← Back
BuildNYC
BRONX
851 METCALF AVENUE
BRONX · BIN 2131096
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSoundview Recreation Center1 filing · 20 docs
Floor 3Soundview Recreation Center1 filing · 20 docs
Floor 2Soundview Recreation Center1 filing · 20 docs
Floor 1Soundview Recreation Center2 filings · 20 docs
CellarSoundview Recreation Center1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Parks and Recreation2403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Snohetta211/18/2025
Legacy Engineers409/19/2025
LERA Consulting Structural Engineering207/29/2025
Munoz Engineering306/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code2403/21/2026
Building Lifecycle
All (73)Filed (12)Objection (36)Special Inspection (25)
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Resolved
03/03/2026
Objection resolved — Resolved
03/03/2026
Objection resolved — Addressed
02/03/2026
Objection raised — Structural
01/21/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Admin
01/09/2026
Objection resolved — Addressed
01/09/2026
Objection resolved — Resolved
01/09/2026
Objection resolved — Addressed
01/09/2026
Objection resolved — Addressed
01/09/2026
Objection resolved — Addressed
12/18/2025
Objection raised — Cost
12/02/2025
Objection raised — Inspections
11/18/2025
Filed — No Work
X01273853-I1
11/17/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Fire_Protection
10/15/2025
Objection raised — Fire_Protection
09/19/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-Z4
08/29/2025
Objection raised — Admin
08/28/2025
Objection raised — Admin
08/19/2025
Special inspection requirement — Public Assembly Emergency Lighting
08/15/2025
Objection raised — Admin
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Energy
07/31/2025
Objection raised — Energy
07/29/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-S2
07/29/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-S1
07/24/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
07/24/2025
Special inspection requirement — Wood – Seismic Resistance
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/09/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-S4
07/09/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-S3
06/26/2025
Objection raised — Other
06/20/2025
Objection raised — Admin
06/20/2025
Objection raised — Other
06/20/2025
Objection raised — Admin
06/20/2025
Objection raised — Scope
06/18/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-Z3
06/13/2025
Objection raised — Structural
06/13/2025
Objection raised — Zoning
06/13/2025
Objection raised — Admin
06/05/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-S9
06/05/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-S8
06/05/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-Z2
06/02/2025
Objection raised — Other
06/02/2025
Objection raised — Energy
05/30/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-Z1
05/08/2025
Filed — New Building
FENCE APPLICATION ASSOCIATED WITH THE NEW BUILDING.
X01202427-I1
05/08/2025
Special inspection requirement — Maintenance information
05/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
05/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
05/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
05/01/2025
Special inspection requirement — Standpipe Systems
05/01/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Latest 60 of 73 events.
Nothing on file for this building.
1 project · most recent 09/19/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2025——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Bell & Gossett SERIES 80 3X3X9.5C,e-1510 2BD, e-1510X 2.5BB 31,314 BTU · Pump ×3
e-80 3X7C 13,894 BTU · Heat Exchanger ×3
Trane CSAA-035; CSAA-012; CSAA-010; CSAA-017 18,775 CFM · Ahu ×5
Heating
Sterling RW-1130-04, W-1180-04, W-1180-02, RW-1130-03, W-1180-03,W-1180-02 3,190 CFM · Unit Heater ×10
Bell & Gossett e-80 2.5X7B 2,763 BTU · Other ×1
Water Furnace TRUCLIMATE 500 117 tons · Heat Pump Outdoor ×1
Ventilation
Price FHP 12, FHP 08 5,850 CFM · Fan Coil Indoor ×6
Greenheck USF-36-B4, BSQ-80 24,850 CFM · Exhaust Fan ×2
1 project · most recent 09/19/2025
Sprinkler System
FiledStatusContractorScope
09/19/2025——Sprinkler System
1 project · most recent 09/19/2025
Storm Water/Sanitary
FiledStatusContractorScope
09/19/2025——Storm, Water/Sanitary
1 project · most recent 09/19/2025
Steel Concrete Wood
FiledStatusContractorScope
09/19/2025——Steel, Concrete, Wood
1 project · most recent 09/19/2025
Fence
FiledStatusContractorScope
09/19/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/19/2025Public Assembly Emergency Lighting—progress
07/24/2025Construction Utilizing CLT or SCL, Type IV—special
07/24/2025Wood – Seismic Resistance—special
07/10/2025Fire-Resistant Penetrations and Joints—special
05/08/2025Maintenance information—energy_progress
05/08/2025HVAC-R and service water heating system controls—energy_progress
05/08/2025HVAC-R and service water piping design and insulation—energy_progress
05/08/2025HVAC-R and service water heating equipment—energy_progress
05/05/2025Fire-Resistant Penetrations and Joints—special
05/05/2025Energy Code Compliance Inspections—progress
05/01/2025Standpipe Systems—special
05/01/2025Structural Steel - High Strength Bolting—special
05/01/2025Structural Steel - Welding—special
05/01/2025Wood – High-Load Diaphragms—special
05/01/2025Post-installed Anchors—special
05/01/2025Concrete - Cast-In-Place—special
05/01/2025Structural Wood Frame—progress
05/01/2025Deep Foundation Elements—special
05/01/2025Concrete - Cast-In-Place—special
05/01/2025Structural Steel - Details—special
04/30/2025Final—progress
04/30/2025Final—progress
04/16/2025Final—progress
04/16/2025Final—progress
04/16/2025Footing and Foundation—progress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/18/2026X01202427-Z4Request digital key ↗
08/18/2026X01202427-Z3Request digital key ↗
08/18/2026X01202427-Z2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/17/2026X01273853-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/18/2026X01202427-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026X01202427-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/18/2026X01202427-Z3Open ↗
08/18/2026X01202427-Z2Open ↗
08/18/2026X01202427-Z1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/01/2025240362433Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/18/2026X01202427-Z3Open ↗
08/18/2026X01202427-Z2Open ↗
08/18/2026X01202427-Z1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSupersede Letter1
08/18/2026X01202427-Z1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/01/2025240362433Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/18/2026X01202427-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/18/2026X01202427-I1Open ↗
▸DOB NOWAlternate Plan 11
08/17/2026X01273853-I1Open ↗
▸DOB NOWAlternate Plan 21
08/17/2026X01273853-I1Open ↗