| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/31/2022 | Permit Issued | MICHELLE KUO CORP | Air Conditioning Systems | Cooling |
| 04/13/2022 | Permit Issued | RELIABLE GENERAL CONTRACT | Associated Ducts and Piping, Ventilation Systems | Ventilation Greenheck ×1 |
| 10/01/2021 | Permit Issued | HARDESTY & ASSOCIATES, IN | Air Conditioning Systems | Cooling |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/24/2026 | — | — | 14 heads |
| 10/31/2022 | Signed-off | A & F FIRE PROTECTION CO | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/24/2026 | Signed-off | HYDROKINETIC PLBG & HTG I | Gas, Water/Sanitary |
| 10/31/2022 | Signed-off | TRI STATE PLBG & HTG INC | Gas, Water/Sanitary |
| 10/01/2021 | Signed-off | L&J PLG & HTG CO OF NY IN | Water/Sanitary |
| 06/02/2021 | Signed-off | GALICJA PLBG AND HTG.CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/23/2026 | Permit Issued | T. DIRUSSO ELEC'L CONT IN | General Wiring |
| 04/16/2025 | Permit Issued | NION ELECTRIC CORP | General Wiring |
| 11/04/2024 | Complete | CHL ELECT CONTRACTOR INC | General Wiring |
| 09/13/2024 | Complete | TK ELECTRIC INC | General Wiring |
| 07/24/2024 | Complete | DENNISON ELECTRIC CORP | — |
| 04/19/2024 | Permit Issued | ACCURATE ELEC'L CORP. | General Wiring |
| 04/25/2023 | Complete | INWOOD ELECTRIC CORP | 1 meters |
| 07/22/2022 | Permit Issued | T. DIRUSSO ELEC'L CONT IN | 1 meters, 1 new_meters |
| 04/14/2022 | Complete | T. DIRUSSO ELEC'L CONT IN | — |
| 04/07/2022 | Complete | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 03/13/2022 | Complete | JUMPER ELECTRIC CORP | HVAC Wiring |
| 02/24/2022 | Complete | JEM ELEC'L CONTR. CORP | General Wiring |
| 01/05/2022 | Complete | L&B ELEC'L INTERNATIONAL | General Wiring |
| 12/31/2021 | Complete | T. DIRUSSO ELEC'L CONT IN | 1 meters, 1 new_meters |
| 10/14/2021 | Permit Issued | DB ELECTRIC LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/31/2021 | Signed-off | RELIABLE GENERAL CONTRACT | Masonry |
| Owner | Filings | Most Recent |
|---|---|---|
| MAXWELL KATES | 15 | 09/13/2026 |
| MIDWOOD MANAGEMENT | 52 | 07/08/2026 |
| MIDWOOD INVESTMENT DEVELOPMENT | 30 | 07/08/2026 |
| M.W. EXPEDITING INC | 5 | 03/22/2026 |
| TO OWNERS OF 83 NORTH 3RD | 3 | 03/22/2026 |
| D A EQUITIES | 4 | 03/22/2026 |
| LEE WHITE REALTY CORP | 1 | 03/22/2026 |
| A-1 SCAFFOLDING (J AND G | 1 | 03/22/2026 |
| NORTHSIDE DEVELOPMENT | 33 | 03/22/2026 |
| LEE & WYTHE REALTY CO | 22 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ENGINEERING PROFESSIONAL SERVICE P. | 10 | 04/24/2026 |
| DARIUS TORABY ARCHITECTS, P.C. | 1 | 04/23/2026 |
| DEVOTE ARCH & DESIGN STUDIO, PLLC | 1 | 09/20/2024 |
| EP ENGINEERING LLC | 3 | 06/27/2024 |
| LEON SKVIRSKY PE | 1 | 02/14/2024 |
| MEY ASSOCIATES | 1 | 10/24/2023 |
| EG ARCHITECTURE PLLC | 2 | 05/04/2023 |
| CONCORD CONSULTING ENGINEERING PC | 5 | 10/31/2022 |
| SA-DA ARCHITECTURE | 6 | 04/14/2022 |
| GANNETT FLEMING | 1 | 04/13/2022 |
| HC ARCHITECT, PC | 1 | 04/01/2022 |
| KLH PROFESSIONAL ENGINEERS, PSC P.C | 2 | 03/24/2022 |
| KEVIN LOUIS PELLON | 1 | 02/11/2022 |
| WILSON & ASSOCIATES ENGINEERING DPC | 2 | 12/01/2021 |
| LALIRE MARCH ARCHITECTS LLP | 1 | 11/11/2021 |
| CL ENGINEERING P.C. | 2 | 11/08/2021 |
| NY AC, LLC | 1 | 11/02/2021 |
| ZSOLT VAMOSI | 2 | 10/01/2021 |
| CHRISTOPHER COMPTON | 1 | 10/01/2021 |
| THE VILNITS GROUP | 1 | 09/23/2021 |
| LEVIN ENGINEERING PLLC | 1 | 09/21/2021 |
| MARTOS ENGINEERING | 1 | 08/31/2021 |
| CES ENGINEERING LLC | 2 | 06/02/2021 |
| ADG ARCHITECTURE AND DESIGN PC | 1 | 05/11/2021 |
| ANDREW FORMICHELLA | 1 | 08/13/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| BIG ORANGE EXPEDITING | 14 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 14 | 03/21/2026 |
| GEORGE E BERGER ASSOCIATES | 6 | 03/21/2026 |
| METRO DESIGN CONSULTANTS INC | 4 | 03/21/2026 |
| ECC | 2 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 2 | 03/21/2026 |
| JP EXPEDITE | 2 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| ARINNITY NYC | 9 | 03/21/2026 |
| MADISON REED COLOR BAR III | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RELIABLE GENERAL CONTRACT | General Contractor | 20 | 07/08/2026 |
| MICHELLE KUO CORP | General Contractor | 7 | 07/08/2026 |
| SHAPEL GENERAL CONTRACTIN | General Contractor | 7 | 07/08/2026 |
| HYDROKINETIC PLBG & HTG I | Plumbing | 4 | 07/08/2026 |
| CAMPBELL DESIGN & | General Contractor | 4 | 07/08/2026 |
| AMM GEN'L CONTRACTING INC | Plumbing | 3 | 07/08/2026 |
| MODERN SERVICES SOLUTIONS | General Contractor | 3 | 03/21/2026 |
| GALLERY RESTORATION LTD | General Contractor | 3 | 04/09/2026 |
| HARDESTY & ASSOCIATES, IN | General Contractor | 3 | 03/21/2026 |
| TATRA RENOVATION INC | General Contractor | 2 | 03/21/2026 |
| TRI STATE PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| VERSATILE SERVICES LLC | General Contractor | 2 | 03/21/2026 |
| AP PLUMBING & HVAC LLC | Plumbing | 2 | 03/22/2026 |
| CENTRAL AIR CONDITIONING | General Contractor | 2 | 03/21/2026 |
| TK ELECTRIC INC | Electrical | 2 | 03/22/2026 |
| C.M. RICHEY ELEC'L CONTR | Electrical | 1 | 03/22/2026 |
| SIGNS CAD | Scaffold | 1 | 07/08/2026 |
| JAVIER VALERA ACERO | Electrical | 1 | 03/21/2026 |
| JEM ELEC'L CONTR. CORP | Electrical | 1 | 03/22/2026 |
| TODARO JOSEPH | Electrical | 1 | 03/21/2026 |
| A & F FIRE PROTECTION CO | Fire Protection | 1 | 07/08/2026 |
| ANESIS SERVICES CORP | Fire Protection | 1 | 07/08/2026 |
| PREMIER FLOW PLBG AND HTG | Fire Protection | 1 | 07/08/2026 |
| D/A HEATING & COOLING INC | General Contractor | 1 | 07/08/2026 |
| DESIGN 2 BUILD NEW YORK I | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| BUILDTECH ENGINEERING | 6369 | 5 | 04/24/2026 |
| STRIGA ARCHITECTURE, PLLC | 8026 | 1 | 09/20/2024 |
| EP INSPECTIONS AND COMMIS | 7079 | 4 | 06/27/2024 |
| MOHAMMAD AHEAD - PROFESSI | 9286 | 1 | 10/24/2023 |
| MJ ENGINEERING & DESIGN | 5546 | 5 | 10/31/2022 |
| SA-DA ARCHITECTURE | 2640 | 4 | 04/14/2022 |
| HAMANN ENGINEERING, PLLC | 4949 | 1 | 04/13/2022 |
| SKYLINE ENGINEERING, PLLC | 267 | 2 | 03/24/2022 |
| DNA CONTROLLED INSPECTION | 554 | 3 | 12/01/2021 |
| CL ENGINEERING P.C. | 6781 | 2 | 11/08/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Signed-off | JAMES PATRICK COMPANY INC | 07/28/2025 |
