DOB04/23/2026FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV AND EXP2 SOUTH ELEV, SEVERE ERODED STONE WORK AROUND WINDOWS ON SEVERAL FLOORS.SPALLING STO NES AT SPANDRELS AT MULTIPLE FLOORS.ROTTED CORNICE AT PARAPET.STEP CRA CKS IN MORTAR JOINTS AT SEVERAL SPANDRELS.REMEDY:REPAIR OR REPLACE
ECB07/18/2024FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES: AT TIME OF INSPECTION IT WAS OBSERVED: AT EXPOSURE 4(WEST ELEVATION) BUILDING WALL AT MULTIPLE LOCATIONS. MAINTAIN EXTERIOR FACADE. TAKE SAFETY MEAS$-2,500 due
HPD05/03/1989SECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS BULKHEAD SOUTH ROOF.
HPD05/03/1989SECTION 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF TABLES 6 STY PUBLIC HALL.
HPD08/22/1988SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING CREATED NORTH WALL REAR SECTION PUBLIC HALL TO ADJOINING BUILDING THROUGHOUT 6 STY.
ECB07/25/2024FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED AT EXP #3(SOUTH ELEV.) BROKEN WINDOW GLASS BETWEEN 10TH AND ROOF. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. PROVNothing owed — awaiting certificate of correction
ECB03/28/201897R05. 97R UNREGISTERED DEVICE WAS INSTALLED WITHOUT PERMIT BEING OBTAINED AND APPLICATION BEING FILED.REMEDY:FILE APPLICATION AND OBTAIN PERMIT FOR WORK AND SCHEDULE TEST APPOINTMENT WITH DOB(CEASE USE).Nothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction