026
MATRIX MECHANICAL CORPGeneral Contractor107/08/2026
NOTO, CHARLESElectrical103/21/2026
BETANCOURT, JOHNElectrical103/21/2026
JEWNANDAN, RAJESHElectrical103/21/2026
LIPARI, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYTESTING CIVIL LLC8448206/16/2026
SKYTESTING SERVICES INC3707305/11/2026
ALAN MARGOLIN & ASSOC423408/01/2025
LANGAN ENG, ENV, SURVEYIN1265107/22/2025
Building Lifecycle
All (142)Filed (20)Permit Issued (16)Signed Off (4)Violation (58)Objection (14)Special Inspection (30)
08/26/2026
Special inspection requirement — Mechanical Systems
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Heating Systems
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Final
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Maintenance information
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Metering
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Interior lighting power
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Lighting controls
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Shutoff dampers
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — Exterior lighting power
ROBERT KARPOWICZ
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT KARPOWICZ
08/24/2026
Permit issued — General Construction
M01242606-S1-GC
08/21/2026
Permit issued — General Construction
M01242606-I1-GC
07/27/2026
Objection resolved — Resolved
07/23/2026
Objection raised — Scope
06/16/2026
Filed — Alteration
In kind replacement of rooftop unit. Addition of cooling for server room. Addition of cooling/dehumidification in lab.
M00479888-P3
06/05/2026
Special inspection requirement — Final
Young Suh
05/22/2026
Filed — Alteration
INFILL NEW FOUNDATION WALL AND SLAB ON GRADE OPENINGS FOR CONDUITS.
M01242606-P2
05/20/2026
Signed off — Alteration
MODIFICATION OF EXISTING DUCTWORK AS REQUIRED TO SERVE A NEW MICROSCOPE AREA WITHIN THE EXISTING SPACE. INSTALLATION OF NEW GENERAL EXHAUST FAN AND DEHUMIDIFIER TO MEET INTERIOR SPACE CONDITIONING REQUIREMENTS.
M01074873-S1
05/11/2026
Filed — Alteration
In kind replacement of rooftop unit. Addition of cooling for server room. Addition of cooling/dehumidification in lab.
M00479888-P2
04/30/2026
Signed off — Alteration
MODIFICATION OF EXISTING DUCTWORK AS REQUIRED TO SERVE A NEW MICROSCOPE AREA WITHIN THE EXISTING SPACE. INSTALLATION OF NEW GENERAL EXHAUST FAN AND DEHUMIDIFIER TO MEET INTERIOR SPACE CONDITIONING REQUIREMENTS.
M01074873-I1
04/29/2026
Special inspection requirement — Shutoff dampers
Zhenping Yu
04/29/2026
Special inspection requirement — Lighting controls
Zhenping Yu
04/29/2026
Special inspection requirement — Mechanical Systems
Zhenping Yu
04/29/2026
Special inspection requirement — Heating Systems
Zhenping Yu
04/29/2026
Special inspection requirement — Final
Zhenping Yu
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Zhenping Yu
04/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
Zhenping Yu
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Zhenping Yu
04/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhenping Yu
04/29/2026
Special inspection requirement — Exterior lighting power
Zhenping Yu
04/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Zhenping Yu
04/29/2026
Special inspection requirement — Metering
Zhenping Yu
04/29/2026
Special inspection requirement — Interior lighting power
Zhenping Yu
04/29/2026
Special inspection requirement — Maintenance information
Zhenping Yu
03/26/2026
Special inspection requirement — Final
Young Suh
02/04/2026
Filed — Alteration
In kind replacement of rooftop unit. Addition of cooling for server room. Addition of cooling/dehumidification in lab.
M00479888-P1
11/21/2025
Filed — Alteration
INFILL NEW FOUNDATION WALL AND SLAB ON GRADE OPENINGS FOR CONDUITS.
M01242606-P1
11/10/2025
Signed off — Alteration
INTERIOR RENOVATION, DEMOLITION OF WALLS AND REMOVAL OF DOORS WITH THE AREA. CONSTRUCTION TO RE-FINISH WALLS AND THE FLOORS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED.
