← Back
Walk-up apt, over six families with stores
8517 3 AVENUE
BROOKLYN · BIN 3424493
💬 Discuss this project
1927Year Built
4Stories
C7Building Class
R6BZoning
36,329 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized172 Open Violations 171 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 309 86TH ST REALTY CORP · 12,500 sf lot · 2.91 FAR built · Flood zone X
Locations of Work
StructuralPlumbingGeneral
Cellar5p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
309 86TH ST.REALTY CORP T103/22/2026
PIONEER GENERAL CONST CO103/22/2026
309 86TH ST REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGIOS G GEORGOPOULOS, R.A.305/18/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JUST PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGIOS G. GEORGOPOULOS,1192305/18/2023
Building Lifecycle
All (23)Filed (3)Permit Issued (2)Signed Off (1)Violation (13)Inspection (1)Special Inspection (3)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/17/2023
Signed off — Alteration
Remove and replace existing boiler with new at cellar floor. No change in use, egress or occupancy.
B00739952-I1
05/31/2023
Special inspection requirement — Heating Systems
Georgios Georgopoulos
05/18/2023
Filed — Alteration
Remove and replace existing boiler with new at cellar floor. No change in use, egress or occupancy.
B00739952-P1
05/11/2023
Special inspection requirement — Heating Systems
Georgios Georgopoulos
05/09/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/31/2022
Permit issued — Plumbing
B00740159-I1-PL
09/08/2022
Permit issued — Boiler Equipment
B00739952-I1-BE
07/05/2022
Filed — Alteration
RELATED PLUMBING WORK IN CONJUNCTION WITH BOILER REPLACEMENT AT CELLAR UNDER JOB #B00739952. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00740159-I1
07/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
06/17/2022
Filed — Alteration
Remove and replace existing boiler with new at cellar floor. No change in use, egress or occupancy.
B00739952-I1
02/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/22/2020
Violation issued (ECB, closed)
Construction
08/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/19/2009
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK10/31/2022
DOB NOWBoiler EquipmentSigned-offMOHAMED ABDELRAZEK09/08/2022
1 project · most recent 07/05/2022
Gas Water/Sanitary
FiledStatusContractorScope
07/05/2022Permit Issued2M MECHANICAL LLCGas, Water/Sanitary
2 projects · most recent 12/07/2019
FiledStatusContractorScope
12/07/2019Permit IssuedA J IANNI ELECL CONTS INC—
11/27/2018Permit IssuedA J IANNI ELECL CONTS INC—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/09/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/31/2023Heating SystemsGeorgios Georgopoulosspecial
05/11/2023Heating SystemsGeorgios Georgopoulosspecial
07/05/2022Fire-Resistant Penetrations and JointsGeorgios Georgopoulosspecial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00740159-I1Request digital key ↗
08/27/2026B00739952-I1Request digital key ↗
08/27/2026B00739952-P1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
05/08/2019321769083Open ↗
06/15/2018321769083Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/26/2019321769083Open ↗
▸BISWORK PERMIT APPLICATION1
12/04/2018321769083Open ↗
▸Seals & Professional Certifications13
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/15/2018321769083Open ↗
06/15/2018321769083Open ↗
06/15/2018321769083Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/06/2019321769083Open ↗
12/04/2018321769083Open ↗
06/15/2018321769083Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00740159-I1Open ↗
08/27/2026B00739952-I1Open ↗
08/27/2026B00739952-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00739952-I1Open ↗
09/01/2026B00739952-P1Open ↗
08/24/2026B00740159-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/15/2018321769083Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00740159-I1Open ↗
08/27/2026B00739952-I1Open ↗
08/27/2026B00739952-P1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/06/2019321769083Open ↗
12/04/2018321769083Open ↗
06/15/2018321769083Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/06/2019321769083Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/06/2019321769083Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/06/2019321769083Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/15/2018321769083Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
06/15/2018321769083Open ↗
▸BISBOROUGH INTAKE FORM1
03/06/2019321769083Open ↗