← Back
Walk-up apt, over six families with stores
Urban Renaissance
851 TINTON AVENUE · BIN 2004699
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R6Zoning
18,200 sfGross Floor Area
21Units
Rent Stabilized93 Open Violations 81 unresolved · 12 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: URBAN RENAISSANCE COLLABORATION LTD · 4,177 sf lot · 4.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 2 filings · 20 docs
Floor 5Under Construction10p · 1 filing · 18 docs
Floor 4Under Construction10p · 1 filing · 18 docs
Floor 3Under Construction10p · 1 filing · 18 docs
Floor 2Under Construction10p · 1 filing · 18 docs
Floor 1Under Construction12p · 1 filing · 18 docs
CellarUnder Construction13p · 1 filing · 18 docs
1 job · most recent 11/24/2025
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/24/2025Permit IssuedNOTIAS CONSTRUCTION INCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Ephoca AIO WALL MOUNTED 6,000 BTU · Heat Pump Outdoor ×51
Heating
Stelpro ARWF1001T 1,750 BTU · Electric Heater ×41
AWFA2008T 6,826 BTU · Electric Heater ×3
1 job · most recent 11/24/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/24/2025Permit IssuedAMERICAN STANDARD P&H CORGas, Storm, Water/Sanitary
2 jobs · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026Permit IssuedFIRST CHOICE ELECTRICAL—
12/18/2025Permit IssuedTECHNO-VOLT ELEC, INCGeneral Wiring
1 job · most recent 05/07/2026
Sidewalk Shed
FiledStatusContractorScope
05/07/2026Permit IssuedAKM CONSTRUCTION NY CORPSidewalk Shed
1 job · most recent 06/17/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/17/2026Permit IssuedPREMIER CONSTRUCTION INCSuspended Scaffold (SC)
Building Lifecycle
All (127)Filed (6)Permit Issued (9)Violation (60)Objection (30)Special Inspection (22)
09/03/2026
Permit issued — Sidewalk Shed
X01395297-I1-SH
07/27/2026
Permit issued — General Construction
X01177145-I1-GC
07/27/2026
Permit issued — Mechanical Systems
X01177145-S2-MS
06/30/2026
Permit issued — Suspended Scaffold
X01417129-I1-SC
06/17/2026
Filed — Alteration
SUSPENDED SCAFFOLDING AND ROOF HOIST IN ORDER TO PERFORM FACADE EXTERIOR WORK. FACADE INSPECTIONS TO BE DONE. SIDEWALK SHED TO BE INSTALLED UNDER SEPARATE APPLICATION. NO CHANGE IN USE OCCUPANCY, EGRSS UNDER THIS APPLICATION.
X01417129-I1
06/05/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, open)
B
05/27/2026
Violation issued (HPD, open)
B
05/27/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, open)
B
05/13/2026
Permit issued — Mechanical Systems
X01177145-S2-MS
05/08/2026
Permit issued — Sidewalk Shed
X01395297-I1-SH
05/07/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING FACADE REPAIRS FILED UNDER APPLICATION #X01177145-I1, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01395297-I1
04/23/2026
Permit issued — Boiler Equipment
X01177145-S3-BE
04/23/2026
Permit issued — Plumbing
X01177145-S1-PL
04/16/2026
Violation issued (HPD, open)
A
04/16/2026
Violation issued (HPD, open)
A
04/16/2026
Violation issued (HPD, open)
B
01/14/2026
Permit issued — General Construction
X01177145-I1-GC
11/24/2025
Filed — Alteration
Propose removals of existing, baseboard, hydronic heating supply and return, and boilers and associated piping. Install condensate pumps, PTHP, dehumidifier and electric heater as per plan, filed in conjunction with GC and PL # X01177145-I1 and S1.
X01177145-S3
11/19/2025
Special inspection requirement — Heating Systems
MINA HANNA
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
11/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
MINA HANNA
11/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MINA HANNA
11/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
11/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
11/14/2025
Special inspection requirement — Chimneys and vents
MINA HANNA
11/14/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
11/14/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
11/13/2025
Violation issued (HPD, open)
B
11/13/2025
Violation issued (HPD, open)
B
11/13/2025
Violation issued (HPD, open)
B
11/13/2025
Violation issued (HPD, open)
C
11/13/2025
Violation issued (HPD, open)
B
11/13/2025
Violation issued (HPD, open)
B
11/13/2025
Violation issued (HPD, open)
B
09/30/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Admin
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/12/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
06/26/2025
Objection raised — Admin
06/26/2025
Objection raised — Scope
06/13/2025
Objection raised — Other
06/13/2025
Objection raised — Scope
06/13/2025
Objection raised — Scope
06/10/2025
Filed — Alteration
Propose removals of existing, baseboard, hydronic heating supply and return, and boilers and associated piping. Install condensate pumps, PTHP, dehumidifier and electric heater as per plan, filed in conjunction with GC and PL # X01177145-I1 and S1.
