85 JOHN STREET
MANHATTAN · BIN 1001185
💬 Discuss this project
1926Year Built
14Stories
D7Building Class
C6-4Zoning
160,000 sfGross Floor Area
163Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: HENRY 85 · 12,180 sf lot · 13.14 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 2 docs
Bulkhead1p · 1 filing · 6 docs
Floor 16p · 5 filings · 20 docs
Cellar4p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRAT ENTERPRISES907/08/2026
HENRY 853603/22/2026
BRENMAC303/22/2026
RJ HOSPITALITY LIMITED103/22/2026
ROMO CONSTRUCTION103/22/2026
THE KIBEL COMPAMRY LLC203/22/2026
COMPANIES LLC THE KIBEL103/22/2026
W.P.G. MGMT INC.403/22/2026
W.P.G .GT CO.103/22/2026
85 JOHN STREET PARTNERSHIP303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIT MIDDLETON ARCHITECT P.C.201/26/2026
EDG209/03/2024
MOTTOLA RINI ENGINEERS1708/16/2024
CHEUNG SHOWMAN ARCHITECTS207/11/2023
ASHRAF CORP501/26/2023
GACE DPC103/28/2022
LEON SKVIRSKY PE109/30/2020
RHL ENGINEERING, LLC109/17/2020
A. GIANNOPOULOS ARCHITECTS PLLC.208/31/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KIT MIDDLETON ARCHITECT P C4403/21/2026
Rigid Structural Design, LLC503/21/2026
LMS-ACE SERVICES203/21/2026
AE DESIGN SOLUTION203/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRAT ENTERPRISES CORPGeneral Contractor607/08/2026
DEMAR MECHANICAL INCPlumbing407/08/2026
LAKE CONTRACTING LLCGeneral Contractor407/08/2026
MACKLER MASTER FIRE INCFire Protection207/08/2026
FOLOR INCGeneral Contractor207/08/2026
NORTHEAST CONTRACTING GPGeneral Contractor203/21/2026
PAUL SIGNSScaffold107/08/2026
THE KIBEL COMPANIES LLCGeneral Contractor107/08/2026
JUST PLBG & HTG INCPlumbing107/08/2026
EXPERT FIRE SPRINKLER,LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666601/26/2026
EDG2578209/03/2024
MOTTOLA RINI ENGINEERS, P32511408/16/2024
OUTSOURCE SPECIAL INSPECT2827103/28/2022
RHL ENGINEERING, LLC712109/17/2020
A. GIANNOPOULOS ARCHITECT2196208/31/2020
Building Lifecycle
All (204)Filed (35)Permit Issued (22)Signed Off (18)Facade (FISP) (12)Violation (60)Inspection (9)Objection (18)Special Inspection (30)
07/28/2026
Permit issued — Suspended Scaffold
M01428358-I1-SC
07/15/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01428358-I1
05/28/2026
Signed off — Alteration
M01342738-I1
05/15/2026
Permit issued — General Construction
M01342738-I1-GC
04/13/2026
Objection resolved — Resolved
04/09/2026
Objection resolved — Addressed
04/06/2026
Signed off — Alteration
M01337904-I1
03/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/10/2026
Permit issued — Plumbing
M01337904-I1-PL
02/13/2026
Objection resolved — Addressed
02/13/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Other
02/09/2026
Objection raised — Cost
01/26/2026
Filed — Alteration
M01342738-I1
01/23/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Cost
01/20/2026
Objection raised — Admin
01/20/2026
Objection raised — Admin
01/05/2026
Filed — Alteration
M01337904-I1
06/12/2025
Signed off — Alteration
replace existing gas boilers with new as indicated on plans. no change in use or egress.
M00876854-S1
02/20/2025
Signed off — Alteration
replace existing gas boilers with new as indicated on plans. no change in use or egress.
M00876854-I1
01/21/2025
Signed off — Alteration
Installation of suspended scaffold for facade work or inspection
M01031720-I1
01/14/2025
Permit issued — Suspended Scaffold
M01031720-I1-SC
12/18/2024
Signed off — Alteration
PROPOSED GARAGE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00841162-I1
10/01/2024
Signed off — Alteration
installation of ten (10) new sprinkler heads and relocation of sixteen (16) sprinkler heads at 1st floor. No change in use, occupancy or egress.
M00364308-I1
09/12/2024
Permit issued — Structural
M00841162-I1-GC-CX
09/11/2024
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
09/11/2024
Special inspection requirement — Final
Anthony Stasio
09/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
09/03/2024
Filed — Alteration
PROPOSED GARAGE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00841162-P1
09/03/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/27/2024
Special inspection requirement — Final
Anthony Stasio
08/27/2024
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
08/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2024
Permit issued — Sprinklers
M00364308-I1-EW-SP
08/19/2024
Signed off — Alteration
MODIFY EXISTING BRANCH GAS PIPING TO REPLACE EXISTING BOILERS. NO CHANGE IN USE OR EGRESS
M00876887-I1
08/16/2024
Filed — Alteration
installation of ten (10) new sprinkler heads and relocation of sixteen (16) sprinkler heads at 1st floor. No change in use, occupancy or egress.
