← Back
One story retail building
852 9 AVENUE
MANHATTAN · BIN 1025423
💬 Discuss this project
1930Year Built
1Stories
K1Building Class
R8Zoning
3,053 sfGross Floor Area
2Units
0 Open Violations
One story retail building · Owner of record: AIDOT HOLDING CORP · 3,552 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 20 docs
Floor 1Under Construction9p · 2 filings · 18 docs
CellarUnder Construction9p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AIDOT HOLDING CORP103/22/2026
ALDOT HOLDING1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRUPO DESIGN508/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CARLOS RAMIREZ303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPEEDWAY CONSTRUCTION CORGeneral Contractor307/08/2026
YLL LOXHAJElectrical103/21/2026
CT IDEAL SUPPRESSIONGeneral Contractor104/09/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GIOVANNI ZAPATA R.A.3882508/03/2026
Building Lifecycle
All (69)Filed (5)Permit Issued (5)Signed Off (1)Violation (6)Inspection (3)Objection (29)Special Inspection (20)
08/19/2026
Objection raised — Cost
08/04/2026
Signed off — Alteration
PROP. PLUMBING WORK FOR INTERIOR RENOVATION OF EXISTING RETAIL STORE UG 6 TO ACCOMMODATE NEW EATING AND DRINKING ESTABLISHMENT AS PER PLANS, NO CHANGE IN USE, OCCUPANCY, CONSTRUCTION CLASSIFICATION OR EGRESS
M01277533-I1
08/03/2026
Filed — Alteration
Installation of HVAC equipment including heating and cooling air conditioning unit and mini-split system for ating/drinking establishment. No change to use, occupancy, or egress.
M01277551-P1
07/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
GIOVANNI ZAPATA
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
07/09/2026
Special inspection requirement — Mechanical Systems
GIOVANNI ZAPATA
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
GIOVANNI ZAPATA
07/09/2026
Special inspection requirement — Final
GIOVANNI ZAPATA
06/16/2026
Permit issued — General Construction
M01273741-I1-GC
04/29/2026
Permit issued — General Construction
M01273741-I1-GC
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/01/2026
Objection raised — Admin
04/01/2026
Objection raised — Cost
03/19/2026
Filed — Alteration
Installation of HVAC equipment including heating and cooling air conditioning unit and mini-split system for ating/drinking establishment. No change to use, occupancy, or egress.
M01277551-I1
03/16/2026
Permit issued — Mechanical Systems
M01277539-I1-MS
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
GIOVANNI ZAPATA
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
GIOVANNI ZAPATA
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/30/2025
Permit issued — Plumbing
M01277533-I1-PL
10/22/2025
Objection resolved — Addressed
10/21/2025
Filed — Alteration
M01277539-I1
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/17/2025
Objection raised — Plumbing
10/17/2025
Objection raised — Zoning
10/17/2025
Objection raised — Plumbing
10/17/2025
Objection raised — Plumbing
10/17/2025
Objection raised — Plumbing
10/17/2025
Objection raised — Plumbing
10/17/2025
Objection raised — Plumbing
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
10/08/2025
Filed — Alteration
PROP. PLUMBING WORK FOR INTERIOR RENOVATION OF EXISTING RETAIL STORE UG 6 TO ACCOMMODATE NEW EATING AND DRINKING ESTABLISHMENT AS PER PLANS, NO CHANGE IN USE, OCCUPANCY, CONSTRUCTION CLASSIFICATION OR EGRESS
M01277533-I1
10/01/2025
Permit issued — General Construction
M01273741-I1-GC
09/16/2025
Objection resolved — Addressed
09/15/2025
Objection raised — Admin
09/15/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/04/2025
Objection raised — Cost
09/04/2025
Objection raised — Fire_Protection
09/04/2025
Objection raised — Fire_Protection
09/04/2025
Objection raised — Admin
08/26/2025
Filed — Alteration
PROP. INTERIOR RENOVATION OF EXISTING RETAIL STORE UG 6 TO ACCOMMODATE NEW EATING AND DRINKING ESTABLISHMENT AS PER PLANS, NO CHANGE IN USE, OCCUPANCY, CONSTRUCTION CLASSIFICATION OR EGRESS
M01273741-I1
08/26/2025
Special inspection requirement — Mechanical Systems
