← Back
Public elementary, junior or senior high
P.S. 67 Charles A. Dorsey
85 ST EDWARDS STREET · BIN 3332507
💬 Discuss this project
1939Year Built
5Stories
W1Building Class
R6Zoning
121,000 sfGross Floor Area
1Units
LL97 Covered7 Open Violations 2 unresolved · 5 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 111,995 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof14p · 2 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 510p · 2 filings · 20 docs
Floor 410p · 2 filings · 20 docs
Floor 37p · 1 filing · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION2503/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
DOE K067 040503/22/2026
DEPT OF EDUCATION PS 67903/22/2026
DOE PS 067 040103/22/2026
DOE 040403/22/2026
DEPT OF EDUC. PS 67203/22/2026
DEPT OF EDUCATION P.S.067403/22/2026
DOE PS 67 040303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LHP ARCHITECTS, PLLC407/14/2026
WSP406/18/2026
SHENOY ENGINEERING, PC206/02/2026
KS ENGINEERS, PC201/17/2024
SHENOY ENGINEERING, P.C.201/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASO ASSOCIATES2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCIS RICHARDSElectrical803/21/2026
GEMINI ELECTRIC CO., INC.Electrical203/22/2026
A & S ELECTRIC INC.Electrical103/22/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
CORE ELECTRIC MEP INDS LLElectrical103/22/2026
GIOVANNI DITURIElectrical103/21/2026
Building Lifecycle
All (128)Filed (14)Violation (60)Objection (24)Special Inspection (30)
08/17/2026
Objection resolved — Resolved
07/20/2026
Special inspection requirement — Air barrier - visual inspection
07/20/2026
Special inspection requirement — Insulation placement and R values
07/20/2026
Special inspection requirement — Masonry
07/20/2026
Special inspection requirement — Post-installed Anchors
07/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
07/20/2026
Special inspection requirement — Concrete - Cast-In-Place
07/20/2026
Special inspection requirement — Fenestration air leakage
07/14/2026
Filed — Alteration
PARAPET REPAIRS TO INCLUDE REPLACEMENT IF DAMAGED COPING, BASE AND CAP FLASHING, AND MORTAR JOINTS.BASEMENT WATERPROOFING INCLUDING REMOVAL OF DAMAGED FLOOR FINISHES, REPAIR OF DETERIORATED FOUNDATION WALLS, STRUCTURAL BEAMS, AND COLUMNS. ROOF REPLACEMENT
B01339810-P4
07/03/2026
Objection resolved — Addressed
06/26/2026
Objection raised — Other
06/18/2026
Filed — Alteration
PARAPET REPAIRS TO INCLUDE REPLACEMENT IF DAMAGED COPING, BASE AND CAP FLASHING, AND MORTAR JOINTS.BASEMENT WATERPROOFING INCLUDING REMOVAL OF DAMAGED FLOOR FINISHES, REPAIR OF DETERIORATED FOUNDATION WALLS, STRUCTURAL BEAMS, AND COLUMNS. ROOF REPLACEMENT
B01339810-P2
06/03/2026
Objection raised — Other
06/02/2026
Filed — Alteration
PARAPET REPAIRS TO INCLUDE REPLACEMENT IF DAMAGED COPING, BASE AND CAP FLASHING, AND MORTAR JOINTS.BASEMENT WATERPROOFING INCLUDING REMOVAL OF DAMAGED FLOOR FINISHES, REPAIR OF DETERIORATED FOUNDATION WALLS, STRUCTURAL BEAMS, AND COLUMNS. ROOF REPLACEMENT
B01339810-P3
06/02/2026
Filed — Alteration
PARAPET REPAIRS TO INCLUDE REPLACEMENT IF DAMAGED COPING, BASE AND CAP FLASHING, AND MORTAR JOINTS.BASEMENT WATERPROOFING INCLUDING REMOVAL OF DAMAGED FLOOR FINISHES, REPAIR OF DETERIORATED FOUNDATION WALLS, STRUCTURAL BEAMS, AND COLUMNS. ROOF REPLACEMENT
B01339810-P1
05/21/2026
Special inspection requirement — Post-installed Anchors
05/21/2026
Special inspection requirement — Insulation placement and R values
05/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/21/2026
Special inspection requirement — Concrete - Cast-In-Place
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/21/2026
Special inspection requirement — Masonry
05/21/2026
Special inspection requirement — Fenestration air leakage
05/21/2026
Special inspection requirement — Air barrier - visual inspection
05/21/2026
Special inspection requirement — Concrete - Cast-In-Place
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
05/21/2026
Special inspection requirement — Final