M00364308-P1
08/15/2024
Special inspection requirement — Sprinkler Systems
Anthony Rini, III
07/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2024
Signed off — Alteration
INSTALLATION OF NEW HEAT PUMP IN AN EXISTING RETAIL SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00294438-I1
06/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2024
Filed — Alteration
MODIFY EXISTING BRANCH GAS PIPING TO REPLACE EXISTING BOILERS. NO CHANGE IN USE OR EGRESS
M00876887-P2
06/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/29/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/16/2024
Filed — Alteration
MODIFY EXISTING BRANCH GAS PIPING TO REPLACE EXISTING BOILERS. NO CHANGE IN USE OR EGRESS
M00876887-P1
05/15/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/10/2024
Filed — Alteration
replace existing gas boilers with new as indicated on plans. no change in use or egress.
M00876854-P4
05/10/2024
Filed — Alteration
replace existing gas boilers with new as indicated on plans. no change in use or egress.
M00876854-P5
05/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
05/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
05/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
05/10/2024
Special inspection requirement — Heating Systems
Anthony Rini, III
05/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
05/10/2024
Special inspection requirement — Heating Systems
Anthony Rini, III
05/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
05/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM07/28/2026
DOB NOWGeneral ConstructionSigned-offTHE KIBEL COMPANIES LLC05/15/2026
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC03/10/2026
DOB NOWSuspended ScaffoldSigned-offSTANDARD WATERPROOFING C01/14/2025
DOB NOWStructuralSigned-offLAKE CONTRACTING LLC09/12/2024
DOB NOWSprinklersSigned-offMACKLER MASTER FIRE INC08/20/2024
DOB NOWSuspended ScaffoldSigned-offSTANDARD WATERPROOFING C04/23/2024
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC03/19/2024
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC02/20/2024
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC09/20/2023
DOB NOWGeneral ConstructionSigned-offLAKE CONTRACTING LLC09/11/2023
DOB NOWSprinklersSigned-offMACKLER MASTER FIRE INC02/15/2023
DOB NOWMechanical SystemsSigned-offFOLOR INC02/06/2023
DOB NOWConstruction FenceSigned-offFOLOR INC09/26/2022
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP05/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offPRAT ENTERPRISES CORP05/04/2022
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP04/29/2022
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP04/21/2022
DOB NOWSignSigned-offPAUL SIGNS, INC10/05/2020
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC09/18/2020
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK06/12/2020
DOB NOWMechanical SystemsSigned-offNORTHEAST CONTRACTING GP02/20/2020
BIS—ISSUEDFOLOR INC11/29/2023
BIS—ISSUEDFOLOR INC10/04/2022
BISOTISSUEDRJ HOSPITALITY LIMITED03/17/2020
BISOTISSUEDNORTHEAST CONTRACTING GP02/24/2020
BISOTISSUEDMARREN MECHANICAL INC05/05/2018
BISPLISSUEDCLOVERDALE MASTER P&H INC05/05/2018
BISOTISSUEDROMO CONSTRUCTION CORP10/04/2017
BISEQISSUEDBRENMAC CORP08/30/2017
BISOTISSUEDTHOMAS MAINTENANCE INC12/05/2014
BISOTISSUEDEDRAS GROUP CORP06/09/2012
BISOTISSUEDEDRAS GROUP CORP05/10/2012
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/01/2012
BIS—ISSUEDA.M.A HOLDINGS INC09/27/2011
BIS—ISSUEDA.M.A HOLDINGS INC09/27/2011
BIS—ISSUEDA.M.A HOLDINGS INC09/27/2011
BISOTISSUEDWING KIN CONSULTING INC08/11/2011
BISEQISSUEDWING KIN CONSULTING INC08/08/2011
BISOTISSUEDT.M.I CONTRACTING CORP07/18/2006
+ 17 more permits on file
7 projects · most recent 06/16/2025
General Wiring Lighting
FiledStatusContractorScope
06/16/2025CompleteIP2 ELECTRIC LLCLighting
12/01/2022CompleteM.C. ELECTRICAL NY INCGeneral Wiring
05/15/2022CompleteSTEVEN FARKAS—
10/07/2020CompleteTMF ELEC'L CONTR. INC.—
06/03/2020CompleteATN ELECTRIC CORPGeneral Wiring
03/09/2020CompleteINTER CONNECTION ELETRICGeneral Wiring
03/05/2020CompleteA.C. MORGAN ELECTRICGeneral Wiring
1 project · most recent 07/15/2026
FiledStatusContractorScope
07/15/2026Permit IssuedSTRUCTUAL PRESV SYSTEM—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/03/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/15/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/22/2024Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
09/11/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
09/11/2024FinalAnthony Stasioprogress
09/11/2024Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
08/27/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
08/27/2024FinalAnthony Stasioprogress
08/27/2024Tenant Protection Plan Compliance—special
08/15/2024Sprinkler SystemsAnthony Rini, IIIspecial
06/04/2024Tenant Protection Plan Compliance—special
05/10/2024HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
05/10/2024HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
05/10/2024HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
05/10/2024HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
05/10/2024Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
05/10/2024Heating SystemsAnthony Rini, IIIspecial
05/10/2024Heating SystemsAnthony Rini, IIIspecial
05/10/2024HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
05/10/2024HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
05/10/2024Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
05/08/2024HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
05/08/2024Heating SystemsAnthony Rini, IIIspecial
05/08/2024Tenant Protection Plan Compliance—special
05/08/2024HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
05/08/2024HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
05/08/2024Heating SystemsAnthony Rini, IIIspecial
05/08/2024Tenant Protection Plan Compliance—special
Latest 25 of 71.