GIOVANNI ZAPATA
08/26/2025
Special inspection requirement — Final
GIOVANNI ZAPATA
08/26/2025
Special inspection requirement — Mechanical Systems
GIOVANNI ZAPATA
08/26/2025
Special inspection requirement — Final
GIOVANNI ZAPATA
08/26/2025
Special inspection requirement — Exterior lighting power
GIOVANNI ZAPATA
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIOVANNI ZAPATA
08/19/2025
Special inspection requirement — Lighting controls
GIOVANNI ZAPATA
08/19/2025
Special inspection requirement — Fenestration air leakage
GIOVANNI ZAPATA
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSPEEDWAY CONSTRUCTION COR06/16/2026
DOB NOWGeneral ConstructionPermit IssuedSPEEDWAY CONSTRUCTION COR04/29/2026
DOB NOWMechanical SystemsPermit IssuedCT IDEAL SUPPRESSION03/16/2026
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC10/30/2025
DOB NOWGeneral ConstructionPermit IssuedSPEEDWAY CONSTRUCTION COR10/01/2025
BIS—ISSUEDROTH BUILT WORKS INC11/25/2015
BISPLISSUEDP.A.C. HEATING INC11/09/2015
BIS—ISSUEDSTREAMLINE CORP08/05/2015
BIS—ISSUEDSTREAMLINE CORP05/08/2015
BISOTISSUEDPOLNORD LLC04/29/2013
BISPLISSUEDP.A.C. HEATING INC03/27/2013
BISOTISSUEDDYNASTY AIR COND. INC03/22/2013
BISPLISSUEDORION PLUMBING & HTG CORP09/19/2012
BISEQISSUEDCONSTRUCTION EXPERT INC09/19/2012
BISOTISSUEDCONSTRUCTION EXPERT INC09/19/2012
BIS—ISSUEDUNITECH DESIGN INC08/15/2002
BISOTISSUEDNOVA PLUMB HEAT INC.03/11/2002
BISEQISSUEDHD GLASS INC03/08/2002
BISPLISSUEDAVON PLBG & HTG INC03/08/2002
1 project · most recent 08/03/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026——Air Conditioning Systems
Cooling
Innovar VOM36H7R4P7 36,000 BTU · Split System ×2
Luxaire WP150E18P2AAAAA1A1 12 tons · Heat Pump Outdoor ×2
1 project · most recent 10/08/2025
Water/Sanitary
FiledStatusContractorScope
10/08/2025Signed-offGREGG NY PLUMBING, INCWater/Sanitary
1 project · most recent 09/28/2026
General Wiring
FiledStatusContractorScope
09/28/2026Permit IssuedAMSTERDAM ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
07/09/2026HVAC-R and service water heating system controlsGIOVANNI ZAPATAenergy_progress
07/09/2026Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
07/09/2026Mechanical SystemsGIOVANNI ZAPATAspecial
07/09/2026Energy Code Compliance InspectionsGIOVANNI ZAPATAprogress
07/09/2026FinalGIOVANNI ZAPATAprogress
03/05/2026Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
03/05/2026Energy Code Compliance InspectionsGIOVANNI ZAPATAprogress
03/05/2026HVAC-R and service water heating system controlsGIOVANNI ZAPATAenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
08/26/2025Mechanical SystemsGIOVANNI ZAPATAspecial
08/26/2025FinalGIOVANNI ZAPATAprogress
08/26/2025Mechanical SystemsGIOVANNI ZAPATAspecial
08/26/2025FinalGIOVANNI ZAPATAprogress
08/26/2025Exterior lighting powerGIOVANNI ZAPATAenergy_progress
08/19/2025Structural Stability – Alterations of existing buildingsGIOVANNI ZAPATAspecial
08/19/2025Lighting controlsGIOVANNI ZAPATAenergy_progress
08/19/2025Fenestration air leakageGIOVANNI ZAPATAenergy_progress
08/19/2025Fenestration and door U-factor and product ratingsGIOVANNI ZAPATAenergy_progress
08/19/2025Interior lighting powerGIOVANNI ZAPATAenergy_progress
08/19/2025Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
▾Documents — 181 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026M01273741-I1Request digital key ↗
08/21/2026M01277533-I1Request digital key ↗
08/21/2026M01277539-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION16
09/06/2017121783926Open ↗
12/28/2016121530646Open ↗
11/01/2016121530646Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION11
12/10/2015121783926Open ↗
11/19/2015121783926Open ↗
08/14/2015121783926Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
06/21/2017121373735Open ↗
10/31/2016121783926Open ↗
06/22/2016121783926Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISAMENDED ZONING DIAGRAM1
10/20/2015121783926Open ↗
▸BISZONING DIAGRAM1
08/21/2014121783926Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