M00942365-I1
10/23/2025
Permit issued — General Construction
M00942365-I1-GC
09/25/2025
Filed — Alteration
INTERIOR RENOVATION, DEMOLITION OF WALLS AND REMOVAL OF DOORS WITH THE AREA. CONSTRUCTION TO RE-FINISH WALLS AND THE FLOORS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED.
M00942365-P1
09/19/2025
Permit issued — General Construction
M01242606-I1-GC
09/18/2025
Permit issued — General Construction
M01242606-S1-GC
08/29/2025
Objection resolved — Addressed
08/21/2025
Objection raised — Admin
08/13/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Admin
08/11/2025
Objection resolved — Addressed
08/08/2025
Objection raised — Admin
08/01/2025
Filed — Alteration
INFILL NEW FOUNDATION WALL AND SLAB ON GRADE OPENINGS FOR CONDUITS.
M01242606-S4
07/22/2025
Filed — Alteration
INFILL NEW FOUNDATION WALL AND SLAB ON GRADE OPENINGS FOR CONDUITS.
M01242606-S2
07/21/2025
Filed — Alteration
INFILL NEW FOUNDATION WALL AND SLAB ON GRADE OPENINGS FOR CONDUITS.
M01242606-S1
07/21/2025
Filed — Alteration
INFILL NEW FOUNDATION WALL AND SLAB ON GRADE OPENINGS FOR CONDUITS.
M01242606-S5
07/21/2025
Filed — Alteration
INFILL NEW FOUNDATION WALL AND SLAB ON GRADE OPENINGS FOR CONDUITS.
M01242606-I1
06/24/2025
Permit issued — Mechanical Systems
M00479888-I1-MS
12/12/2024
Permit issued — General Construction
M01074873-I1-GC
11/11/2024
Filed — Alteration
MODIFICATION OF EXISTING DUCTWORK AS REQUIRED TO SERVE A NEW MICROSCOPE AREA WITHIN THE EXISTING SPACE. INSTALLATION OF NEW GENERAL EXHAUST FAN AND DEHUMIDIFIER TO MEET INTERIOR SPACE CONDITIONING REQUIREMENTS.
M01074873-P1
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedH.M. HUGHES CO. INC08/24/2026
DOB NOWGeneral ConstructionPermit IssuedH.M. HUGHES CO. INC08/21/2026
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC10/23/2025
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC09/19/2025
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC09/18/2025
DOB NOWMechanical SystemsPermit IssuedFRESH MEADOW MECHANICAL C06/24/2025
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC12/12/2024
DOB NOWMechanical SystemsSigned-offMATRIX MECHANICAL CORP10/07/2024
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC10/07/2024
DOB NOWMechanical SystemsPermit IssuedFRESH MEADOW MECHANICAL C07/02/2024
DOB NOWMechanical SystemsPermit IssuedFRESH MEADOW MECHANICAL C06/27/2023
DOB NOWMechanical SystemsPermit IssuedFRESH MEADOW MECHANICAL C03/23/2023
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC09/20/2019
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC12/13/2018
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC09/24/2018
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC09/07/2018
BIS—ISSUEDHUNTER ROBERTS CONSTRUCTION11/06/2019
BISMHISSUEDFRESH MEADOW CHILLER SERV07/03/2019
BISOTISSUEDHUNTER ROBERTS CONSTRUCTION03/20/2019
BIS—ISSUEDHUNTER ROBERTS CONSTRUCTION01/02/2019
BISPLISSUEDLOUIS L.BUTTERMARK & SONS10/03/2018
BISOTISSUEDHUNTER ROBERTS CONSTRUCTION09/24/2018
BIS—ISSUEDHUNTER ROBERTS CONSTRUCTION09/14/2018
BISMHISSUEDFRESH MEADOW CHILLER SERV07/10/2018
BISMHISSUEDFRESH MEADOW CHILLER SERV07/03/2017
BISOTISSUEDPK ASSOCIATES INC03/15/2017
BISMHISSUEDFRESH MEADOW CHILLER SERV08/02/2016
BISMHISSUEDPK ASSOCIATES INC07/22/2016
BISOTISSUEDPK ASSOCIATES INC07/22/2016
BISPLISSUEDMARCO POLO PLBG & HTG INC02/16/2016
BISMHISSUEDPK ASSOCIATES INC04/15/2015
BISOTISSUEDPK ASSOCIATES INC04/15/2015
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT02/07/2006
BISEQISSUEDCAULDWELL WINGATE CO LLC12/28/2005
BISSDISSUEDCARDOZA CORP12/15/2005
BISPLISSUEDCARDOZA COPR05/10/2005
BISEQISSUEDCAULDWELL WINGATE CO LLC05/02/2005
BIS—ISSUEDCAULDWELL WINGATE LLC.05/02/2005
BISOTISSUEDCAULDWELL-WINGATE CO12/29/2004
BISOTISSUEDCAULDWELL-WINGATE CO11/04/2004
+ 17 more permits on file
2 projects · most recent 06/16/2026