03/31/2026
Objection resolved — Addressed
03/21/2026
Objection resolved — Addressed
03/05/2026
Violation issued (ECB, open)
Construction
03/05/2026
Violation issued (ECB, open)
Construction
03/05/2026
Violation issued (ECB, open)
Construction
03/05/2026
Violation issued (ECB, closed)
Construction
02/27/2026
Objection resolved — Addressed
01/07/2026
Objection raised — Other
12/30/2025
Objection raised — Other
12/30/2025
Objection raised — Other
12/29/2025
Filed — Alteration
PARAPET REPAIRS TO INCLUDE REPLACEMENT IF DAMAGED COPING, BASE AND CAP FLASHING, AND MORTAR JOINTS.BASEMENT WATERPROOFING INCLUDING REMOVAL OF DAMAGED FLOOR FINISHES, REPAIR OF DETERIORATED FOUNDATION WALLS, STRUCTURAL BEAMS, AND COLUMNS. ROOF REPLACEMENT
B01339810-S2
12/29/2025
Filed — Alteration
PARAPET REPAIRS TO INCLUDE REPLACEMENT IF DAMAGED COPING, BASE AND CAP FLASHING, AND MORTAR JOINTS.BASEMENT WATERPROOFING INCLUDING REMOVAL OF DAMAGED FLOOR FINISHES, REPAIR OF DETERIORATED FOUNDATION WALLS, STRUCTURAL BEAMS, AND COLUMNS. ROOF REPLACEMENT
B01339810-S1
12/29/2025
Special inspection requirement — Concrete - Cast-In-Place
12/28/2025
Filed — Alteration
PARAPET REPAIRS TO INCLUDE REPLACEMENT IF DAMAGED COPING, BASE AND CAP FLASHING, AND MORTAR JOINTS.BASEMENT WATERPROOFING INCLUDING REMOVAL OF DAMAGED FLOOR FINISHES, REPAIR OF DETERIORATED FOUNDATION WALLS, STRUCTURAL BEAMS, AND COLUMNS. ROOF REPLACEMENT
B01339810-I1
12/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/24/2025
Special inspection requirement — Final
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_ORDER, closed)
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDA TECH ELECTRIC ENTERPRIS12/27/2017
BISOTISSUEDA TECH ELECTRIC ENTERPRI*01/27/2016
BISOTISSUEDE ELECTRICAL CONTRACTING04/29/2015
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/22/2015
BISOTISSUEDG.S.H. ELECTRIC INC09/12/2014
BISOTISSUEDE ELECTRICAL CONTRACTING08/29/2014
BISEQISSUEDADAM'S EUROPEAN CONTRACTING04/02/2013
BISOTISSUEDADAM'S EUROPEAN CONTRACTING04/02/2013
BISEQISSUEDADAM'S EUROPEAN CONTRACTING04/02/2013
BISEQISSUEDADAM'S EUROPEAN CONTRACTING04/02/2013
BISPLISSUEDVARSITY PLBG AND HTG INC09/20/2012
BISOTISSUEDADAM'S EUROPEAN CONTRACTING09/20/2012
BISEQISSUEDADAM'S EUROPEAN CONTRACTING09/18/2012
BISEQISSUEDADAM'S EUROPEAN CONTRACTING09/18/2012
BISEQISSUEDADAM'S EUROPEAN CONTRACTING09/18/2012
BISEQISSUEDSWING STAGING INCORPORATED11/30/2007
BISOTISSUEDVARDARIS TECH INC06/07/2007
BISPLISSUEDEAGLE 1 MECHANICAL, INC06/07/2007
BISEQISSUEDVARDARIS TECH INC06/06/2007
BISEQISSUEDSWING STAGING INCORPORATED05/29/2007
BISPLISSUEDEAGLE 1 MECHANICAL, INC12/13/2006
BISOTISSUEDVARDARIS TECH INC11/29/2006
BISPLISSUEDFORSYTHE P&H CORP01/20/2006
BISFPISSUEDFIREMASTERS01/12/2006
BISOTISSUEDNYC DEPARTMENT OF EDUCATION08/23/2005
BISPLISSUEDA BERWIND PLUMBING & HEATING CO11/21/2002
BISOTISSUEDKOMI CONSTRUCTION INCORPORATED11/21/2002
BISEQISSUEDCLARK & WILKINS INDUSTRIES INC10/22/2002
BISEQISSUEDCLARK & WILKINS INDUSTRIES INC01/07/2002
BISOTISSUEDKOMI CONSTRUCTION INCORPORATED11/05/2001
BISPLISSUEDA BERWIND PLUMBING & HEATING CO11/05/2001
BISPLISSUEDPROGRAM UNLIMITED PL. & HEATING06/19/2000
BISEQISSUEDREGIONAL SCAFFOLD AND HOISTING05/16/2000
BISEQISSUEDNEW TECH RESTORATION01/27/2000
BISEQISSUEDREGIONAL SCAFFOLD AND HOISTING01/10/2000
BISOTISSUEDNEW-TECH RESTORATION CORP12/01/1999
BISEQISSUEDNEW TECH RESTORATION12/01/1999
BISEQISSUEDSAFWAY STEEL PRODUCTS, INC.11/18/1999
BISPLISSUEDPROGRAM UNLIMITED PL. & HEATING11/18/1998
BISFBISSUEDMICHAEL HASS05/30/1997
+ 6 more permits on file
1 project · most recent 01/17/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/17/2024——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKA-A36KA6 920 CFM · Vrf Indoor ×1
PU2-HA36NHA5 920 CFM · Heat Pump Outdoor ×1
Ventilation
Greenheck USF-12 1,250 CFM · Exhaust Fan ×2
CSP-A390 100 CFM · Exhaust Fan ×1
CSP-A710 300 CFM · Exhaust Fan ×1
G-100HP 400 CFM · Exhaust Fan ×1
GB-180HP 1,100 CFM · Exhaust Fan ×1
USF-4 400 CFM · Exhaust Fan ×1