▾Documents — 416 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch21
09/02/2026M00728013-I1Request digital key ↗
09/02/2026M00727461-I1Request digital key ↗
09/01/2026M00719067-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00294438-I1Request digital key ↗
09/05/2026M00294438-P1Request digital key ↗
09/05/2026M00294438-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00364308-I1Request digital key ↗
09/04/2026M00364308-P1Request digital key ↗
09/04/2026M00390090-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00293261-I1Request digital key ↗
08/15/2026M00293261-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/30/2026M00348562-I1Request digital key ↗
08/30/2026M00348562-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00394121-I1Request digital key ↗
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION39
10/21/2025101767063Open ↗
10/08/2025102869852Open ↗
10/03/2025102614761Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION16
10/04/2022123865406Open ↗
03/18/2020123154040Open ↗
02/27/2020123841842Open ↗
Showing 3 of 16 on file for this type
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
10/03/2022123865406Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
10/03/2022123865406Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/23/2025123865406Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
10/03/2022123865406Open ↗
▸Seals & Professional Certifications154
▸DOB NOWProgress Inspector Seal & Signature39
09/23/2026M00876854-I1Open ↗
09/23/2026M00876854-S1Open ↗
09/23/2026M00876854-S1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/04/2026M00364308-P1Open ↗
09/04/2026M00364308-I1Open ↗
09/02/2026M00690032-I1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
03/18/2020123154040Open ↗
03/17/2020123154040Open ↗
03/05/2020123841842Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/23/2026M00876854-S1Open ↗
09/23/2026M00876854-S1Open ↗
09/23/2026M00876854-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
03/17/2020123154040Open ↗
02/27/2020123841842Open ↗
Showing 2 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/17/2020123154040Open ↗
02/27/2020123841842Open ↗
04/30/2018140761735Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/30/2018140761735Open ↗
08/29/2017140675179Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/30/2018140761735Open ↗
08/29/2017140675179Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
04/30/2018140761735Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/16/2018140761735Open ↗
▸Safety & Tenant Protection23
▸DOB NOWTenant Protection Plan13
09/04/2026M00364308-I1Open ↗
09/04/2026M00364308-P1Open ↗
08/13/2026M00363091-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTenant Protection Plan and Notes6
03/17/2020123154040Open ↗
02/27/2020123841842Open ↗
02/18/2020123865406Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
02/18/2020123865406Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/18/2020123865406Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/03/2022123865406Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/04/2026M00364308-P1Open ↗
09/04/2026M00364308-I1Open ↗
08/31/2026M00841162-P1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/17/2020123154040Open ↗
02/27/2020123841842Open ↗
02/18/2020123865406Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
03/17/2020123154040Open ↗
02/27/2020123841842Open ↗
02/18/2020123865406Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/08/2025123865406Open ↗
03/06/2024123841842Open ↗
11/20/2020123154040Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/20/2020123154040Open ↗
11/01/2018140761735Open ↗
09/24/2015122179686Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/08/2025123865406Open ↗
03/06/2024123841842Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00876854-S1Open ↗
08/13/2026M00876854-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/30/2018140761735Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/29/2017140675179Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/08/2025123865406Open ↗
07/28/2025123865406Open ↗
03/06/2024123841842Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
03/13/2024123841842Open ↗
11/20/2020123154040Open ↗
11/01/2018140761735Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
03/02/2012120987183Open ↗
Showing 1 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/01/2018140761735Open ↗
05/27/2015122179686Open ↗
01/03/2013120769089Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
02/18/2020123865406Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT23
11/20/2020123154040Open ↗
03/17/2020123154040Open ↗
02/27/2020123841842Open ↗
Showing 3 of 23 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/06/2024123841842Open ↗
03/06/2024123841842Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/03/2022123865406Open ↗
▸Filing & Intake Forms32
▸BISADDITIONAL INFORMATION13
10/21/2025101767063Open ↗
06/23/2025123865406Open ↗
07/17/2023123865406Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET11
03/17/2020123154040Open ↗
02/27/2020123841842Open ↗
02/18/2020123865406Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM6
11/01/2018140761735Open ↗
07/26/2018121231648Open ↗
07/19/2018121231648Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/30/2018140761735Open ↗
08/29/2017140675179Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/06/2012120987183Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM1
02/18/2020123865406Open ↗
▸BISVESTIBULES1
10/03/2022123865406Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01031720-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01031720-I1Open ↗