← Back
Gas or electric utility
8424 DITMAS AVENUE
BROOKLYN · BIN 3337435
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
6 Open Violations 0 unresolved · 6 paperwork only ▸FDNY Report ↗
Gas or electric utility · 374,407 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 34p · 3 filings · 20 docs
Floor 2Under Construction25p · 2 filings · 17 docs
Floor 1Under Construction2p · 2 filings · 17 docs
Mezzanine1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NATIONAL GRID2208/25/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OLA CONSULTING ENGINEERS, PC306/24/2026
ANTONIO LEO ARCHITECT406/16/2026
JOEL PHAGOO P.E. PLLC305/08/2023
WILLIAM F. COLLINS ARCHITECTS103/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.203/21/2026
A1 EXPEDITING SERVICE603/21/2026
CONSTRUCTION PERMIT SERVICES603/21/2026
GREEN LIGHT EXPEDITING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VERICON CONSTRUCTION COGeneral Contractor608/25/2026
H.M. HUGHES CO. INCGeneral Contractor507/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor407/08/2026
AARON PLBG AND MECH SYSTPlumbing108/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423106/24/2026
WB ENGINEERING533102/11/2025
JOEL PHAGOO ,PE, PLLC2416105/08/2023
Building Lifecycle
All (62)Filed (11)Permit Issued (12)Signed Off (6)Objection (6)Special Inspection (27)
08/24/2026
Permit issued — Mechanical Systems
B01380976-S1-MS
08/24/2026
Permit issued — Plumbing
B01380976-S2-PL
08/21/2026
Permit issued — General Construction
B01380976-I1-GC
06/24/2026
Filed — Alteration
PROPOSED MS WORK INCLUDES (6) NEW AHU'S, ASSOCIATED DUCTS, EXHAUST FANS, AND HVAC PIPING ON 2ND FLOOR AS PER PLANS
B01380976-S1
06/24/2026
Filed — Alteration
PROPOSED MS WORK INCLUDES (6) NEW AHU'S, ASSOCIATED DUCTS, EXHAUST FANS, AND HVAC PIPING ON 2ND FLOOR AS PER PLANS
B01380976-S2
06/16/2026
Filed — Alteration
PROPOSED MS WORK INCLUDES (6) NEW AHU'S, ASSOCIATED DUCTS, EXHAUST FANS, AND HVAC PIPING ON 2ND FLOOR AS PER PLANS
B01380976-I1
04/01/2026
Special inspection requirement — Maintenance information
Young Suh
03/31/2026
Special inspection requirement — Final
Young Suh
03/31/2026
Special inspection requirement — Mechanical Systems
Young Suh
03/31/2026
Special inspection requirement — Lighting controls
Young Suh
03/31/2026
Special inspection requirement — Interior lighting power
Young Suh
03/31/2026
Special inspection requirement — Final
Young Suh
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
03/31/2026
Special inspection requirement — Shutoff dampers
Young Suh
03/31/2026
Special inspection requirement — Maintenance information
Young Suh
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
12/31/2025
Signed off — Alteration
Replacement of ceiling diffusers and return registers from 1st to 3rd floors as per plans. No change in use, egress, or occupancy.
B01149536-S1
12/30/2025
Signed off — Alteration
Renovation of 1st through 3rd floors and replacing roofing material of entry canopy on roof as per plans. No change in use,egress, or occupancy.
B01200012-I1
04/10/2025
Permit issued — General Construction
B01200012-I1-GC
04/07/2025
Filed — Alteration
Renovation of 1st through 3rd floors and replacing roofing material of entry canopy on roof as per plans. No change in use,egress, or occupancy.
B01200012-I1
03/31/2025
Permit issued — Mechanical Systems
B01149536-S1-MS
03/24/2025
Special inspection requirement — Final
Antonio Leo
03/24/2025
Special inspection requirement — Lighting controls
David Bonifacic
03/24/2025
Special inspection requirement — Interior lighting power
David Bonifacic
02/20/2025
Objection resolved — Addressed
02/19/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Scope
02/18/2025
Objection raised — Admin
02/18/2025
Objection raised — Scope
02/12/2025
Objection raised — Mechanical
02/11/2025
Filed — Alteration
Replacement of ceiling diffusers and return registers from 1st to 3rd floors as per plans. No change in use, egress, or occupancy.
B01149536-S1
02/10/2025
Filed — Alteration
Replacement of ceiling diffusers and return registers from 1st to 3rd floors as per plans. No change in use, egress, or occupancy.
B01149536-I1
12/02/2024
Special inspection requirement — Interior lighting power
David Bonifacic
12/02/2024
Special inspection requirement — Lighting controls
David Bonifacic
12/02/2024
Special inspection requirement — Final
Antonio Leo
12/02/2024
Special inspection requirement — Final
Matthew Amicone
12/02/2024
Special inspection requirement — Mechanical Systems
David Bonifacic
11/12/2024
Signed off — Alteration
FILING FOR INTERIOR RENOVATION OF 2ND FLOOR "NATIONAL GRID CMS" OFFICE AS PER PLANS SUBMITTED HEREWITH.
B01080096-I1
09/06/2024
Permit issued — General Construction
B01080096-I1-GC
07/31/2024
Filed — Alteration
FILING FOR INTERIOR RENOVATION OF 2ND FLOOR "NATIONAL GRID CMS" OFFICE AS PER PLANS SUBMITTED HEREWITH.
