← Back
BuildNYC
Elevator apt, fireproof without stores
Douglass I (NYCHA)
850 COLUMBUS AVENUE · BIN 1079365
💬 Discuss this project
1958Year Built
17Stories
D3Building Class
R7-2Zoning
700,175 sfGross Floor Area
1,162Units
LL97 Covered10 Active Violations 9 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 628,400 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsGas piping replacement throughout building1 filing
RoofNYC Housing Authority18p · 6 filings · 20 docs
BulkheadNYC Housing Authority1p · 1 filing · 20 docs
Site & exteriorTemporary construction fence for Douglas Houses7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Thornton Tomasetti406/16/2026
Odc Associates211/01/2024
RKTB Architects310/25/2024
Self Propriety (MD A Islam)410/06/2024
Joel Phagoo P.E405/14/2024
Shenoy Engineering202/16/2024
Ikra Consulting303/25/2022
AK Consulting Services204/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Joel Phagoo P.E103/21/2026
Design 2147803/21/2026
Sharon Rader203/21/2026
AK Consulting Services1003/21/2026
Shenoy Engineering403/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold1707/08/2026
J & N Construction GroupScaffold807/08/2026
MNK EnterprisesScaffold603/21/2026
J & N Construction GroupGeneral Contractor506/28/2026
Zoria HousingScaffold307/08/2026
D.D.S. Mechanical PBG & HeatingPlumbing107/08/2026
Zoria HousingGeneral Contractor107/08/2026
Q.Y. ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP Engineers & Architects1438506/16/2026
Socotec Engineering4983211/01/2024
Joel Phagoo, PE2416102/20/2024
MT Group798202/16/2024
Building Lifecycle
All (131)Filed (26)Permit Issued (24)Signed Off (11)Facade (FISP) (15)Violation (14)Inspection (1)Objection (10)Special Inspection (30)
10/07/2026
Signed off — Alteration
HEREWITH FILING ROOFING REPLACEMENT LIMITED FACADE WORK AT BULKHEADS AS PER PLANS, INCLUDING REPLACEMENT OF BULKHEAD DOORS AND FRAMES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08014497-I1
06/23/2026
Special inspection requirement — Final
JAMES WILSON
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
06/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/23/2026
Special inspection requirement — Masonry
JAMES WILSON
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
06/16/2026
Filed — Alteration
HEREWITH FILING STRUCUTRAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M08014506-P3
03/02/2026
Permit issued — General Construction
M08014497-I1-GC
10/10/2025
Permit issued — Structural
M08014506-I1-ST
08/05/2025
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
M00346236-I1
07/29/2025
Signed off — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 850 COLUMBUS AVENUE , MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01055829-I1
07/28/2025
Signed off — Alteration
M01051454-I1
07/25/2025
Permit issued — Construction Fence
M01051454-I1-FN
05/06/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 850 COLUMBUS AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01056224-I1
02/24/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/16/2024
Permit issued — General Construction
M08014497-I1-GC
12/02/2024
Objection resolved — Addressed
11/27/2024
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
11/27/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES WILSON
11/27/2024
Special inspection requirement — Masonry
JAMES WILSON
11/27/2024
Special inspection requirement — Fenestration air leakage
JAMES WILSON
11/27/2024
Special inspection requirement — Insulation placement and R values
JAMES WILSON
11/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
11/27/2024
Special inspection requirement — Post-installed Anchors
JAMES WILSON
11/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
11/27/2024
Special inspection requirement — Final
JAMES WILSON
11/20/2024
Signed off — Alteration
Exterior wall and bulkhead roof repairs. no change to use, occupancy or egress.
M00994712-I1
11/13/2024
Objection resolved — Addressed
11/08/2024
Objection raised — Scope
11/08/2024
Objection raised — Scope
11/04/2024
Special inspection requirement — Final
TIMOTHY WEBB
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
11/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
11/04/2024
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
11/01/2024
Filed — Alteration
Exterior wall and bulkhead roof repairs. no change to use, occupancy or egress.