| DOB NOW | Plumbing | Signed-off | HYDROKINETIC PLBG & HTG I | 04/16/2025 |
| DOB NOW | General Construction | Signed-off | GALLERY RESTORATION LTD | 04/07/2025 |
| DOB NOW | General Construction | Permit Issued | MODERN SERVICES SOLUTIONS | 02/14/2024 |
| DOB NOW | General Construction | Signed-off | CAMPBELL DESIGN & | 12/27/2023 |
| DOB NOW | Mechanical Systems | Signed-off | D/A HEATING & COOLING INC | 09/25/2023 |
| DOB NOW | Sprinklers | Signed-off | THOMAS FAY | 09/21/2023 |
| DOB NOW | General Construction | Permit Issued | SHAPEL GENERAL CONTRACTIN | 06/29/2023 |
| DOB NOW | Plumbing | Signed-off | HYDROKINETIC PLBG & HTG I | 05/23/2023 |
| DOB NOW | General Construction | Signed-off | CAMPBELL DESIGN & | 05/15/2023 |
| DOB NOW | Plumbing | Signed-off | DW PLUMBING INC | 08/10/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | RELIABLE GENERAL CONTRACT | 06/03/2022 |
| DOB NOW | Plumbing | Signed-off | AMM GEN'L CONTRACTING INC | 05/13/2022 |
| DOB NOW | Plumbing | Signed-off | J. CAIAZZO PLBG & HTG COR | 04/28/2022 |
| DOB NOW | General Construction | Signed-off | RELIABLE GENERAL CONTRACT | 04/27/2022 |
| DOB NOW | Construction Fence | Signed-off | RELIABLE GENERAL CONTRACT | 04/27/2022 |
| DOB NOW | Mechanical Systems | Signed-off | RELIABLE GENERAL CONTRACT | 04/13/2022 |
| DOB NOW | General Construction | Permit Issued | SHAPEL GENERAL CONTRACTIN | 04/12/2022 |
| DOB NOW | General Construction | Signed-off | RELIABLE GENERAL CONTRACT | 04/08/2022 |
| DOB NOW | General Construction | Signed-off | 18-15 REALTY LLC | 04/06/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | 18-15 REALTY LLC | 04/06/2022 |
| DOB NOW | Sign | Permit Issued | SIGNS CAD CORP | 04/04/2022 |
| DOB NOW | Plumbing | Signed-off | ADVANCED AUTO SPR.CO.,INC | 04/02/2022 |
| DOB NOW | Plumbing | Signed-off | AMM GEN'L CONTRACTING INC | 03/31/2022 |
| DOB NOW | Plumbing | Signed-off | DW PLUMBING INC | 03/03/2022 |
| DOB NOW | General Construction | Signed-off | 18-15 REALTY LLC | 03/01/2022 |
| DOB NOW | Plumbing | Signed-off | AMM GEN'L CONTRACTING INC | 02/26/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | 18-15 REALTY LLC | 02/21/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | SHAPEL GENERAL CONTRACTIN | 02/03/2022 |
| DOB NOW | General Construction | Signed-off | RELIABLE GENERAL CONTRACT | 02/02/2022 |
| DOB NOW | General Construction | Permit Issued | RELIABLE GENERAL CONTRACT | 01/28/2022 |
| DOB NOW | Sprinklers | Permit Issued | GALICJA PLBG AND HTG CORP | 01/19/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | HARDESTY & ASSOCIATES, IN | 11/24/2021 |
| DOB NOW | Structural | Signed-off | RELIABLE GENERAL CONTRACT | 11/15/2021 |
| DOB NOW | Construction Fence | Signed-off | RELIABLE GENERAL CONTRACT | 11/10/2021 |
| DOB NOW | General Construction | Signed-off | RELIABLE GENERAL CONTRACT | 11/10/2021 |
| DOB NOW | Plumbing | Signed-off | MAXWELL PLUMB MECH. CORP | 10/25/2021 |
| DOB NOW | Plumbing | Signed-off | L&J PLG & HTG CO OF NY IN | 10/12/2021 |
| DOB NOW | General Construction | Signed-off | DESIGN 2 BUILD NEW YORK I | 10/12/2021 |