X01177145-S1
06/05/2025
Violation issued (HPD, closed)
A
Latest 60 of 127 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROMESA HDFC URBAN RENAIS103/22/2026
DELIGHT CONSTRUCTION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC105/07/2026
ROSENTHAL ENGINEERING PLLC311/24/2025
STAT ARCHITECTURE PC105/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOTIAS CONSTRUCTION INCGeneral Contractor407/28/2026
AKM CONSTRUCTION NY CORPGeneral Contractor209/07/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
PANDELI GJINIElectrical103/21/2026
PREMIER CONSTRUCTION INCGeneral Contractor107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344411/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP09/03/2026
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC07/27/2026
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC07/27/2026
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC06/30/2026
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC05/13/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP05/08/2026
DOB NOWBoiler EquipmentPermit IssuedAMERICAN STANDARD P&H CORORP.04/23/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.04/23/2026
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC01/14/2026
BISBLISSUEDCHINATOWN PLBG & HTG INC04/20/2005
BIS—ISSUEDDELIGHT CONSTRUCTION CORP.03/22/2005
BISEQISSUEDDELIGHT CONSTRUCTION CORP.05/26/2004
BIS—ISSUEDDELIGHT CONSTRUCTION CORP.04/07/2004
BISPLISSUEDCHINATOWN PLBG & HTG INC03/22/2004
BISSPISSUEDCHINATOWN P&H INC03/22/2004
BISPLISSUEDCHINATOWN PLBG & HTG INC03/16/2004
BISEQISSUEDDELIGHT CONSTRUCTION CORP.02/04/2004
BISEQISSUEDLILLY CONST CO INC01/26/2002
BISEQISSUEDLILLY CONST CO INC10/22/2001
BISOTISSUEDMART CONSTRUCTION02/12/1997
BISBLISSUEDBROOK FUEL OIL CORP.06/24/1991
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/19/2025Heating SystemsMINA HANNAspecial
11/19/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
11/19/2025HVAC-R and service water heating equipmentMINA HANNAenergy_progress
11/19/2025HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
11/19/2025HVAC-R and service water heating system controlsMINA HANNAenergy_progress
11/19/2025Tenant Protection Plan ComplianceMINA HANNAspecial
11/14/2025Chimneys and ventsMINA HANNAspecial
11/14/2025Energy Code Compliance InspectionsMINA HANNAprogress
11/14/2025Energy Code Compliance InspectionsMINA HANNAprogress
04/09/2025HVAC-R and service water heating equipmentMINA HANNAenergy_progress
04/09/2025Maintenance informationMINA HANNAenergy_progress
04/09/2025Shutoff dampersMINA HANNAenergy_progress
04/09/2025HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
04/09/2025HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
04/09/2025HVAC-R and service water heating system controlsMINA HANNAenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/09/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/09/2025Tenant Protection Plan ComplianceMINA HANNAspecial
04/09/2025HVAC-R and service water heating system controlsMINA HANNAenergy_progress
04/09/2025HVAC-R and service water heating equipmentMINA HANNAenergy_progress
04/07/2025FinalMINA HANNAprogress
04/07/2025Mechanical SystemsMINA HANNAspecial
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026X01177145-S1Request digital key ↗
08/17/2026X01177145-S2Request digital key ↗
08/17/2026X01177145-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026X01177145-S3Open ↗
08/23/2026X01177145-S1Open ↗
08/23/2026X01177145-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026X01177145-S3Open ↗
08/23/2026X01177145-S1Open ↗
08/23/2026X01177145-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026X01395297-I1Open ↗
08/13/2026X01177145-S3Open ↗
08/13/2026X01177145-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026X01177145-S3Open ↗
08/13/2026X01177145-I1Open ↗
08/13/2026X01177145-S1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/16/2026X01395297-I1Open ↗
08/13/2026X01177145-S1Open ↗
08/13/2026X01177145-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/16/2026X01417129-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026X01417129-I1Open ↗