M00994712-P1
10/28/2024
Filed — Alteration
HEREWITH FILING STRUCUTRAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M08014506-P2
10/25/2024
Filed — Alteration
HEREWITH FILING ROOFING REPLACEMENT LIMITED FACADE WORK AT BULKHEADS AS PER PLANS, INCLUDING REPLACEMENT OF BULKHEAD DOORS AND FRAMES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08014497-P2
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
10/25/2024
Special inspection requirement — Masonry
JAMES WILSON
10/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
10/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/25/2024
Special inspection requirement — Final
JAMES WILSON
10/25/2024
Special inspection requirement — Preliminary
JAMES WILSON
10/22/2024
Special inspection requirement — Fenestration air leakage
JAMES WILSON
10/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES WILSON
10/22/2024
Special inspection requirement — Insulation placement and R values
JAMES WILSON
10/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
10/22/2024
Special inspection requirement — Masonry
JAMES WILSON
10/22/2024
Special inspection requirement — Post-installed Anchors
JAMES WILSON
10/06/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 850 COLUMBUS AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01056224-P1
09/10/2024
Permit issued — Plumbing
M00346236-I1-PL
09/06/2024
Permit issued — Suspended Scaffold
M01083591-I1-SC
09/02/2024
Filed — Alteration
M01083591-I1
08/08/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00885399-I1
08/08/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00885397-I1
07/24/2024
Signed off — Alteration
M01006407-I1
07/23/2024
Cycle 9 facade report submitted
07/23/2024
Cycle 9 facade report signed — UNSAFE
06/26/2024
Cycle 9 facade inspection completed
06/17/2024
Permit issued — Sidewalk Shed
M00885397-I1-SH
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group03/02/2026
DOB NOWStructuralPermit IssuedJ & N Construction Group10/10/2025
DOB NOWConstruction FenceSigned-offJ & N Construction Group07/25/2025
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group12/16/2024
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating09/10/2024
DOB NOWSuspended ScaffoldPermit IssuedJ&N Construction Group09/06/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/17/2024
DOB NOWConstruction FenceSigned-offZoria Housing06/14/2024
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group05/28/2024
DOB NOWSidewalk ShedSigned-offJ & N Construction Group05/28/2024
DOB NOWConstruction FenceSigned-offJ & N Construction Group05/21/2024
DOB NOWGeneral ConstructionSigned-offZoria Housing04/22/2024
DOB NOWSuspended ScaffoldSigned-offZoria Housing02/28/2024
DOB NOWConstruction FenceSigned-offZoria Housing06/09/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/09/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/09/2023
DOB NOWSidewalk ShedSigned-offRoma Scaffolding09/27/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/03/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding09/28/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/04/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding10/28/2020
DOB NOWSidewalk ShedSigned-offRoma Scaffolding09/30/2020
DOB NOWConstruction FenceSigned-offRoma Scaffolding11/14/2019
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/09/2019
BISOTISSUEDPhonex Construcion03/10/1999
BISPLISSUEDReyvin Plumbing & Heating03/10/1999
BISPLISSUEDV. C. Vitanza Sons11/04/1993
5 projects · most recent 07/03/2025
General Wiring
FiledStatusContractorScope
07/03/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
09/17/2024CompleteLit Mode Electrical Contg—
03/21/2024CompleteQ.Y. Electric—
03/15/2023CompleteQ.Y. Electric—
09/13/2019Permit IssuedRaiden Electric—
1 project · most recent 06/16/2026
Concrete
FiledStatusContractorScope
06/16/2026Permit IssuedJ & N Construction GroupConcrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/24/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
06/23/2026FinalJAMES WILSONprogress
06/23/2026Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
06/23/2026Tenant Protection Plan Compliance—special
06/23/2026MasonryJAMES WILSONspecial
06/23/2026Fire-Resistant Penetrations and JointsJAMES WILSONspecial
11/27/2024Energy Code Compliance InspectionsJAMES WILSONprogress
11/27/2024Fenestration and door U-factor and product ratingsJAMES WILSONenergy_progress
11/27/2024MasonryJAMES WILSONspecial
11/27/2024Fenestration air leakageJAMES WILSONenergy_progress
11/27/2024Insulation placement and R valuesJAMES WILSONenergy_progress
11/27/2024Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
11/27/2024Post-installed AnchorsJAMES WILSONspecial
11/27/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
11/27/2024FinalJAMES WILSONprogress
11/04/2024FinalTIMOTHY WEBBprogress
11/04/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
11/04/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
11/04/2024MasonryALEXIS SCHLESSINGERMANspecial
10/25/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
10/25/2024MasonryJAMES WILSONspecial
10/25/2024Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
10/25/2024Tenant Protection Plan Compliance—special
10/25/2024FinalJAMES WILSONprogress
10/25/2024PreliminaryJAMES WILSONprogress
10/22/2024Fenestration air leakageJAMES WILSONenergy_progress
Latest 25 of 57.
▾Documents — 150 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch19
08/31/2026M00885399-I1Request digital key ↗
08/31/2026M00885399-P1Request digital key ↗
08/28/2026M01006407-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00234510-I1Request digital key ↗
09/05/2026M00234510-P2Request digital key ↗
08/15/2026M00234510-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00263820-I1Request digital key ↗
08/15/2026M00263820-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00346236-P1Request digital key ↗
08/15/2026M00346236-I1Request digital key ↗
▸Seals & Professional Certifications59
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/05/2026M00263820-I1Open ↗
09/05/2026M00234510-I1Open ↗
09/05/2026M00234510-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
10/11/2026M00346236-I1Open ↗
09/02/2026M08014506-P2Open ↗
09/02/2026M08014506-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026M08014506-P2Open ↗
09/02/2026M08014506-P2Open ↗
08/29/2026M00994712-I1Open ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan6
09/05/2026M00263820-I1Open ↗
08/15/2026M00346236-I1Open ↗
08/13/2026M00234510-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026M08014497-I1Open ↗
08/25/2026M08014506-I1Open ↗
08/25/2026M08014506-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026M00346236-I1Open ↗
08/13/2026M00994712-I1Open ↗
▸Approvals, Objections & Sign-offs45
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
09/05/2026M00263820-I1Open ↗
09/05/2026M00234510-P1Open ↗
09/05/2026M00234510-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
09/05/2026M00263820-I1Open ↗
08/27/2026M00994712-I1Open ↗
08/25/2026M08014497-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/15/2026M00346236-I1Open ↗
08/13/2026M00994712-I1Open ↗
08/13/2026M00234510-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00994712-I1Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/25/2026M08014497-I1Open ↗
08/25/2026M08014497-P1Open ↗
08/13/2026M08014497-P2Open ↗
▸DOB NOWCalculations2
08/13/2026M01006407-I1Open ↗
08/13/2026M01083591-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01083591-I1Open ↗
08/13/2026M01006407-I1Open ↗