← Back
Parochial school, yeshiva
79 WALWORTH STREET
BROOKLYN · BIN 3048480
💬 Discuss this project
1931Year Built
1Stories
W2Building Class
M1-1Zoning
10,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Parochial school, yeshiva · Owner of record: BAIS RUCHEL BEDFORD INC · 10,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 1Under Construction14p · 2 filings · 20 docs
CellarUnder Construction14p · 1 filing · 20 docs
1 job · most recent 08/06/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2025Permit IssuedBOINAH SATMAR LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MUZ-D36NA2-U1 33,200 BTU · Condensing Unit ×2
PUHY-EP72TNU 72,000 BTU · Vrf Outdoor ×2
MUZ-D30NA2-U1 90,700 BTU · Condensing Unit ×1
MUZ-GE15NA 14,000 BTU · Condensing Unit ×1
PUMY-P36NKMU 36,000 BTU · Vrf Outdoor ×1
RXTQ48TAVJUA 45,500 BTU · Vrf Outdoor ×1
Ventilation
Panasonic FV-04VE1 40 CFM · Erv ×1
Rheem RRNL-C060CK10E 2,000 CFM · Rooftop Unit ×1
2 jobs · most recent 08/06/2025
Water/Sanitary
FiledStatusContractorScope
08/06/2025Signed-offQUALITY PIPING, INCWater/Sanitary
01/03/2023——Water/Sanitary
3 jobs · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025CompleteABZ ELECTRIC INC—
02/06/2025CompleteABZ ELECTRIC INCGeneral Wiring
01/15/2025CompleteCYM ELECTRICAL CONTRACTOR1 meters, 1 new_meters
Building Lifecycle
All (109)Filed (8)Permit Issued (5)Signed Off (2)Violation (24)Inspection (11)Objection (29)Special Inspection (30)
06/24/2026
Permit issued — Mechanical Systems
B01109017-S3-MS
02/19/2026
Violation issued (FDNY_ORDER, closed)
02/19/2026
Violation issued (FDNY_ORDER, closed)
02/19/2026
Violation issued (FDNY_ORDER, closed)
01/16/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/11/2025
Permit issued — General Construction
B01109017-I1-GC
11/18/2025
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01109017-I1.
B01109017-S2
10/31/2025
Objection resolved — Addressed
10/23/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/16/2025
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01109017-I1.
B01109017-S1
09/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/16/2025
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
09/10/2025
Objection resolved — Addressed
09/08/2025
Permit issued — General Construction
B01109017-I1-GC
09/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/04/2025
Objection resolved — Addressed
08/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/29/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/29/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/29/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/29/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
08/29/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
08/29/2025
Special inspection requirement — Metering
FAHAD FATEH
08/08/2025
Objection raised — Scope
08/08/2025
Objection raised — Cost
08/08/2025
Objection raised — Zoning
08/08/2025
Objection raised — Mechanical
08/08/2025
Objection raised — Scope
08/08/2025
Objection raised — Zoning
08/06/2025
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01109017-I1.
B01109017-S3
08/05/2025
Permit issued — Sprinklers
B01109017-S2-EW-SP
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/11/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
06/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
06/10/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
06/10/2025
Special inspection requirement — Shutoff dampers
SHAHRIAR QUAYYUM
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/10/2025
Special inspection requirement — Heating Systems
SHAHRIAR QUAYYUM
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
06/05/2025
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01109017-I1.
B01109017-P1
06/04/2025
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01109017-I1.
B01109017-P2
05/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/28/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/28/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/28/2025
Special inspection requirement — Metering
FAHAD FATEH
05/28/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
Latest 60 of 109 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTRAL UTA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOINAH SATMAR LLCGeneral Contractor307/08/2026
ABZ ELECTRIC INCElectrical103/22/2026
TRISTATE FIRE SPRINK INCFire Protection107/08/2026
NESS MECHANICAL P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616608/06/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBOINAH SATMAR LLC06/24/2026
DOB NOWGeneral ConstructionPermit IssuedBOINAH SATMAR12/11/2025
DOB NOWGeneral ConstructionPermit IssuedBOINAH SATMAR09/08/2025
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC08/05/2025
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC05/06/2025
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/16/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
09/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
08/29/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/29/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/29/2025Exterior lighting powerFAHAD FATEHenergy_progress
08/29/2025Interior lighting powerFAHAD FATEHenergy_progress
08/29/2025Maintenance informationFAHAD FATEHenergy_progress
08/29/2025Lighting controlsFAHAD FATEHenergy_progress
08/29/2025Permanent certificateFAHAD FATEHenergy_progress
08/29/2025MeteringFAHAD FATEHenergy_progress
06/11/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/11/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
06/11/2025Maintenance informationFAHAD FATEHenergy_progress
06/11/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/11/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/11/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/10/2025Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
06/10/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/10/2025HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
06/10/2025Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
06/10/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/10/2025Heating SystemsSHAHRIAR QUAYYUMspecial
06/10/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
06/10/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
05/28/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/28/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/28/2025Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 45.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/28/2026B08055482-I1Request digital key ↗
08/23/2026B01109017-I1Request digital key ↗
08/23/2026B01109017-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION8
12/03/2024321613893Open ↗
12/03/2024321611378Open ↗
11/29/2024322103264Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026B01109017-S3Open ↗
09/23/2026B01109017-S3Open ↗
09/01/2026B01109017-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026B01109017-S2Open ↗
08/23/2026B01109017-P2Open ↗
08/23/2026B01109017-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B01109017-S3Open ↗
09/01/2026B01109017-P2Open ↗
08/26/2026B01109017-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/16/2017321611378Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/25/2018321611378Open ↗
08/16/2017321611378Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026B01109017-P2Open ↗
08/13/2026B01109017-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01109017-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01109017-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026B01109017-S2Open ↗
08/23/2026B01109017-I1Open ↗
08/23/2026B01109017-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/16/2017321611378Open ↗
08/16/2017321613893Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
01/28/2022322103264Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
04/25/2018321613893Open ↗
04/25/2018321611378Open ↗
08/16/2017321611378Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
01/28/2022322103264Open ↗
08/16/2017321611378Open ↗
08/16/2017321613893Open ↗
▸BISADDITIONAL INFORMATION1
01/28/2022322103264Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/23/2026B01109017-I1Open ↗
08/23/2026B01109017-P2Open ↗
08/13/2026B08055482-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01109017-I1Open ↗