← Back
Two stories - detached, small or mid-size
85 RIDGECREST AVENUE
STATEN ISLAND · BIN 5174724
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R3AZoning
1,531 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,787 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
StructuralCivilGeneral
Roof1p · 1 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Basement1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LOBUE & VALENZIANO, LLP612/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO BUE VALENZIANO AIA1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor1407/08/2026
PREMIER PL HTG MECHGeneral Contractor103/21/2026
TRITTO JOHNGeneral Contractor103/21/2026
PREMIER PL,HTG & MECH INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677207/31/2023
Building Lifecycle
All (56)Filed (6)Permit Issued (7)Signed Off (3)Inspection (10)Special Inspection (30)
01/31/2024
Signed off — Alteration
S00663245-I1
01/08/2024
Signed off — New Building
INSTALLATION OF 9' CURB CUT
S00600711-S2
01/05/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/29/2023
Signed off — Alteration
INSTALL PIPING AND PLUMBING FIXTURES AS PER PLANS.
S00663974-I1
12/20/2023
Permit issued — Plumbing
S00663974-I1-PL
12/11/2023
Filed — Alteration
INSTALL PIPING AND PLUMBING FIXTURES AS PER PLANS.
S00663974-P1
12/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/22/2023
Permit issued — Curb Cut
S00600711-S2-CC
11/21/2023
Filed — New Building
INSTALLATION OF 9' CURB CUT
S00600711-S2
10/31/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/20/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
09/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/15/2023
Permit issued — Structural
S00600711-I1-GC-CX
08/07/2023
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
08/07/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
07/31/2023
Filed — New Building
INSTALLATION OF 9' CURB CUT
S00600711-P1
07/31/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
05/04/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2022
Permit issued — Construction Fence
S00663245-I1-FN
09/07/2022
Permit issued — Earth Work
S00600711-I1-GC-CX
08/23/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/11/2022
Permit issued — Earth Work
S00600711-I1-GC-CX
02/28/2022
Permit issued — Construction Fence
S00663245-I1-FN
01/25/2022
Filed — Alteration
INSTALL PIPING AND PLUMBING FIXTURES AS PER PLANS.
S00663974-I1
01/14/2022
Filed — Alteration
S00663245-I1
10/26/2021
Filed — New Building
INSTALLATION OF 9' CURB CUT
S00600711-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC12/20/2023
DOB NOWCurb CutSigned-offMAXIMUM CONTRACTING INC11/22/2023
DOB NOWStructuralPermit IssuedMAXIMUM CONTRACTING INC09/15/2023
DOB NOWConstruction FenceSigned-offMAXIMUM CONTRACTING INC09/07/2022
DOB NOWEarth WorkPermit IssuedMAXIMUM CONTRACTING INC09/07/2022
DOB NOWEarth WorkPermit IssuedMAXIMUM CONTRACTING INC03/11/2022
DOB NOWConstruction FenceSigned-offMAXIMUM CONTRACTING INC02/28/2022
2 projects · most recent 10/04/2023
General Wiring
FiledStatusContractorScope
10/04/2023CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
04/17/2023CancelledA. J. CARUSO ELECTRICAL IGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/05/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
12/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/20/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
09/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
08/07/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
08/07/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
08/07/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
08/07/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
08/07/2023Structural Wood FrameWILLIAM MONTAGUEprogress
08/07/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
08/07/2023Footing and FoundationWILLIAM MONTAGUEprogress
08/07/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
08/07/2023FinalWILLIAM MONTAGUEprogress
08/07/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
08/07/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
08/07/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
08/07/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
08/07/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
08/07/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
08/07/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
08/07/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
08/07/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
08/07/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
08/07/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
07/31/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
07/31/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
07/31/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
07/31/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
07/31/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
Latest 25 of 40.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00663245-I1Request digital key ↗
08/24/2026S00663974-P1Request digital key ↗
08/24/2026S00663974-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
12/01/2023540190522Open ↗
08/03/2021540190522Open ↗
08/02/2021540190522Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
03/26/2024540190522Open ↗
08/25/2021540190522Open ↗
11/19/2020540190522Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026S00600711-P1Open ↗
08/13/2026S00600711-S2Open ↗
08/13/2026S00600711-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00600711-P1Open ↗
08/13/2026S00600711-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00600711-I1Open ↗
08/13/2026S00600711-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00600711-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026S00663974-I1Open ↗
08/24/2026S00663974-P1Open ↗
08/22/2026S00600711-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S00600711-I1Open ↗
09/01/2026S00600711-I1Open ↗
08/22/2026S00600711-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S00600711-I1Open ↗
09/01/2026S00600711-I1Open ↗
08/22/2026S00600711-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/19/2020540190522Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/19/2020540190522Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00600711-P1Open ↗
08/13/2026S00600711-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00600711-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00600711-P1Open ↗
08/13/2026S00600711-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00600711-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00600711-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00600711-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00600711-I1Open ↗
▸Inspections & Test Reports6
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
08/25/2021540190522Open ↗
11/19/2020540190522Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S00600711-P1Open ↗
08/13/2026S00600711-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00600711-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00600711-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff4
03/26/2024540190522Open ↗
03/26/2024540190522Open ↗
08/25/2021540190522Open ↗
Showing 3 of 4 on file for this type
▸BISPARKE APPROVAL TO REMOVE TREES1
12/14/2023540190522Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/19/2020540190522Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification2
08/22/2026S00600711-P1Open ↗
08/22/2026S00600711-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00600711-P1Open ↗
08/13/2026S00600711-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00600711-P1Open ↗
08/13/2026S00600711-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/25/2021540190522Open ↗
▸BISUPDATED WAIVER FROM DOT FOR DISTANCE TOUTILITY POLE1
03/26/2024540190522Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
08/16/2021540190522Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/26/2024540190522Open ↗
▸BISWAIVER OF 7 FT. CLEARANCE TO EXISTING TREE1
08/16/2021540190522Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00600711-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00600711-I1Open ↗