| DOB NOW | Construction Fence | Permit Issued | VERSATILE SERVICES LLC | 10/06/2021 |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/31/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/25/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/24/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/18/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/01/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/26/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/05/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/27/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/05/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/25/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/05/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/26/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/25/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/22/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/22/2022 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 08/19/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/09/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/29/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/28/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/17/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/10/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/24/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/17/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/04/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Luis Pichardo | special |
| 05/12/2026 | Sprinkler Systems | Luis Pichardo | special |
| 04/24/2026 | Energy Code Compliance Inspections | Luis Pichardo | progress |
| 04/24/2026 | Final | RONALD VILLANO | progress |
| 04/24/2026 | Lighting in dwelling units | Luis Pichardo | energy_progress |
| 04/21/2026 | Sprinkler Systems | Luis Pichardo | special |
| 04/21/2026 | Final | — | progress |
| 04/21/2026 | Fire-Resistant Penetrations and Joints | Luis Pichardo | special |
| 03/06/2026 | Lighting in dwelling units | Luis Pichardo | energy_progress |
| 03/06/2026 | Fire-Resistant Penetrations and Joints | Luis Pichardo | special |
| 03/06/2026 | Sprinkler Systems | Luis Pichardo | special |
| 03/06/2026 | Energy Code Compliance Inspections | Luis Pichardo | progress |
| 03/06/2026 | Final | RONALD VILLANO | progress |
| 02/06/2026 | Sprinkler Systems | Luis Pichardo | special |
| 02/06/2026 | Fire-Resistant Penetrations and Joints | Luis Pichardo | special |
| 01/16/2025 | Energy Code Compliance Inspections | — | progress |
| 01/16/2025 | Final | — | progress |
| 01/16/2025 | Lighting in dwelling units | — | energy_progress |
| 01/16/2025 | Mechanical Systems | — | special |
| 08/13/2024 | Tenant Protection Plan Compliance | Keith Striga | special |
| 08/13/2024 | Final | PING MAN HO | progress |
| 06/27/2024 | Duct leakage testing, insulation and design | Christopher Burgess | energy_progress |
| 06/27/2024 | Maintenance information | Christopher Burgess | energy_progress |
| 06/27/2024 | HVAC-R and service water heating system controls | Christopher Burgess | energy_progress |
| 06/27/2024 | HVAC-R and service water piping design and insulation | Christopher Burgess | energy_progress |