07/02/2014121783926Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
07/02/2014121783926Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/06/2017121783926Open ↗
▸BISZONING RESOLUTION DETERMINATION1
03/27/2014121783926Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/06/2017121783926Open ↗
▸Seals & Professional Certifications43
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/10/2017121783926Open ↗
11/03/2016121530646Open ↗
10/31/2016121373735Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M01273741-I1Open ↗
09/02/2026M01273741-I1Open ↗
09/02/2026M01273741-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M01273741-I1Open ↗
09/02/2026M01273741-I1Open ↗
09/02/2026M01277551-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026M01277539-I1Open ↗
08/18/2026M01277551-P1Open ↗
08/18/2026M01277551-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/13/2013121530646Open ↗
09/13/2012121373735Open ↗
09/12/2012121373735Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/13/2013121530646Open ↗
09/12/2012121373735Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING3
09/24/2013121783926Open ↗
12/28/2012121373735Open ↗
09/12/2012121373735Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
01/06/2016121783926Open ↗
06/12/2013121373735Open ↗
05/09/2013121373735Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/13/2015121783926Open ↗
▸BISEQUIPMENT USE PERMITS1
03/20/2017121530646Open ↗
▸Safety & Tenant Protection14
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist5
08/18/2026M01277551-P1Open ↗
08/13/2026M01273741-I1Open ↗
08/13/2026M01277533-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
09/24/2013121783926Open ↗
05/02/2013121603185Open ↗
09/12/2012121373735Open ↗
▸BISANTI-HARASSMENT CHECKLIST: CLINTON2
07/02/2014121783926Open ↗
09/12/2012121373735Open ↗
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist2
07/26/2013121603185Open ↗
02/13/2013121530646Open ↗
▸BISST-1 Street Tree Checklist1
02/13/2013121530646Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/12/2015121783926Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026M01277539-I1Open ↗
08/18/2026M01277551-P1Open ↗
08/18/2026M01277551-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/02/2014121783926Open ↗
09/13/2012121373735Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
08/10/2017121783926Open ↗
10/27/2016121530646Open ↗
10/27/2016121530646Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/10/2017121783926Open ↗
10/27/2016121530646Open ↗
10/27/2016121373735Open ↗
▸BISTR8: Energy Code Progress Inspections2
02/13/2013121530646Open ↗
09/13/2012121373735Open ↗
▸Inspections & Test Reports3
▸BISCertificate of Inspection Construct Manhole or Catch Basin and Basin Connection1
10/18/2016121783926Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/02/2014121783926Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
02/20/2018121783926Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
02/20/2018121783926Open ↗
02/20/2018121783926Open ↗
10/13/2017121783926Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
05/02/2013121603185Open ↗
02/13/2013121530646Open ↗
09/12/2012121373735Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
07/02/2014121783926Open ↗
09/24/2013121783926Open ↗
▸BISSUPERSEDING LETTER2
12/10/2015121783926Open ↗
05/06/2013121530646Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
09/12/2014121783926Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
09/06/2017121783926Open ↗
08/10/2017121783926Open ↗
03/17/2017121530646Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION10
09/06/2017121783926Open ↗
06/28/2017121783926Open ↗
01/25/2017121783926Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET4
09/24/2013121783926Open ↗
05/02/2013121603185Open ↗
02/13/2013121530646Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
02/20/2018121783926Open ↗
02/20/2018121783926Open ↗
10/13/2017121783926Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/10/2017121783926Open ↗
▸BISPLOT DIAGRAM1
09/06/2017121783926Open ↗