Air Conditioning Systems Ventilation Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2026Permit IssuedFRESH MEADOW MECHANICAL CAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Carrier 30RAP060 64 tons · Chiller ×3
Ventilation
York JROA15OK2ADBB 4,500 CFM · Doas ×1
Refrigeration
Modine LFS8213-5M8-2B 29,310 CFM ×2
05/22/2026Permit IssuedH.M. HUGHES CO. INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-2D20NLHZ 18,000 BTU · Heat Pump Outdoor ×1
Ventilation
1 project · most recent 03/16/2021
Water/Sanitary
FiledStatusContractorScope
03/16/2021——Water/Sanitary
7 projects · most recent 07/27/2026
General Wiring
FiledStatusContractorScope
07/27/2026Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
07/17/2024Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
05/17/2024Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
05/15/2024Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
04/25/2024Permit IssuedALLAN BRITEWAY ELECTRICAL—
02/27/2023Permit IssuedALLAN/BRITE-WAY ELEC'L COGeneral Wiring
11/07/2018Permit IssuedDOOLEY ELECTRIC CO., INC.General Wiring
1 project · most recent 05/22/2026
FiledStatusContractorScope
05/22/2026Permit IssuedH.M. HUGHES CO. INC1 scope_items
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/26/2026Mechanical SystemsROBERT KARPOWICZspecial
08/26/2026Heating SystemsROBERT KARPOWICZspecial
08/26/2026FinalROBERT KARPOWICZprogress
08/26/2026Energy Code Compliance InspectionsROBERT KARPOWICZprogress
08/26/2026Duct leakage testing, insulation and designROBERT KARPOWICZenergy_progress
08/26/2026Maintenance informationROBERT KARPOWICZenergy_progress
08/26/2026MeteringROBERT KARPOWICZenergy_progress
08/26/2026HVAC-R and service water heating equipmentROBERT KARPOWICZenergy_progress
08/26/2026Interior lighting powerROBERT KARPOWICZenergy_progress
08/26/2026Lighting controlsROBERT KARPOWICZenergy_progress
08/26/2026HVAC-R and service water piping design and insulationROBERT KARPOWICZenergy_progress
08/26/2026Shutoff dampersROBERT KARPOWICZenergy_progress
08/26/2026Exterior lighting powerROBERT KARPOWICZenergy_progress
08/26/2026HVAC-R and service water heating system controlsROBERT KARPOWICZenergy_progress
06/05/2026FinalYoung Suhprogress
04/29/2026Shutoff dampersZhenping Yuenergy_progress
04/29/2026Lighting controlsZhenping Yuenergy_progress
04/29/2026Mechanical SystemsZhenping Yuspecial
04/29/2026Heating SystemsZhenping Yuspecial
04/29/2026FinalZhenping Yuprogress
04/29/2026Energy Code Compliance InspectionsZhenping Yuprogress
04/29/2026Duct leakage testing, insulation and designZhenping Yuenergy_progress
04/29/2026HVAC-R and service water heating equipmentZhenping Yuenergy_progress
04/29/2026HVAC-R and service water piping design and insulationZhenping Yuenergy_progress
04/29/2026Exterior lighting powerZhenping Yuenergy_progress
Latest 25 of 59.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYSBCLaboratorySub-cellar
Project M01242606 Alteration · Permit Entire · 07/21/2025
New York Structural Biology Center NYSBCLaboratoryCellar, Sub-basement, Basement, Floors 1, 2
Project M01074873 Alteration · LOC Issued · 08/16/2024
Project M00942365 Alteration · LOC Issued · 10/31/2023
NY Structural BiologyLaboratory—
Project M00479888 Alteration · Permit Entire · 03/16/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 313 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
09/06/2026M00076783-I1Request digital key ↗
08/28/2026M00942365-P1Request digital key ↗
08/28/2026M00942365-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/14/2026M00253830-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION30
08/04/2022123586618Open ↗
07/20/2022123586618Open ↗
07/19/2022123586618Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION22
12/17/2019123586618Open ↗
11/06/2019123586618Open ↗
