LL97 Covered2 Open Violations 1 unresolved · 1 paperwork only▸
ECB03/19/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS$1K due
ECB02/25/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESSNothing owed — awaiting certificate of correction
School or academy · 60,055 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.