B01080096-I1
07/12/2024
Special inspection requirement — Final
Antonio Leo
03/05/2024
Permit issued — General Construction
B00454226-I1-GC
01/05/2024
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00869612-I1
01/05/2024
Signed off — Alteration
B07996000-I1
10/27/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B07995869-I1
05/08/2023
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00869612-I1
05/08/2023
Permit issued — Supported Scaffold
B00869612-I1-SF
05/08/2023
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
03/23/2023
Permit issued — General Construction
B00454226-I1-GC
09/01/2022
Permit issued — Sidewalk Shed
B07995869-I1-SH
09/01/2022
Permit issued — Protection and Mechanical Methods
B07996000-I1-PM
08/31/2022
Filed — Alteration
B07996000-I1
08/31/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B07995869-I1
03/29/2022
Permit issued — General Construction
B00454226-I1-GC
03/08/2022
Filed — Alteration
FACADE REPAIRS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00454226-I1
01/11/2022
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
01/11/2022
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
01/11/2022
Special inspection requirement — Air barrier - visual inspection
EUGENE BIFULCO
01/11/2022
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedVERICON CONSTRUCTION CO08/24/2026
DOB NOWPlumbingPermit IssuedAARON PLBG AND MECH SYST08/24/2026
DOB NOWGeneral ConstructionPermit IssuedVERICON CONSTRUCTION CO08/21/2026
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO04/10/2025
DOB NOWMechanical SystemsSigned-offVERICON CONSTRUCTION CO03/31/2025
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO09/06/2024
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC03/05/2024
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY05/08/2023
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC03/23/2023
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY09/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offAKM CONSTRUCTION NY09/01/2022
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC03/29/2022
BIS—ISSUEDACTION INDUSTRIES INC.07/17/1996
BISEQISSUEDACTION INDUSTRIES INC.07/17/1996
BISPLISSUEDAZTEC PLBG & HTG CORP10/31/1995
BISOTISSUEDBID-RITE INDUSTRIES INC.08/30/1995
BISSDISSUEDMEDCO PLUMBING INC.07/12/1995
BISPLISSUEDAZTEC PLBG & HTG CORP06/01/1995
BISBLISSUEDAZTEC PLBG & HTG CORP06/01/1995
BISSPISSUEDUPRIGHT FIRE PROTCTN LLC06/01/1995
BISEQISSUEDACTION DEMOLITION INC11/22/1994
BIS—ISSUEDBID-RITE INDUSTRIES INC11/22/1994
1 project · most recent 02/11/2025
Others
FiledStatusContractorScopeMake / Model / Capacity
02/11/2025Signed-offVERICON CONSTRUCTION COOthers
Other
N/A N/A ×1
1 project · most recent 06/24/2026
Water/Sanitary
FiledStatusContractorScope
06/24/2026Permit IssuedAARON PLBG AND MECH SYSTWater/Sanitary
5 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedACM ELECTRIC CORPORATIONGeneral Wiring
03/30/2026Permit IssuedSCHLESINGER ELECT'L CONTR2 meters, 2 new_meters
03/14/2025CompleteACM ELECTRIC CORPORATIONGeneral Wiring
11/05/2024CompleteACM ELECTRIC CORPORATIONGeneral Wiring
08/26/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
04/01/2026Maintenance informationYoung Suhenergy_progress
03/31/2026FinalYoung Suhprogress
03/31/2026Mechanical SystemsYoung Suhspecial
03/31/2026Lighting controlsYoung Suhenergy_progress
03/31/2026Interior lighting powerYoung Suhenergy_progress
03/31/2026FinalYoung Suhprogress
03/31/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
03/31/2026Shutoff dampersYoung Suhenergy_progress
03/31/2026Maintenance informationYoung Suhenergy_progress
03/31/2026Energy Code Compliance InspectionsYoung Suhprogress
03/31/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
03/24/2025FinalAntonio Leoprogress
03/24/2025Lighting controlsDavid Bonifacicenergy_progress
03/24/2025Interior lighting powerDavid Bonifacicenergy_progress
12/02/2024Interior lighting powerDavid Bonifacicenergy_progress
12/02/2024Lighting controlsDavid Bonifacicenergy_progress
12/02/2024FinalAntonio Leoprogress
12/02/2024FinalMatthew Amiconeprogress
12/02/2024Mechanical SystemsDavid Bonifacicspecial
07/12/2024FinalAntonio Leoprogress
05/08/2023Post-installed AnchorsJOEL PHAGOOspecial
01/11/2022Fenestration air leakageEUGENE BIFULCOenergy_progress
01/11/2022Energy Code Compliance InspectionsEUGENE BIFULCOprogress
01/11/2022Air barrier - visual inspectionEUGENE BIFULCOenergy_progress
01/11/2022Fenestration areasEUGENE BIFULCOenergy_progress
Latest 25 of 27.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/28/2026B07996000-I1Request digital key ↗
08/28/2026B07995869-I1Request digital key ↗
08/27/2026B00869612-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/31/2026B00454226-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
11/18/2020300381780Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B01380976-S2Open ↗
08/30/2026B01080096-I1Open ↗
08/30/2026B01149536-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B07996000-I1Open ↗
08/22/2026B01149536-S1Open ↗
08/22/2026B01149536-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B00869612-I1Open ↗
08/28/2026B01380976-S1Open ↗
08/28/2026B01149536-S1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/16/2026B01380976-S1Open ↗
08/16/2026B01380976-I1Open ↗
08/16/2026B01380976-S2Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00454226-I1Open ↗