10/30/2019123586618Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/17/2019123586618Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
08/20/2018123586618Open ↗
▸Seals & Professional Certifications100
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
03/04/2020123494003Open ↗
03/04/2020123494003Open ↗
03/04/2020123494003Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/25/2026M00942365-I1Open ↗
09/12/2026M01074873-S1Open ↗
09/12/2026M01074873-S1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/06/2026M00076783-I1Open ↗
09/04/2026M00481090-I1Open ↗
08/28/2026M00942365-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/12/2026M01074873-S1Open ↗
09/01/2026M01074873-P1Open ↗
09/01/2026M00479888-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
09/24/2018123543807Open ↗
09/24/2018123543807Open ↗
06/09/2016122791773Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/09/2016122791773Open ↗
03/30/2015122274895Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
03/25/2020123586618Open ↗
03/09/2020123586618Open ↗
10/26/2018123494003Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS1
03/29/2022123586618Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/09/2020123382286Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes1
06/09/2016122791773Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/14/2018123586618Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/14/2018123586618Open ↗
▸BISSTREET TREE CHECKLIST1
09/14/2018123586618Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
01/28/2020123586618Open ↗
01/28/2020123586618Open ↗
01/28/2020123586618Open ↗
Showing 3 of 12 on file for this type
▸BISLIGHTING CONTROLS1
01/21/2022123586618Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/21/2022123586618Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/03/2016122274895Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00479888-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
09/14/2018123586618Open ↗
09/14/2018123586618Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/20/2018123586618Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/14/2018123586618Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
12/21/2022123586618Open ↗
▸Approvals, Objections & Sign-offs33
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/06/2026M00076783-I1Open ↗
08/26/2026M01074873-S1Open ↗
08/26/2026M01074873-I1Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
10/23/2020123382286Open ↗
03/04/2020123494003Open ↗
02/12/2020123494003Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
08/04/2022123586618Open ↗
07/20/2022123586618Open ↗
04/26/2022123586618Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER2
11/06/2019123586618Open ↗
08/10/2016122791773Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT21
03/04/2020123494003Open ↗
12/12/2019123543807Open ↗
10/26/2018123494003Open ↗
Showing 3 of 21 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
12/17/2019123586618Open ↗
01/03/2019123586618Open ↗
09/14/2018123586618Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
06/08/2022122791773Open ↗
10/23/2020123382286Open ↗
▸Filing & Intake Forms38
▸BISEFILING COVER SHEET15
10/26/2018123494003Open ↗
09/24/2018123543807Open ↗
07/02/2018123586618Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION12
03/16/2023123586618Open ↗
03/11/2020123586618Open ↗
10/24/2019123586618Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM11
03/25/2020123586618Open ↗
03/09/2020123586618Open ↗
03/04/2020123494003Open ↗
Showing 3 of 11 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
10/26/2018123494003Open ↗
08/09/2018123586618Open ↗
06/29/2018123382286Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM2
08/20/2018123586618Open ↗
06/29/2018123586618Open ↗
▸BISSupporting Document: Fee Exempt1
12/02/2022123586618Open ↗