← Back
STATEN ISLAND
853 EDGEGROVE AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5176484
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentCivil
Roof2p · 1 filing · 3 docs
Floor 218p · 2 filings · 20 docs
Floor 118p · 3 filings · 20 docs
Basement17p · 2 filings · 20 docs
Site & exterior3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GRAND PRIX AUTO SERVICES INC.2307/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAWN PONISI403/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. SMITH CONSTRUCTION INC.General Contractor707/08/2026
ENERGY BRITE INS & SOLARGeneral Contractor107/08/2026
FINE MECHANICAL CORPPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738403/18/2025
THOMAS PETERSEN ARCHITECT7854111/08/2024
Building Lifecycle
All (62)Filed (7)Permit Issued (7)Signed Off (5)Violation (1)Inspection (12)Special Inspection (30)
08/14/2025
Signed off — Alteration
S01002776-I1
07/11/2025
Signed off — Alteration
S01136491-I1
03/28/2025
Signed off — New Building
COMPLETE PLUMBING AND DRAINAGE FOR PROPOSED ONE FAMILY DWELLING
S00981673-S1
03/27/2025
Signed off — New Building
COMPLETE PLUMBING AND DRAINAGE FOR PROPOSED ONE FAMILY DWELLING
S00981673-S2
03/18/2025
Filed — New Building
COMPLETE PLUMBING AND DRAINAGE FOR PROPOSED ONE FAMILY DWELLING
S00981673-P1
01/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
01/30/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
01/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
01/30/2025
Special inspection requirement — Structural Steel - Details
anthony santoro
01/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
01/30/2025
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
01/30/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/30/2025
Special inspection requirement — Final
anthony santoro
01/30/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
01/30/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
01/30/2025
Special inspection requirement — Footing and Foundation
anthony santoro
01/30/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
01/30/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
01/30/2025
Special inspection requirement — Air barrier — testing
anthony santoro
01/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
01/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
01/30/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
01/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
01/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
01/30/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
01/30/2025
Special inspection requirement — Fenestration areas
anthony santoro
01/30/2025
Special inspection requirement — Interior lighting power
anthony santoro
01/30/2025
Special inspection requirement — Permanent certificate
anthony santoro
01/30/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
01/30/2025
Special inspection requirement — Maintenance information
anthony santoro
01/30/2025
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
01/29/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/21/2025
Permit issued — Curb Cut
S01002776-I1-CC
01/21/2025
Permit issued — Mechanical Systems
S00981673-S2-MS
01/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/13/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/04/2024
Signed off — Alteration
S00986122-I1
11/15/2024
Permit issued — Solar
S01136491-I1-SL
11/08/2024
Filed — Alteration
S01136491-I1
10/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/01/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/29/2024
Filed — New Building
COMPLETE PLUMBING AND DRAINAGE FOR PROPOSED ONE FAMILY DWELLING
S00981673-S2
04/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2024
Permit issued — Plumbing
S31434043-S1-PL
04/18/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/17/2024
Special inspection requirement — Ventilation and air distribution system
anthony santoro
04/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2024
Permit issued — General Construction
S00981673-I1-GC-CX
03/05/2024
Violation issued (ECB, closed)
Construction
02/16/2024
Filed — Alteration
S01002776-I1
01/23/2024
Permit issued — Plumbing
S00981673-S1-PL
01/12/2024
Permit issued — Construction Fence
S00986122-I1-FN
01/11/2024
Filed — New Building
COMPLETE PLUMBING AND DRAINAGE FOR PROPOSED ONE FAMILY DWELLING
S00981673-S1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ. SMITH CONSTRUCTION INC01/21/2025
DOB NOWMechanical SystemsSigned-offJ. SMITH CONSTRUCTION INC01/21/2025
DOB NOWSolarSigned-offENERGY BRITE INS & SOLAR11/15/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/24/2024
DOB NOWGeneral ConstructionPermit IssuedJ. SMITH CONSTRUCTION INC04/04/2024
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP01/23/2024
DOB NOWConstruction FenceSigned-offJ. SMITH CONSTRUCTION INC01/12/2024
