← Back
One family attached or semi-detached
853 MANOR ROAD
💬 Discuss this project
1975Year Built
2Stories
A5Building Class
R3-1Zoning
1,440 sfGross Floor Area
1Units
0 Open Violations
One family attached or semi-detached · Owner of record: ESQUERRA · 2,716 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ESQUERRA103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/07/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
08/26/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01118513-I1
10/18/2024
Permit issued — Solar
S01118513-I1-SL
10/07/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01118513-I1
09/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/27/2024
Special inspection requirement — Final
Walid Abdulla
09/27/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/19/2016
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/18/2024
1 project · most recent 10/08/2024
General Wiring
FiledStatusContractorScope
10/08/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/27/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/27/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/27/2024Energy Code Compliance InspectionsWalid Abdullaprogress
09/27/2024FinalWalid Abdullaprogress
09/27/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01118513-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/22/2026S01118513-I1Open ↗
09/22/2026S01118513-I1Open ↗
09/22/2026S01118513-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/22/2026S01118513-I1Open ↗
09/22/2026S01118513-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026S01118513-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026S01118513-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01118513-I1Open ↗