← Back
Single or multiple dwelling with stores or offices
854 FRANKLIN AVENUE
BROOKLYN · BIN 3029698
💬 Discuss this project
1925Year Built
3Stories
S9Building Class
R6AZoning
4,721 sfGross Floor Area
7Units
Rent Stabilized30 Open Violations 26 unresolved · 4 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 999 PRESIDENT STREET, LLC · 2,000 sf lot · 2.36 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
999 PRESIDENT STREET603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2019$1.0M—Private party → 999 PRESIDENT STREET, LLC$215/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOKA ENGINEERING PC107/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RESTAURANT DESIGN 360103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMPTON WEBSTERElectrical203/21/2026
BOYD, JOHNElectrical103/21/2026
SCHORR, NATHANElectrical103/21/2026
Building Lifecycle
All (85)Filed (1)Violation (60)Objection (12)Special Inspection (12)
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
10/28/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/12/2025
Objection resolved — Addressed
09/12/2025
Objection resolved — Addressed
08/08/2025
Objection resolved — Addressed
08/08/2025
Objection resolved — Addressed
07/29/2025
Objection raised — Mechanical
07/29/2025
Objection raised — Admin
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Scope
07/16/2025
Filed — Alteration
Build partition walls as per plans. Install a new Kitchen hood, Make-up air, and duct system. Install cooking equipment. Install power control, power outlets, and interior lighting.
B01213547-I1
07/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
07/03/2025
Special inspection requirement — Duct leakage testing, insulation and design
07/03/2025
Special inspection requirement — Maintenance information
07/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
07/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
07/02/2025
Special inspection requirement — Lighting controls
07/02/2025
Special inspection requirement — Interior lighting power
06/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/09/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
B
04/21/2025
Violation issued (HPD, open)
B
04/21/2025
Violation issued (HPD, open)
C
04/21/2025
Special inspection requirement — Final
04/21/2025
Special inspection requirement — Mechanical Systems
04/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/01/2025
Violation issued (ECB, open)
Construction
11/27/2024
Violation issued (HPD, open)
I
04/10/2024
Violation issued (HPD, open)
A
08/05/2023
Violation issued (HPD, open)
C
08/05/2023
Violation issued (HPD, open)
B
08/05/2023
Violation issued (HPD, open)
C
08/05/2023
Violation issued (HPD, closed)
C
03/22/2023
Violation issued (HPD, open)
A
11/10/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, open)
A
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2022
Violation issued (ECB, closed)
Construction
11/05/2021
Violation issued (ECB, open)
Construction
04/08/2021
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, open)
A
10/30/2019
Violation issued (HPD, closed)
I
05/23/2019
Violation issued (HPD, open)
B
05/23/2019
Violation issued (HPD, closed)
B
05/23/2019
Violation issued (HPD, closed)
A
05/23/2019
Violation issued (HPD, closed)
A
05/23/2019
Violation issued (HPD, closed)
A
05/23/2019
Violation issued (HPD, closed)
B
05/23/2019
Violation issued (HPD, closed)
B
05/23/2019
Violation issued (HPD, closed)
B
05/23/2019
Violation issued (HPD, closed)
B
05/23/2019
Violation issued (HPD, open)
C
05/23/2019
Violation issued (HPD, open)
C
05/23/2019
Violation issued (HPD, open)
B
05/23/2019
Violation issued (HPD, open)
A
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFPISSUEDMEGA FIRE PROTECTION INC.07/06/2004
BISOTISSUEDM & D CONSTRUCTION CO02/05/2002
BISFPISSUEDIDEAL FIRE CONTROL INC.01/06/1992
1 project · most recent 07/16/2025
Others
FiledStatusContractorScopeMake / Model / Capacity
07/16/2025——Others
Other
Ecn-Aire UPBLAST FAN MOD# EADU180H 2,600 CFM · Exhaust Fan ×1
Greenheck SUPPLY FAN MOD# SQ-140-VG7X-QD 2,300 CFM · Makeup Air ×1
1 project · most recent 07/16/2025
FiledStatusContractorScope
07/16/2025——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/03/2025HVAC-R and service water heating system controls—energy_progress
07/03/2025Duct leakage testing, insulation and design—energy_progress
07/03/2025Maintenance information—energy_progress
07/03/2025HVAC-R and service water piping design and insulation—energy_progress
07/02/2025HVAC-R and service water heating equipment—energy_progress
07/02/2025Lighting controls—energy_progress
07/02/2025Interior lighting power—energy_progress
06/25/2025Fire-Resistance Rated Construction—progress
06/25/2025Fire-Resistant Penetrations and Joints—special
04/21/2025Final—progress
04/21/2025Mechanical Systems—special
04/21/2025Tenant Protection Plan Compliance—special
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01213547-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026B01213547-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026B01213547-I1Open ↗