— USF-13 1,425 CFM ×1
2 projects · most recent 07/14/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/14/2026——Storm, Water/Sanitary
01/17/2024——Storm, Water/Sanitary
15 projects · most recent 06/11/2025
General Wiring
FiledStatusContractorScope
06/11/2025CompleteCHARAN ELEC'L ENTERP'S IN—
11/11/2024CompleteEVEREST ELECTRIC CORP—
11/27/2023CompleteGEMINI ELECTRIC CO., INC.—
10/22/2023CompleteCORE ELECTRIC MEP INDS LLGeneral Wiring
05/25/2023CompleteGEMINI ELECTRIC CO., INC.—
01/23/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
11/23/2022CompleteABM ELECTRIC, INC—
11/02/2022CompleteCHARAN ELEC'L ENTERP'S IN—
11/17/2021CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
06/29/2021Permit IssuedA & S ELECTRIC INC.General Wiring
09/09/2020CompleteCHARAN ELEC'L ENTERP'S IN—
09/03/2020CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
11/12/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
08/13/2018CancelledCHARAN ELEC'L ENTERP'S IN—
05/16/2018CompletePRINCE ELECTRIC CORP.—
2 projects · most recent 07/14/2026
Concrete Steel Masonry
FiledStatusContractorScope
07/14/2026——Concrete
01/17/2024——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
07/20/2026Concrete - Cast-In-Place—special
07/20/2026Post-installed Anchors—special
07/20/2026Fenestration air leakage—energy_progress
07/20/2026Insulation placement and R values—energy_progress
07/20/2026Fenestration and door U-factor and product ratings—energy_progress
07/20/2026Air barrier - visual inspection—energy_progress
07/20/2026Energy Code Compliance Inspections—progress
07/20/2026Structural Stability – Alterations of existing buildings—special
07/20/2026Masonry—special
05/21/2026Fenestration air leakage—energy_progress
05/21/2026Structural Stability – Alterations of existing buildings—special
05/21/2026Structural Stability – Alterations of existing buildings—special
05/21/2026Post-installed Anchors—special
05/21/2026Masonry—special
05/21/2026Concrete - Cast-In-Place—special
05/21/2026Concrete - Cast-In-Place—special
05/21/2026Fenestration and door U-factor and product ratings—energy_progress
05/21/2026Final—progress
05/21/2026Air barrier - visual inspection—energy_progress
05/21/2026Insulation placement and R values—energy_progress
05/21/2026Energy Code Compliance Inspections—progress
12/29/2025Concrete - Cast-In-Place—special
12/24/2025Final—progress
12/24/2025Structural Stability – Alterations of existing buildings—special
05/03/2024Exterior lighting power—energy_progress
Latest 25 of 81.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026B00965477-S3Request digital key ↗
08/26/2026B00965477-S2Request digital key ↗
08/26/2026B00965477-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00965477-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026B00965477-S2Open ↗
08/26/2026B00965477-S1Open ↗
08/26/2026B00965477-I1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00965477-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B00965477-S4Open ↗
08/13/2026B00965477-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00965477-S4Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/15/2026B01339810-P2Open ↗
08/14/2026B01339810-P1Open ↗
08/13/2026B01339810-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)10
08/13/2026B01339810-S1Open ↗
08/13/2026B01339810-I1Open ↗
08/13/2026B00965477-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/15/2026B01339810-P2Open ↗
08/14/2026B01339810-P1Open ↗
08/13/2026B00965477-S1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents19
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal12
08/15/2026B01339810-P2Open ↗
08/14/2026B01339810-P1Open ↗
08/13/2026B00965477-S6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026B01339810-S2Open ↗
08/13/2026B01339810-S1Open ↗
08/13/2026B01339810-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B00965477-S1Open ↗
08/13/2026B00965477-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00965477-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00965477-I1Open ↗