1 project · most recent 03/18/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/18/2025Signed-offJ. SMITH CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Aciq R4A4S42AKANAAAAC 3 tons · Condensing Unit ×8
Ventilation
Fantech FIT70E 68 CFM · Erv ×8
1 project · most recent 03/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/18/2025Signed-offFINE MECHANICAL CORPGas, Storm, Water/Sanitary
2 projects · most recent 08/05/2024
General Wiring
FiledStatusContractorScope
08/05/2024CompleteASCUATECH ELECTRICAL CORP—
06/19/2024CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
01/29/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/18/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
01/30/2025Fire-Resistance Rated Constructionanthony santoroprogress
01/30/2025Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
01/30/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
01/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
01/30/2025Structural Steel - Detailsanthony santorospecial
01/30/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
01/30/2025Wood – Prefabricated I-Joistsanthony santorospecial
01/30/2025Energy Code Compliance Inspectionsanthony santoroprogress
01/30/2025Finalanthony santoroprogress
01/30/2025Subgrade Inspectionsanthony santorospecial
01/30/2025Concrete - Cast-In-Placeanthony santorospecial
01/30/2025Footing and Foundationanthony santoroprogress
01/30/2025Structural Wood Frameanthony santoroprogress
01/30/2025Fenestration air leakageanthony santoroenergy_progress
01/30/2025Air barrier — testing anthony santoroenergy_progress
01/30/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/30/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
01/30/2025Insulation placement and R valuesanthony santoroenergy_progress
01/30/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
01/30/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
01/30/2025Air barrier - visual inspectionanthony santoroenergy_progress
01/30/2025Fenestration areasanthony santoroenergy_progress
01/30/2025Interior lighting poweranthony santoroenergy_progress
01/30/2025Permanent certificateanthony santoroenergy_progress
01/30/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
Latest 25 of 45.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026S00986122-I1Request digital key ↗
08/21/2026S01002776-I1Request digital key ↗
08/21/2026S00981673-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
01/30/2024540262179Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00981673-I1Open ↗
08/13/2026S00981673-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00981673-I1Open ↗
08/13/2026S00981673-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/14/2023540262179Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00981673-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S00981673-S1Open ↗
09/01/2026S00981673-S1Open ↗
09/01/2026S00981673-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S00986122-I1Open ↗
08/21/2026S01002776-I1Open ↗
08/21/2026S00981673-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S00981673-S1Open ↗
09/01/2026S00981673-S1Open ↗
09/01/2026S00981673-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/04/2023540262179Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/04/2023540262179Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00981673-I1Open ↗
08/13/2026S00981673-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/21/2026S00981673-P1Open ↗
08/21/2026S00981673-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00981673-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00981673-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00981673-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT3
08/13/2026S00981673-P1Open ↗
08/13/2026S00981673-S1Open ↗
08/13/2026S00981673-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00981673-S1Open ↗
08/13/2026S00981673-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
12/04/2023540262179Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/04/2023540262179Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00981673-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/30/2024540262179Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01136491-I1Open ↗
▸Other Documents14
▸BISBPP - SUPPORTING DOCUMENTATION2
01/30/2024540262179Open ↗
12/04/2023540262179Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00981673-P1Open ↗
08/13/2026S00981673-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00981673-I1Open ↗
08/13/2026S00981673-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S00981673-P1Open ↗
08/21/2026S00981673-I1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
12/14/2023540262179Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
12/04/2023540262179Open ↗
▸BISPLOT DIAGRAM1
01/30/2024540262179Open ↗
▸BISWAIVER FROM DOT FOR SIDEWALK ALIGNMENT.1
01/30/2024540262179Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/14/2023540262179Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00981673-I1Open ↗